Monthly Operating Rept for Feb 1985
ML20115C979
Person / Time
Site: Beaver Valley
Issue date: 02/28/1985
From: Carey J, Smith P
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8504180646
Download: ML20115C979 (10)


Text

- - - -

1 yj, 'n-

- NARRATIVE SUFDfARY OF MONTHLY OPERATING EXPERIENCE February 1985 February.1 The Station was in Operational Mode I with Reactor Power at a nominal 100 percent. Reactor Coolant System was at normal operating pressure and temperature.

February 2' At.0542 hours0.00627 days <br />0.151 hours <br />8.96164e-4 weeks <br />2.06231e-4 months <br /> on the 2nd a power level. reduction, to through approximately 28 percent, began due to a condenser tube February 3 le ak. .The leaking condenser tube was plugged at 0250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> on the 3rd and a power level increase toward a nominal 100 percent began at 0745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br /> on the 3rd.

February 4- The Station was in Operational Mode I with Reactor Power through at a nominal 100 percent. Reactor Coolant System was at

~ February.7 normal operating pressure and temperature.

February 8 At 1114 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.23877e-4 months <br /> on the 8th, power level was reduced due to through a rapid drop in Reactor Coolant System temperature. The sFebruary 10 problem was attributed to boric acid ent ering - the demineralizer header through.a leaking isolation valve pH-49}. ( At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on the 8th the valve, [CH-49), was isolated and power escalation began, reaching a ' nominal 100 percent at .1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />.

Power level was reduced to approximately 28 percent at 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br /> on the 8th to perform maintenance on 'B' Feedwater Regulator Valve-[FCV-FW-488].

At 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br /> on the 10th the ' B' Feedwater Regulating Valve was. returned to se rvice. and . power . level was increased to a nominal 100 percent at 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br /> on the 10th.

February 11 The Station was in Operational Mode 1- with Reactor Power at a nominal 100 percent. Reactor Coolant System was

~

through February 14 at normal operating pressure and temperature.

February 15 Began a' power reduction at 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br /> due to a suspected problem with :a feedwater pump [ FW-P-1B] seal. At 1354-hours the scals integrity was restored, by reestablishing suction pressure in the feed pump, and power level was increased to a nominal 100 percent.

R.

fl

%, 7 , #, -  :

m ,

~

}; e -

9' f,; p e:

t :ii +

February ' 1985.

~

- Summary of Monthly Operating Experience n

' February 16' The Station was in Operational Mode 1 with Reactor Power

-through . at .a nominal 100 percent. Reactor Coolant System was

February 19
at normal' operating pressure and temperature.

February .20 - eat. _ 0503 hours ' commenced reactor shutdown due -to condenser tube leaks. The Station was taken off line at

?

- 0551 hours0.00638 days <br />0.153 hours <br />9.11045e-4 weeks <br />2.096555e-4 months <br />,. the turbine was tripped at 0553 hours0.0064 days <br />0.154 hours <br />9.143518e-4 weeks <br />2.104165e-4 months <br /> and the Station entered Mode 3 at 0607 hours0.00703 days <br />0.169 hours <br />0.001 weeks <br />2.309635e-4 months <br />. .

. February 21 . At 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br />' the reactor was taken critical'. At 1112 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.23116e-4 months <br /> the Main Unit Generator.was synched to the ' grid.

2

~

At 1119 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.257795e-4 months <br /> a reactor trip / turbine trip occurred when-a main feed regulator valve spiked open. At 1423 hours0.0165 days <br />0.395 hours <br />0.00235 weeks <br />5.414515e-4 months <br /> the reactor was taken critical. At 1519 hours0.0176 days <br />0.422 hours <br />0.00251 weeks <br />5.779795e-4 months <br /> the Main 1 - Unit Generator'was' synched to the' grid. The Unit- then l operated at , a reduced power level due to 'C' Condenser waterbox being isolated and repairs on leaking condenser -

tubes continuing.

. February 22 The Station was operating at a' reduced power level of' _;

Lthrough - . approximately 85 percent until 'C' waterbox was returned  !

' February 24 to service at 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> on the 24th. Power escalation

- then began reaching a nominal 100 percent at 1814' hours '

, - on'the ?.4th.

