Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 41773 +
- ENS 42959 +
- 05000296/LER-1998-007, :on 981116,unplanned ESF Following Loss of 4kV Unit Board 3B Occurred.Caused by Temporary Energization of Lockout Relay on 4kV Unit Board 3B When Resistor on Relay Monitoring Lamp Circuit Shorted.Replaced Resistor +
- ML062650135 +
- ML19196A245 +
- ML19196A223 +
- ML19196A221 +
- ML040550387 +
- BYRON 2002-0115, LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an Individual +
- ML20081C147 +
- ML20095J282 +
- ML20135H293 +
- ML20151F886 +
- ML20149H901 +
- IA-86-262, Final Response to FOIA Request.App D Documents Re Failure of Fire Protection Deluge Valves Placed in PDR +
- 05000272/LER-1982-070, Forwards LER 82-070/03L-0.Detailed Event Analysis Encl +
- ML20212G726 +
- ML20236W388 +
- ML20199J311 +
- 2CAN088807, Monthly Operating Rept for Jul 1988 for Arkansas Nuclear One Unit 3 +
- IR 05000454/1999016 +
- AECM-83-0724, Forwards Partial Response to Request for Addl Info Re Transamerica Delaval,Inc Diesel Generators Supplied to Facility.Steps Taken to Obtain More Detailed Info on Crankshaft Design Analyses & Testing Done by Lilco +
- B14966, Responds to NRC Re Violations Noted in Insp Repts 50-336/94-01 & 50-336/94-18 on 940105-0222.Corrective Actions:Util EP Personnel Conducted Assessment Activities Related to EAL Classification Issues & Hpes Analysis Done +
- 05000277/LER-1998-004-01, :on 980606,failure to Meet TS for off-site Source,Was Determined.Caused by Lightning Strike & No Positive Verification That Tap Changer Was operational.3SU Tap Changer Circuitry Was Repaired,Tested & Returned to Svc +
- 05000331/LER-1986-026, :on 861212,standby Filter Unit Train B Autostarted on Control Bldg Radiation Monitor Downscale Trip.Caused by Personnel Error.Electricians Reminded of Need to Perform Work Carefully +
- 05000339/LER-1986-002-02, :on 860220,during Mode 3,reactor Tripped on source-range Neutron Detectors N-35 & N-36 High Flux.Cause Unstated.Detectors Returned to Svc.Investigation Continuing +
- 05000395/LER-1992-008, :on 921114,ESF Actuation Occurred Following Partial Loss of Offsite Power Due to Fallen Tree.Offsite Power Restored to ESF Train B,Edg B Secured & Operability Test Peformed on EDG A,Per TS SR 4.8.1.1.2.a.3 +
- 05000440/LER-1995-008, :on 950911,reactor Scram Occurred Due to Trip of Main Turbine & Subsequent Closure of Turbine Control & Stop Valves.Replaced Inverter & Restored Instrument Power Supply +
- ML20039G264 +
- 05000280/LER-1988-005-01, :on 880219,heat Tracing Proper Control Setpoints Could Not Be Verified.Caused by Inadequate Surveillance & Maint Procedures.Verification of Correct Setpoints Initiated +
- 05000260/LER-1992-004, :on 920427,reactor Scrammed on Low Reacter Water Level Resulting in Actuation of Control Room Emergency Ventilation & Standby Gas Treatment Sys.Caused by Controller Output Failure.Maint Planning Guide Revised +
- 05000260/LER-1992-004-02, :on 920427,reactor Scrammed on Low Reactor Water Level.Caused by Failure of Feedwater Control Sys Resulting in Feedwater Pump run-back & Low Flow to Reactor Vessel.Maint Planning Guide Revised +
- 05000296/LER-1988-005-04, :on 881108,loss of Power to 4160 Volt Shutdown Board Due to Inadequate Breaker Alignment Causes ESF Actuations.Breaker Reinstalled & Properly Racked Into Normal Position +
- 05000315/LER-1995-010, :on 951020,inadequate Communication Resulted in Unexpected ESF Actuation.Completed Repairs to 1NRI-36 & Declared Detector Operable +
- B19027, November 2003 Monthly Operating Report for Millstone Units 2 and 3 +
- ML15224A269 +