Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038B058 +
- ML18101A424 +
- ML20080G059 +
- ML20080B781 +
- ML20080B636 +
- ML20080B524 +
- ML20078N896 +
- ML20078N887 +
- ML20077F656 +
- ML20077E836 +
- ML20077E333 +
- ML20077D283 +
- ML20138H566 +
- ML20138H550 +
- ML20134J860 +
- ML20134K006 +
- ML20134H297 +
- ML20134H314 +
- ML20134G233 +
- ML20134G428 +
- ML20203B680 +
- B15051, Forwards Response to RAI During 941117 Meeting Re Recent Performance Issues Identified During Ongoing Millstone Unit 2 Refueling Outage +
- HL-4738, Provides Implementation Schedule for Power Update for Units 1 & 2.Major Milestones for Program Provided in Encl +
- TAC:M74963 +
- B15046, Responds to RAI Re GL 89-19 Recommendations for Operator Training & SG Overfill Procedures +
- ML20077E917 +
- ML20266C820 +
- ML20091G140 +
- 05000298/LER-1994-028, :on 941101,design Error That Places Ultimate Heat Sink in Unanalyzed Condition During Design Low River Level Conditions Due to Mod Made at End of Plant Const That Created Intake Structure Weir Wall +
- 05000321/LER-1994-013, :on 941103,false Low Turbine Speed Signal Resulted in Inoperable HPCI Sys.Caused by Failure or Misadjustment of Turbine Magnetic Speed Pickup.Magnetic Speed Pickup Replaced +
- 05000416/LER-1994-011-02, :on 941101,reactor Scram Occurred During Reactor Protection Sys Surveillance.Caused by Ground Detection Circuit for Division 1 125 Vdc Sys.Repairing Bolted Ground Fault on Negative Pole Lead +
- 05000446/LER-1994-017, :on 941020,determined That One of Two Train B 480 Volt Switchgear Inoperable Due to Inadequate Supports on Current Transformer.Spare Current Transformer Removed from Switchgear +
- ML20078M942 +
- ML20078M975 +
- IR 05000272/1994007 +
- L-94-292, Forwards Plant Procedures & Training Material Provided for Preparation of Licensing Exams for Reactor Operator Group Xv & SRO Upgrade 94,scheduled for Week of 950227 +
- L-95-138, Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period 930601-941201 +
- ML17352A935 +
- L-95-158, Rept of Changes Made to Facility Under Provisions of 10CFR50.59 for Period 930618-941201 +
- IR 05000528/1994028 +
- GO2-94-268, Files Annual Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each Licensed Reactor +
- GO2-94-266, Informs NRC of Intent to Extend First 10-yr ISI & Test Interval for No Longer than Six Months +
- GO2-94-267, Forwards Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Effect on Cycle 11 Operation +
- ML17352A938 +
- IR 05000269/1994028 +
- ML20078M998 +
- L-94-038, Forwards Public & Central Files Versions of Revised Epips. Central Files Version of Revised EPIPs Withheld +