Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217G9791999-10-14014 October 1999 Forwards SE Accepting Relief Requests to Rev 5 of First 10-year Interval Inservice Insp Program for Plant,Units 1 & 2 ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20217A9311999-09-29029 September 1999 Informs That NRC 6-month Review of Braidwood Identified That Performance in Maint Area Warranted Increased NRC Attention. Addl Insps Beyond Core Insp Program Will Be Conducted Over Next 6 Months to Better Understand Causes of Problem ML20216H4301999-09-23023 September 1999 Informs That Arrangements Made for Administration of Licensing re-take Exams at Braidwood Generating Station for Week of 991108 ML20216F7441999-09-17017 September 1999 Forwards Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824.Three Violations Noted & Being Treated as Ncvs. Insp Focused on C/As & Activities Addressing Technical Concerns Identified During Design Insp Completed on 980424 ML20212A6991999-09-10010 September 1999 Forwards SE Accepting Licensee Second 10-year Interval ISI Program Request for Relief 12R-07 for Plant,Units 1 & 2 ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211Q6611999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Braidwood Operator License Applicants During Wk of 010115 & 22.Validation of Exam Will Occur at Station During Wk of 001218 ML20211P1901999-09-0303 September 1999 Forwards Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20211P1761999-09-0202 September 1999 Discusses Licensee Aug 1998 Rev 3K to Portions of Braidwood Nuclear Power Station Generating Stations Emergency Plan Site Annex Submitted Under Provisions of 10CFR50.54(q). NRC Approval Not Required ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210U8031999-08-0404 August 1999 Forwards SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval for Second 10-year Inservice Testing Program BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K9761999-07-30030 July 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs, for Plant ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. ML20210G6291999-07-29029 July 1999 Forwards Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20210C3961999-07-20020 July 1999 Forwards Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Weakness Identified on 990523,when Station Supervisors Identified Individual Sleeping in Cable Tray in RCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted IR 05000456/19993011999-07-15015 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301OL & 50-457/99-301OL for Test Administered from 990607-11 to Applicants for Operating Licenses.Three Out of Four Applicants Passed Exams ML20209H5141999-07-14014 July 1999 Discusses 990701 Telcon Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Braidwood Nuclear Generating Station for Week of 990927,which Coincides with Licensee Regularly Scheduled Exam Cycle ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196H0631999-06-28028 June 1999 Provides Individual Exam Results for Licensee Applicants Who Took June 1999 Initial License Exam.Without Encls ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20196D4591999-06-18018 June 1999 Forwards Insp Repts 50-456/99-07 & 50-457/99-07 on 990414- 0524.No Violations Noted.Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20196A6671999-06-17017 June 1999 Refers to 990609 Meeting with Util in Braidwood,Il Re Licensee Initiatives in Risk Area & to Establish Dialog Between SRAs & Licensee PRA Staff 05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below1999-06-16016 June 1999 Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below 05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations1999-06-16016 June 1999 Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed1999-06-15015 June 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed ML20195J3741999-06-14014 June 1999 Forwards Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted.Sg Insp Program Found to Be Thorough & Conservative BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.51999-06-10010 June 1999 Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 ML20195F3231999-06-0909 June 1999 Informs That in ,Arrangements Finalized for Exam to Be Administered at Plant During Wk of 990607.All Parts of Plant Initial Licensed Operator Exam Approved for Administration 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes 05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below1999-06-16016 June 1999 Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below 