L February . 25 The _ Station'was in Operational Mode :1 with Reactor Power

through; . .

at a nominal 100 percent. Reactor. Coolant System was at 1 February-26 normal operating pressure and temperature. -

' February 27- At 1415 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.384075e-4 months <br /> on the 27th commenced a power reduction to through -approximately 80 percent -due to a leaking condenser tube.

~ February;28 2

. 46'v v e f e<e 'tmt---rt*=-hv -**t-*'T-- -wr'7~eav v g- +rw--r-,g-+--g* -

  • v+w,r ,py-,-vryv,-, -g,pr-ye-*-"-'*rw"-M*-r**et"w www'--++m-7**' '*w' t+*

-,,,, . ,. . . . . , . . .. - -. v. - -,.n. .- . . - . - . . - . . _ ~ . . .- . - . . . . . . . . - . . - - .

.c w: 4 . . .

r-F' , i.t ,

Fabruary.1985.

Summary of M:nthly- Operating Experienca'-

+.

9 p: -

t i p . . .

,4 MAJOR MAINTENANCE - FEBRUARY:1985 No major maintenance was. performed. during February. . .

t

~!-

4. .

. 4

f. ..A

+ ,

t i

e

~

+

p i

a 3

L r i . b *- {

-r J

h 1 .

+.

I t ~

r i 4 r

. , C i , ,

^

h i-k4

. 3 f
1. - .

h >.

. .+

4 i-iv . , . -,...-. . ) J . .. r. . . . 2 ..,.....,,.......,.._.,,m., _ _ . _ , , _ _ , , . . _ _ . _ , . . . . _ _ _ _ _ _ _ , , . _ . , _ _ _ ..,_._,,_.___,_.;

~ '

OP2RATISG DATA REPORT DOCKET NO. 50-334 DATE 3/7/85 [

COMPLETED BY P. A. Smith, 825

, TELEPl!ONE. 41 ?-44'a- 1

- OPERATING STATUS

1. Unit Name: Beaver Valley Power Sta tion. Unit #1 Notes
2. Reporting Period: ## d' /908
3. Licensed Thermal Power (MWt): WO '

4.' Nameplate Rating (Gross MWe): 923

- S. Design Electical Racing (Net MWe): 835

6. Maximum Dependable Capacity (Gross MWe): .. 860

. 7. Maximum Dependable Capacity (Net MWe): .

810

' 8. If Change'. Occurin Capacity Ratings (Items Number 3 Through 7) Since Last Report.,Give Reasons:

O 9. Power Lev'el To ich Restricted. If Any (Net MWe): None -

10. Reasons For Restri:tions.If Any; N/A -

. This Month .. . Yr to-Date " Cumulative II. Hours In Reporting Period 677 1416 ~~ 77,424 .

' 12. Number Of Hours Reactor Was Critical ' 647.o 1327.0 38,682.7

13. Reactor Reserve Shutdown Hours 0 *O 4,482.8 *
14. Hours Generator On.Line 638.7 ,

1255.6 37,338.5 IS. Unit Reserve Shutdown Hours 0 0 0

16. Gross Thermal Energy Generated (MWH) 1.495.791.6 2.726.457.6 86.124.971.6
17. Gross Electrical Energy Generated (MWH) 484.000 R80.000 27.374.400
18. Net Electrical Energy Generated (MWH) 452.100 815.146 ,25.439.983
19. Unit Service Factor 95.O RR.7 50.5
20. Unit Availability Factor _ 9s.0 88.7 50,5

- 21. Unit Capacity Factor (Using MDC Net) 83.1 71.1 44.0

22. Unit Capacity Factor (Using DER Net) 80.6 68.9 42.7 l 23. Unit Forced Outage Rate 5.0 5.3 26.5
24. Shutdowns Scheiluled Over Next 6 Months iType. Date.and Duration of Eacht:

N/A 2S. If Shut Down At End Of Report Period.Estimat-d Date of Startup:

26. Units in Test Status (Prior to Commercial Operation): - Forecast Achieved INITIAL CRITICALITY N/A N/A

' ~

INTIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A (9/77)

L_. -

9 .

