Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 44428 +
- IR 05000259/2013002 +
- ML11123A191 +
- ML092230129 +
- RA-16-001, Special Report for Inoperability of the Turbine Building High Range Radioactive Noble Gas Monitor +
- ML20086E791 +
- ML20086P480 +
- ML20101P212 +
- ML20100P896 +
- ML20099B495 +
- ML20098B078 +
- ML20090B984 +
- ML20115C979 +
- ML20093G783 +
- ML20072S560 +
- ML20138J810 +
- ML20133H027 +
- ML20205P493 +
- ML20214E673 +
- ML20245L583 +
- IR 05000440/2012005 +
- ML20210Q500 +
- BVY-96-001, Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station +
- LIC-95-0172, Monthly Operating Rept for Aug 1995 for Fort Calhoun Station +
- 05000412/LER-1989-022, :on 890713,8 Gpm Inleakage Into Primary Drains Transfer Tank Observed Due to Increased Tank Pumpout.Caused by Seat Leakage on Isolation Valve 2DGS-300.Valve Closed Tightly,Eliminating Leakage +
- 05000320/LER-1989-001-01, :on 890120,midi air-lift Vacuum Sys Removed from Reactor Vessel W/O Supervision of Fuel Handling Senior Reactor Operator.Caused by Lack of Communication.Event Will Be Discussed W/All Applicable Personnel +
- 05000301/LER-1986-002-01, :on 860430,control Operator Noticed That Analog RPI for Shutdown Bank B Misaligned.Shutdown Bank B Withdrawn.Cause Could Not Be Confirmed But Failure of Mechanical Demand Counter Suspected +
- 05000458/LER-1988-017, :on 880819,operations Personnel Discovered That Required Hourly Fire Watch Insp Interval for Containment Bldg Exceeded.Fire Watch Insp Group Will Be Under Direction of Electrical Maint Shift Foreman +
- 05000237/LER-1985-041-04, :on 851112,unit Scrammed on Greater than 10% Turbine Stop Valve Closure Trip Signal.Caused by Turbine Trip Resulting from Simulated Reactor Vessel High Water Level.Valve Manifold for ECCS Switch Replaced +
- 05000270/LER-1985-004-04, :on 850422,reactor Trip Occurred on Loss of Main Feedwater.Caused by Short Circuit in Terminal Block on Transformer 2T,resulting in Loss of Motor Control Ctr.Block Repaired +
- 05000338/LER-1991-018, :on 910814,determined That EDG Time Response Testing Performed on 74% Undervoltage Instead of 72% as Required by Tech Specs.Caused by Personnel Error.Time Response Test Procedures Revised +
- 05000339/LER-1991-006-03, :on 910905,determined That One of Three Timer Actuation Relays Used in Emergency Bus 2J Degraded Voltage Circuit Failed During Testing.Caused by Continuous Energization.Electrical Jumpers Installed +
- 05000293/LER-1991-017, :on 910720-21,three Automatic Actuations of Portions of Primary Containment Control Sys Occurred.Caused by Air in Sensing Lines.Procedures Revised & Training of Personnel Conducted +
- 05000339/LER-1991-005-03, :on 910814,determined That Degraded Voltage Relay Time Delay Setpoint Outside Tech Spec Limit.Caused by Personnel Error.Relay Reset & Successfully Tested +
- 05000339/LER-1991-006, :on 910905,determined That Inoperable Degraded Voltage Relay Not Placed in Trip within Required One H Limit.Development of Periodic Replacement Program Being Revised & TS Change Will Be Evaluated +
- 05000266/LER-1981-012-01, /01T-0:on 810828,control Room Critical Control Power Failure Alarm Annunciated.Caused by Breakers Accidentally Opened by Contractor Personnel Installing Fire Barriers in Control Room.Breakers Closed & Alarm Cleared +
- 05000266/LER-1994-009, :on 940909,EDG G-02 Inadvertently Started & Station Battery Charger D-08 Tripped Off Due to Blown Fuse. Caused by Inadequate Procedure.Blown Fuse Replaced & Electrical Distribution Sys Restored to Normal +
- IR 05000269/1980028 +
- 05000272/LER-1981-027, Forwards LER 81-027/03L-0.Detailed Event Analysis Encl +
- 05000272/LER-1981-027-03, /03L-0:on 810311,senior Shift Supervisor Initiated Emergency Procedure Due to High Rb-88 Concentrations in Air Sampling.Caused by Ruptured Lower Diaphragm in Waste Gas Sys.Diaphragm Replaced +
- 05000316/LER-1986-026, :on 860912,determined That Valve Alignment Used Placed Unit in Unanalyzed Condition Per LOCA Analysis in Fsar.Caused by Misunderstanding of Tech Spec 3.5.2 Re ECCS Operability.Administrative Controls Created +
- 05000397/LER-1993-021, :on 930514,discovered Potential for Water Accumulation in CAC Sys.Due to Inadequate Original Analysis of Sys Design.Drains Installed in Lowest Elevations of CAC Sys Piping +
- 05000338/LER-2003-002, From North Anna Power Station, Unit 1 Regarding Entered Mode 4 with an Inoperable Containment Air Lock Due to Human Error +
- 05000270/LER-1985-004, :on 850422,reactor Trip Occurred on Loss of Main Feedwater.Caused by Loss of Motor Control Ctrs 2XC & 2XB Due to Two Grounded Terminal Boards.Grounded Terminal Boards Replaced +