Title | Technical Specification (Ts) Required Shutdown - Safety Relief Valve Declared Inoperable |
Event Description | On Sunday, January 20, 2013, at 2050 hours0.0237 days <br />0.569 hours <br />0.00339 weeks <br />7.80025e-4 months <br />, with the reactor at 100% core thermal power, the station entered a 24-hour action statement to initiate a controlled shutdown and be less than 104 psig reactor pressure due to suspected leakage across the first stage pilot of safety relief valve (SRV) RV-203-3B and subsequent declaration of the SRV inoperable due to criteria specified in Pilgrim plant procedure 2.2.23.
As background, the pressure relief system includes four (4) SRVs and two (2) spring safety valves (SSVs). The SRVs discharge through their individual discharge piping, terminating below the minimum suppression pool (torus) water level. The four SRVs are installed on the main steam piping in containment between the reactor pressure vessel and the flow restrictors. While at full power, indication of a steam leak across the first stage pilot of RV-203-3B was determined in accordance with criteria specified in procedure 2.2.23. Specifically, the SRV is inoperable if the pilot stage thermocouple temperature is 35 degrees F below its baseline temperature (with a lower decrease at the 2nd stage thermocouple) and cannot be explained by a corresponding downpower. The safety relief valve was subsequently declared inoperable and the Limiting Condition for Operation (LCO) for Technical Specification (TS) 3.6.D was entered. Due to the valve being declared inoperable the station is required to be shutdown and reactor coolant pressure below 104 psig within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per TS 3.6.D.2. Currently a reactor shutdown is in progress to initiate safety relief valve repairs. This event has no impact on the health and/or safety of the public. The USNRC Senior Resident Inspector has been notified. |
Where | |
---|---|
Pilgrim Massachusetts (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-2.33 h-0.0971 days <br />-0.0139 weeks <br />-0.00319 months <br />) | |
Opened: | Paul Gallant 23:30 Jan 20, 2013 |
NRC Officer: | Charles Teal |
Last Updated: | Jan 20, 2013 |
48685 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48685\u003C/a\u003E - \u003Ca href=\"/Pilgrim\" title=\"Pilgrim\"\u003EPilgrim\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETechnical Specification (Ts) Required Shutdown - Safety Relief Valve Declared Inoperable\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48685 - Pilgrim\n","link":"","lat":41.942861111111114,"lon":-70.57673055555556,"icon":""}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Pilgrim with 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
WEEKMONTHYEARENS 486852013-01-21T01:50:00021 January 2013 01:50:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification (Ts) Required Shutdown - Safety Relief Valve Declared Inoperable ENS 475532011-12-26T17:50:00026 December 2011 17:50:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown - Safety Relief Valve Declared Inoperable ENS 474542011-11-17T20:15:00017 November 2011 20:15:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Inoperable Feedwater Check Valve ENS 468522011-05-14T06:45:00014 May 2011 06:45:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Inability to Maintain Specified Differential Pressure Between Drywell and Suppression Chamber ENS 466282011-02-20T05:00:00020 February 2011 05:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown-Reactor Building Closed Cooling Water Train Inoperable 2013-01-21T01:50:00 | |