Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML071930125 +
- ML18153A758 +
- ML20098A420 +
- ML20094B678 +
- ML20092C433 +
- ML20092B643 +
- ML20092B586 +
- ML20092B350 +
- ML20092B157 +
- ML20092B137 +
- ML20092B072 +
- ML20092B055 +
- ML20092B043 +
- ML20092B027 +
- ML20092A973 +
- ML20092A965 +
- ML20092A652 +
- ML20092A248 +
- ML20092A242 +
- ML20092A214 +
- ML20092A207 +
- ML20091S364 +
- ML20091R376 +
- NRC-95-0083, Requests one-time Exemption from 10CFR50,App J,Paragraphs III.D.2.a & III.D.3,which Require,In Part,Type B & C Tests to Be Performed at Intervals No Greater than 2 Yrs,To Allow 25% Extension to 2 Yr Testing Interval +
- ML20091P401 +
- ML20129D786 +
- ML20205M079 +
- ML20265B240 +
- ML20211M752 +
- ML20211M681 +
- ML20217N728 +
- NG-95-2644, Provides Further Info Re DAEC Thermo-Lag Installations +
- B15344, Advises NRC That on 950804,util Completed Design Basis Reviews,Analyses,Verifications,Tests & Insps in Accordance W/Gl 89-10.Closeout Rept for Millstone Unit 2 GL 89-10 Will Be Submitted by 951204 +
- NRC-95-4530, Forwards Proprietary Wcobra/Trac Osu Long-Term Cooling Preliminary Validation Rept. Encl Withheld (Ref 10CFR2.790) +
- BECO-LTR-95-091, Forwards Third-Yr Interval ISI Plan for Pilgrim Nuclear Power Station +
- ML20217J789 +
- 05000412/LER-1995-005-02, :on 950226,discovered That TS SR 4.2.4a, Quadrant Power Tilt Ratio Calculation Not Performed Due to Personnel Error.Operator Counseled & Surveillance Verification Log Will Be Further Factored +
- 05000282/LER-1995-009, :on 950802,new Thermal Hydraulic Computer Model of Heat Removal Paths to Ultimate Heat Sink Developed.Caused by Design Basis Accident on Unit.Sys Design Changed +
- ML20092A305 +
- ML20092A313 +
- ML20092A290 +
- IR 05000400/1995012 +
- ML17332A907 +
- ML17311B166 +
- ML17311B168 +
- 05000244/LER-1995-007, :on 950803,lost Power from 34.5 Kv Offsite Power Circuit 751 Due to Offsite Electrical Storm,Resulting in Automatic Start of EDG B.Offsite Power Restored,Edg B Stopped & Realigned & Circuit 751 Cleared +
- ML17332A908 +
- ML17059A931 +
- ML16141A948 +
- ML18011B012 +