Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000306/LER-2001-003 +
- IR 05000298/2012003 +
- RIS 2000-25, Potential Deficiency in Qualification of Okonite Single-Conductor Electrical Control Cables +
- ML17305A675 +
- ML12129A384 +
- ML17258A135 +
- ML17258A134 +
- ML101260445 +
- RC-06-0196, Special Report (Spr) 2006-005 +
- ML19329B621 +
- ML20063D264 +
- ML20059K149 +
- ML20058M845 +
- L-02-037, March 2002 Monthly Operating Report for Beaver Valley, Units 1 & 2 +
- RC-02-0017, Part 2 of 2, Virgil C. Summer Nuclear Station (Vcsns), Request for Revisions to Previously Accepted Diviations to Criteria within Section Iii. G. 2.c to Appendix R of 10CFR50 (Revision 1) +
- ML20076H128 +
- ML20102A593 +
- ML20106C654 +
- ML20115A869 +
- ML20112E297 +
- ML20137V630 +
- ML20141N691 +
- ML20150E462 +
- IR 05000336/1988013 +
- IR 05000483/1986018 +
- ML20204E405 +
- ML20065T347 +
- ML20207Q420 +
- ML20214K014 +
- ML20214E673 +
- ML20237B471 +
- ML20236W388 +
- B13159, Application for Amend to License DPR-65,revising Tech Spec 3.9.3.2 Re Spent Fuel Pool Cooling to Add Footnote to Limiting Condition for Operation for Cycle 9 Refueling Only. W/O Proposed Tech Specs +
- ML20211A495 +
- B12267, Application for Amend to License DPR-65,changing Tech Specs to Establish Requirement for Two Operable Trains of Spent Fuel Pool Cooling Until Most Recently Discharged 1/3 Core Decayed for 504 H.Fee Paid +
- ML20210C609 +
- B17772, Application for Amend to License DPR-65,relocating Selected TS Re Refueling Operations & Associated Bases to Plant TRM +
- B11893, Forwards Review of Spent Fuel Storage Capacity Expansion Request,Containing Proposed Mod to Tech Spec Re Decay Time Requirement,In Response to NRC 850826 Request for Addl Info +
- B16329, Forwards non-proprietary & Proprietary Versions of Nuclear Training Loit/Lout Audit Reviews. Commitments Made within Ltr,Listed.Proprietary Version Withheld +
- ST-HL-AE-3235, Monthly Operating Repts for Aug 1989 for South Texas Project Electric Generating Station Units 1 & 2 +
- IR 05000333/1986099 +
- ML22179A336 +
- ML23024A143 +
- LIC-94-0169, Notifies NRC of Rev to Post Accident Sampling Sys Licensing Basis Commitment Re Measurement of Reactor Coolant Ph. Informs of Util Intent to Delete from PASS Program Requirement to Measure Ph of Reactor Coolant +
- B13577, Proposed Tech Specs Re Refueling Operations +
- BECO-LTR-91-151, Monthly Operating Rept for Nov 1991 for Pilgrim Nuclear Power Station +
- 05000412/LER-1987-022, :on 870921,emergency Diesel Generator 1 Automatically Started Due to Loss of Power to 2AE 4 Kv Emergency Bus.Caused by Faulty Connection Between tap-tap Block Combined W/Incorrect Ground Location +
- ML20214V935 +
- ML20207J871 +
- 05000483/LER-1986-025, :on 841203,851102 & 1203,plant Operated Above 100% Power Level.Caused by Incorrect Calorimetric & Feedwater Flow Instrument Drift.Power Maintained at Required Level & Design Change Evaluated +