05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations1999-06-16016 June 1999 Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed1999-06-15015 June 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.51999-06-10010 June 1999 Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs 05000457/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed1999-05-21021 May 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20206T3351999-05-17017 May 1999 Provides Written follow-up of Request for NOED Re Extension of Shutdown Requirement of TS Limiting Condition for Operation 3.0.3.Page 9 of 9 of Incoming Submittal Not Included ML20206N7861999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Braidwood Station. Rept Contains Info Associated with Stations Radiological Environ & Meteorological Monitoring Programs ML20206Q8521999-05-13013 May 1999 Submits Rept on Numbers of Tubes Plugged or Repaired During SG Inservice Insp Activities Conducted During Plant Seventh Refueling outage,A2R07,per TS 5.6.9 ML20210C7221999-05-0303 May 1999 Forwards Initial License Exam Matls for Review & Approval. Exam Scheduled for Wk of 990607 ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206E3991999-04-29029 April 1999 Forwards 1998 Annual Environ Operating Rept & Listed Attachments Included in Rept.Without Encls ML20206C7901999-04-23023 April 1999 Provides Suppl Info Re Use of W Dynamic Rod Worth Measurement Technique,As Requested During 990413 Telcon.Rev Bars in right-hand Margin Identify Changes from Info Submitted by ML20206B3941999-04-21021 April 1999 Forwards Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors, for Byron & Braidwood Stations.Updated Info Re PCT for Limiting Small Break & Large Break LOCA Analysis Evaluations & Detailed Description of Errors ML20206B0821999-04-20020 April 1999 Requests to Reschedule Breaker Maint Insp for Either Wk of 990607 or One of Last Two Wks in Jul 1999,in Order to Better Accommodate Insp Activity ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205S9621999-04-20020 April 1999 Responds to 981203 RAI Telcon Re SG Tube Rupture Analysis for Byron Station,Unit 2 & Braidwood Station,Unit 2.Addl Info & Subsequent Resolution of Issues Discussed During 990211 Telcon Are Documented in Encl ML20206B0251999-04-14014 April 1999 Forwards Reg Guide 1.16 Rept for Number of Personnel & Person-Rem by Work Job Function for 1998. Associated Collective Deep Dose Equivalent Reported According to Work & Job Functions ML20205K3581999-04-0606 April 1999 Submits Request to Reschedule Breaker Maint Insp for Braidwood Nuclear Power Station for Either Wk of 990607 or One of Last Two Wks in Jul 1999 ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20210C7181999-03-30030 March 1999 Forwards Integrated Exam Outline Which Plant Submitting for Review,Comment & Approval for Initial License Exam Scheduled for Wk of 990607 ML20205E6401999-03-26026 March 1999 Forwards Proprietary Ltr Re Notification of Corrected Dose Rept for One Individual,Per 1997 Annual Dose Repts for All Comed Nuclear Power Facilities,Submitted 970430.Proprietary Info Withheld ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util ML20207J4321999-03-0808 March 1999 Forwards Braidwood Station ISI Outage Rept for A1R07, Per Requirements of ASME Section Xi,Article IWA-6200 ML20205C6861999-03-0404 March 1999 Provides Notification That Byron Station Implemented ITS on 990205 & Braidwood Station Implemented ITS on 990219 1999-09-08
[Table view] |
Text
_ ____
'N ' Ccmmonwulth Edison
~~~m y ') Braidwood Nuclear Route #1, Box 84 Power Station h v' Y~J Bracevilfe, Illinois 60407 N Telephone 815/458-2801 December 1, 1994 U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk
Subject:
Braidwood Nuclear Power Station Units 1 and 2 Supplemental Response to Notice of Violation Inspection Report Nos. 50-456/94021; 457/94021 NRC Docket Numbers 50-456 and 50-457
References:
- 1) K. Kaup letter to L F. Miller dated November 1, 1994, transmitting the Reply to a Notice of Violation, NRC Inspection Report 50-456/94021; 50-457/94021
- 2) L. F. Miller letter to K. Kaup dated October 6, 1994, transmitting NRC Inspection Report 50-456/94021; 50-457/94021 Reference 1 provided Commonwealth Edison Company's (Comed) reply to the Notice of Violation (NOV) which was transmitted with the letter and Inspection Report identified in reference 2. The NOV cited a Severity Level IV violation requiring a written response. Reference 1 addressed examples 2, 3, 4, and 6 of the 1
violation.
