Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 40210 +
- ENS 48685 +
- ML17213B091 +
- ML16015A371 +
- ML15314A515 +
- ML13098A091 +
- ML12156A005 +
- ML17329A329 +
- ML18158A130 +
- ML100920063 +
- ML081560229 +
- ML18036B021 +
- 05000272/LER-1991-001-02, :on 910111,containment purge/pressure-vacuum Relief Sys Isolation Signal Actuated.Caused by Equipment Failure.Channel Detector Connectors Checked & Returned to Svc +
- ML19343B972 +
- ML19347B101 +
- ENS 42318 +
- ENS 44223 +
- ML20039G181 +
- ML20039G065 +
- ML051040083 +
- ML20062M494 +
- ML20086K586 +
- ML20087G037 +
- ML20084R723 +
- ML20082S895 +
- ML20080B744 +
- ML20093F444 +
- ML20092F425 +
- ML20091K481 +
- ML20092N859 +
- ML20071F982 +
- IR 05000320/1986001 +
- ST-HL-AE-2588, Responds to NRC Re Violations Noted in Insp Rept 50-498/87-75.Corrective Actions:Toxic Gas Monitors Reprogrammed Such That Operators Will Not Be Required to Manipulate Sys to Perform Channel Checks +
- ML20199F961 +
- ML20205P565 +
- ML20065R119 +
- ML20213G900 +
- ML20248L586 +
- ML20247D145 +
- ML20246M695 +
- ML20235N430 +
- BECO-89-067, Monthly Operating Rept for Apr 1989 for Pilgrim Nuclear Power Station +
- 2CAN078808, Monthly Operating Rept for June 1988 for Arkansas Nuclear One Unit 2 +
- L-93-112, Forwards Safeguards Event Log Entries for Jan-Mar 1993.Encl Withheld (Ref 10CFR73.21) +
- U-601883, Requests Withdrawal of 910906 Request for Regional Waiver of Compliance to Provide Addl Time to Effect Repairs in Response to Microbiologically Induced Corrosion in Jacket Water Heat Exchanger for 12-cylinder Engine of Standby EDG +
- U-601879, Requests Waiver of Compliance from Tech Spec Limiting Condition for Operation Re Standby Emergency Diesel Generator 1B,to Permit Addl Time to Effect Repairs Re Discovery of microbiologically-induced Corrosion in Jacket +
- BECO-91-028, Responds to NRC Re Violations Noted in Insp Rept 50-293/90-25 on 901127-1231.Corrective Actions:Work Terminated in Condenser Bay,Vendor Technician Escorted to RP to Begin Exposure Evaluation & Notify Mgt Personnel +
- 05000346/LER-2022-002, Strong Winds Result in Ultimate Heat Sink Low Water Level +
- 05000423/LER-2022-001, Emergency Core Cooling and Reactor Plant Component Cooling Water Systems Inoperable for Time Greater than Allowed by Technical Specifications +
- 05000293/LER-1989-014, :on 890412,inadvertent Overpressurization of RCIC Suction Piping Occurred During Surveillance Testing. Caused by Personnel Error.Personnel Trained Re Procedural Changes +