- Ak 'ERAGE DAILi UNIT FOWER LEVEL DOCKET NO. 50-334 UNIT 3Y?S Unit #1 DATE 3/7/85 COMPLETED BY P. A. Smith TELEPHONE (412) 643-1825 MOhW FEBRUARY i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY FOWER LEVEL -

, (MWe-Net) ~ ( g w ,.g er 1' 784 g7 783 3 331 784

..- IS 3 39 ' 825 783 131 4 20 826 89 5 3 6

, 705

~

825 -

663 7 23 742 -

704 g 24 123 -783

9. ,

10 -

26 825 -

825 703 1I 27 784 -705

- l g2 23 13 824 -

826 ~~~~

l

. 14 30 g, 783 y 16 822 ----

l INSTRUCTIONS On this formst.!ist the aver:ge d:aly unit power lese! in MWe Net for e:ch day in the reputting month. Compute 1o the ne: rest whole mepws:t.

(9/77)  !

. 1

- l

. UNIT SifuTDOWNS AND POWER REGUCTidNS DOCKET NO. 50-334 .

UNIT NAnf E BVPS Unit #1

, DATE 3/7/85 REPORT MONTit February 1985 COMPLETED BY P.-A.'Emith TELEPflONE (412) 643-1825_

i m

be an w so o u 0 " 'd e 05o Licensee. ,, E* Cause, & Corrective

4. No. Date . 8 'E U 2 Event !o S$

--  %. 8 g ,g; p g; & 'O Action to E

a 50 e u .c Report p = o Q. O ao Prevent Recurrence H u ywg gu 8 8

7 850202 F 0 A 5 N/A IIC llTEXCII 1 A nower reduction occurred at 0542 hrs. on the 2nd due to a condenser tube leak. The leaking tube was plugged and the condenser was returned to service at 0745 hrs. on the 3rd and power was n,ubsequently increased.

8 -850208 F 0 A 5 N/A PC VATNEX A power reduction occurred at 1114

, hrs. on the 8th due to horic acid entering the demineralizer header

  • 1 through a leaking isolation valve

[Cil-49] .

1 The~ valve [Cil-49] was isolated at 1300 hrs and pownr was subs'equently l increased.

1 2 T: F.used 3 4 Reason: Hethod:

S: Schedu!cil I:mlubis G . Insions tions

, A Equipment Failure (Explain) 1-Manual lin Picpasali.m of Data H. Maintenance ci Test 2-Manual Scram i I:nli) Sheels for 1.icemcc C RefuelinE 3-Automatic Scram Freni Reptui 11 l'RI I de (NilRI G D Regulatos) Restsictism 4-Continued From Previous Month Ulet) i Upciaine Tsainmg A 1.icense I:xamination l Administrative 5.n. suction 9 0ther 5 G OperJIiemal I seen (l'aplaint .

ITlubit 1 Same Smese P8/77) i11 Olhes (lisplain t i.

UNITSilHTDOWNS AND F0WER REDUCTIONS DOCKET NO. . 50-334 .

UNIT NAME BVPS Unit Il DATE 3/7/85 REPORT MON'Ill February 1985 COMPLETED ay P. A.- Smith _

TELErilONE (412) 643-1825 -

ea tw 60 0 M

    • 0 ,C,

.S

  • c t Licensee 4 @* Cause, & Corrective No. Date d e -% 5 0 3 Ia' E Event !e 5E Action to j; j5 j gj} aeport #

{g 8 Prevent Recurrence S

9 850208 F 0 B 5 N/A C11 VALVEX At 2100 hrs. on the 8th power level was reduced for maintenance of 'B' Feedwater Regulating Valve. The valve was repaired'at 0845 hrs. on ,

the 10th and power level was stibsc-quently increased.

10 850215 F 0 A 5 N/A lill VALVEX A power reduction occurred at 1350 hrs on the 15th then a condensate Pump Recirculation Valve failed open.

The valve was isolated at 1354 hrs.

on the 15th and power was subsequently increased.

i 1 2 F: F.uted 3 4 Reasem:

S: Sthedu!ed Hechod: l'xhibit G - Insteuttiims A Equipment FailutetExplain) 1-Manual l'on Pseparati.ni el Data B Maintenance of Test - 2-Hanual Scram I.ntry Sheets for 1.icemcc C Refuelint 3-Automatic Scram INent Repois 81 l'Hil ite (NilRI G D. Regulatory Restriction .