In accordance with the relephone conversation on October 31, 1994, between Sara Reece-Koenig, Corporate Regulatory I Services, and Nicholas Hilton, .(C Region III, Com3d was granted a 30 day extension for responding to examples 1 anc. 5 of the violation to allow a thorough root cause investigation of the issues. Comed's reply to examples 1 and 5 is provided in the attachment. l l
l i
I 8i 060007 !
g
- j;20so11s ,41,0, ADOCK 05000456 g#
PDR I {
-d If your staff has any questions or comments concerning this letter, please refer them to Kevin Bartes, Braidwood Regulatory Assurance Supervisor, at (815)458-2801, extension 2980.
Sincerely, ,
e
' r1 L. K up Site Vice President Braidwood Station KLK/JML/mr Attachment cc: J. B. Martin, NRC Regional Administrator - RIII R. R. Assa, Project Manager - NRR S. G. Du Pont, Senior Resident Inspector I
l o \cortesp\1994\svp053.wpf
ATTACHMENT REPLY TO A NOTICE OF VIOLATION INSPECTION REPORT 50-456/94021; 50-457/94021 VIOLATION (456(457)/94021-01)-
Technical Specification 6.8.1 required that written procedures shall be established, implemented, and maintained covering activities referenced in Appendix A, Regulatory Guide 1.33.
Revision 2, February 1978, which includes preparations for refueling, procedure adherence, and radiation protection. Seven examples contrary to the above follow:
- 1. BwFP FH-31, " Fuel Handling Cleanliness Zones and Requirements," required personnel accountability be accomplished in a cleanliness zone II area by loggi.ig each individual in and out of the control point using the ingress, egress and equipment accountability form (BwFP FH-31Tl).
Contrary to the above, on August 10, 1994, the licensee failed to log individuals in and out of a cleanliness zone II area control point using FH-31T1.
- 2. BwFP FH-31 required that a cleanliness zone II area be posted with a large, conspicuously placed sign having general instructions for entry.
Contrary to the above, on August 10, 1994, the licensee failed to post a cleanliness zone II area with an approprie'.e sign referencing the appropriate procedure with general instructions for entry. ,
- 3. BwFP FH-31 required that an entrance to a cleanliness zone II area include applicable procedure and logs in the area as required.
Contrary to the above, on August 10, 1994, the licensee failed to have the applicable procedure and logs in the area as required.
- 4. BwAP 100-20, " Procedure Use and Adherence," required that when an individual perceives that a procedure cannot be performed as written, that the individual inform supervision of the situation for evaluation.
The supervisor will then evaluate the situation and determine the appropriate course of action.
1
ATTACHMENT REPLY TO A NOTICE OF VIOLATION (CONTINUED)
INSPECTION REPORT 50-456/94021; .50-457/94021 Contrary to the above, on August 4, 1994, while securing the 2C condensate / condensate booster pump, '
nuclear station operators perceived that the governing procedure could not be performed as written, but nevertheless performed equipment manipulations outside the procedure without directly informing supervision and receiving guidance as' required. i
- 5. BwRP 5000-7, " Unescorted Access To and Conduct in-Radiological.y Posted Areas," required that personnel entering a radiologically posted area read and understand all radiological signs which appear at the access control point, and ensure that he or she has been issued a routine thermoluminescent detector (TLD) badge and at least one secondary dosimeter.
Contrary to the above, on August 30, 1994, two licensee employees who entered the radiologically protected area (RPA) failed to read and understand the radiological signs which appeared at the RPA control point, and failed to obtain secondary dosimetry as required.
- 6. BwAP 575-5, " Release of Material from a Radiologically Posted Area," required that " solid material shall not be given an unconditional release (from the Radiation Protection Area) until the material has been decontaminated and determined to be free of detectable radioactive material".
Contrary to the above, on August 18, 1994, the licensee discovered an eddy current cover plate with 10,000 dpm/100 cm smearable contamination 2
on one bolt hole opening and 18,000 dpm/100 cm 2 smearable contamination on another bolt hole opening released outside the Radiation Protection Area without being decontaminated and free of detectable radioactive material.
Also contrary to the above, on August 30, 1994, the licensee discovered a reactor cavity decontamination paint container and a chair with 2,000 dpm/100 cm 2 smearable contamination released outside the Radiation Protection Area without being decontaminated and free of detectable radioactive material.