4-Continued From Previous Month 0161) 1 Opciator Tealning A 1.icense l'xaminallim 5-Reduction I Administrative 9-Other 5 G Operatismal I e nos ll'aplain t .

l'F/77) IThshit 1 Sanir Soinse II Olliesilh plaint l'

DOCKET NO. 50-334~ .

UNITSHilTDOWNS AND POWER HEDUCTIONS UNIT NAbf E BVPS Unit Il DATE 3/7/85 REPORT MONill February 1985 COMPLETED RY P. A. Smith TELEPHONE (412) 643-1825' gn iH 60 0

% u 0 " 0 "a .5 " Licensee 4 E* Cause .'&. Corrective No. Date %A. %5 l 33 E

C3 3"E

.c :3 gg Event !e u9 5$

' O. O Action to -

g gv g Report # gg g.o Prevent Recurrence ug{

2: m o o

11 850220 F 29.4 A 1 N/A HC llTEXCll ' At 0551 hrs. on the 20th commenced plant shutdown due to condenser tube leaks.

'C' Condenser Waterbox was isolated and the Station was Lack on-line, at a reduced power level, at.1112 hrs, on the 21st.

12 850221 F 4.0 A 3 85-06 Cll VALVEX At 1119 hrs on the 21st a reactor trip / turbine trip occurred when a Main Feedwater Regulating Valve spiked open. The valve was manually closed and the Station returned to service at 1519 hrs. on the 21st.

I 2 F: F.nted 3 4 Reason: Hechod: Inhibit C. Instristthins -

S S(hedu!cd A Equipment FailueetExplain) 1-Manual l'os Pseparati.m ol Data B-Maintenance ei Test :2-Manual Scram 1:nt ) Sheets for Ikensee C RefuelinE 3-Automatic Scram E*ent Repoit tI l'It I de INi RI'G D Regtdator) nesiikiron 4_continoea ero. ece,toua nonth oioni I Opesalos leaintog A ikense luminwiiusi $-Heduction l' Administsalive 9-Other 5

' G Operatiimal I seus ll'mplain) 1%hibit 1 Sanw.S.imu-l'P/77) II Othes flisplaint t-

~ ~ . - ..

_ _. E-: . _

DOCKET NO. 50-334 UNIT SHUTDOWNS AND POWER REDUCTIONS -

UNIT NAME BVPS U"It #1 ,

' DAIE- 3/7/85 REPORT MONiil February 1985 COMPLETEP BY P. A. Smith ~

TELEPlf0NE (412) 643-1825 m

k ca sw 00 0 M 0 "

c 0 ." t Licensee 4 5* Cause & Corrective No. be t e' ".D.

N5 k ;c 0

to i UE

,C :3 Of.

Event 0o WO 5$

O. o etien to g gw g gg Report # g 'g gu Prevent Recurrence ,

x 5 O

m u O

.?

i j 13 850221 F 0 A 5 N/A HC HTEXCH Power was held at a reduced level as testing for leaking condenser tubes continued. No additional leaks

' were found and the condenser was returned to full service at 1250 hrs.

on the 24th.

1

14 850227 F 0 A 5 N/A IIC HTEXCH At 1415 hrs. on the 27th a power reduction occurred due to a con-denser tube leak. Testing to locate
the leak continued through the end
of the month.

i l

l.

1 2 3 4 l: F.uted -

Reason: Hethod: Eshabit G Instiusilons

, S Sihedn'eil A.Figuipment FailureII.xplain) 1-Manual fin Pseparati.m of Data H-Maintenance ci Test 2-Manual Scram 5.ntry Sheets f or 1.icemcc l

C.RcIncling 3-Automatic Scram lhent Repmt il I RII sie INI8Hl'G D Regulatoit Resitiction 4-Continued From Previous Month 0101I I Opesaio Tsaining & 1.itense l'.xamination 5-Rei'uc tion 0- AdministaatIve 9-Other 5 ,

G Ol veatismal I seus ll'aplain t IThabit 1 SJme Smasc 07/77) II Othe ilhplaint E

b '

'Af Telephone (412) 393-6000 Nuclear Group

~ P.O. Box 4 Shippingport, PA 15077-0004 March 7, 1985 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of February, 1985.

Very rul yours, J. Carey Vice President Nuclear Group rw Enclosures cc: NRC Regional Office King of Prussia, PA