This is a Severity Level IV violation.
2
I, l
l
- ATTACHMENT REPLY TO A NOTICE OF VIOLATION (CONTINUED)
INSPECTION REPORT 50-456/94021; 50-457/94021 REASON FOR 1HE VIOLATION (EXAMPLE 1)-
BwFP FH-31, " Fuel Handling Cleanliness Zones and Requirements,"
was written by the Fuel Handling Department to clarify the cleanliness requirements for the reactor cavity, spent fuel pool, and new fuel storage area which are listed in BwAP 1100-18,
" Station Housekeeping / Material Condition Program." The procedure included the ingress, egress and equipment accountability form BwFP FH-31T1.
BwFP FH-31 was approved on January 1, 1994. However, once the i procedure was approved, the Fuel Handling Department failed to comply with the requirements for logging in and out of the control point due to inattention to detail and a failure of Fuel Handling management to review and reinforce expectations with the ;
workers. !
l CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED (EXAMPLE 1)*
A copy of BwFP FH-31 and the personnel accountability log, 1 BwFP FH-31T3. were immediately placed at the control point for !
the cleanliness zone II area in the new fuel storage area. l.
Fuel Handling management directed department personnel to meet :
the requirements of BwFP FH-31 by logging in and out of the l control point utilizing the accountability log. j CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID FURTHER VIOLATION (EXAMPLE 1)- l The importance of material and personnel accountability has been stressed at camp meetings with Fuel Handling management and bargaining unit personnel.
A surveillance activity has been established for the Fuel '
Handling Department to review procedure BwFP FH-31 prior to each refuel outage. l i
l ATTACHMENT REPLY TO A NOTICE OF VIOLATION (CONTINUED)
INSPECTION REPORT 50-456/94021; 50-457/94021 CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID FURTH4 VIOLATION
( EXA14PLE 1 CONTINUED)-
The wording on the posting for cleanliness zone II areas will be enhanced to alert all site personnel entering the areas to meet the requirements of BwFP FH-31 by logging in and out of the control point utilizing the accountability log. This action will be complete prior to the next refueling outage which is scheduled to begin for Unit 1 on September 30, 1995.
Additionally, the Station will perform an evaluation of BwFP FH-31, BwAP 1100-18, and BwAP 100-21, " Foreign Material Exclusion," for potential enhancements to ensure consistency in the use and requirements of the procedures. The review will be performed and the procedures will be revised if appropriate prior to the next refueling outage which is scheduled to begin for Unit 1 on September 30, 1995.
DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED (EXAMPLE 1):
Full compliance was achieved on August 13, 1994.
4
.- ATTACHMENT REPLY TO A NOTICE OF VIOLATION (CONTINUED)
INSPECTION REPORT 50-456/94021; 50-457/94021 REASON FOR THE VIOLATION (EXAMPLE 5)-
The electrical maintenance individuals did not self check prior to entering the RPA and as a result, failed to adhere to BwRP 5000-7, " Unescorted Access To and Conduct in Radiologically Posted Areas."
CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED (EXAMPLE 5)-
The individuals proceeded.to the auxiliary building control point ',
where they discussed their lack of dosimetry in the RPA with a Radiation Protection (RP) technician. The individuals then j exited the RPA after frisking. The RP technician documented the violation on a Problem Identification Form.
CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID FURTHER VIOLATION (EXAMPLE 5)-
The individuals involved in the violation were counselled by the Electrical Maintenance Department Supervisor regarding the importance of adhering to procedures and self checking.
Letters.of reprimand were placed in the individuals' personnel files.
The Electrical Maintenance Supervisor reinforced the expectations regarding radiation worker practices with the department. ,
A General Information Notification (GIN) was issued to site personnel on November 28, 1994. The GIN discussed radiological work practices and reinforced the requirements for adhering to radiological postings and procedures.
DATE vm&J FULL COMPLI ANCE WILL BE ACHIEVED (EXAMPLE 5)-
Full compliance was achieved on August 30, 1994.
5 ,
__