MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
- - - -
1 yj, 'n-
- NARRATIVE SUFDfARY OF MONTHLY OPERATING EXPERIENCE February 1985 February.1 The Station was in Operational Mode I with Reactor Power at a nominal 100 percent. Reactor Coolant System was at normal operating pressure and temperature.
February 2' At.0542 hours0.00627 days <br />0.151 hours <br />8.96164e-4 weeks <br />2.06231e-4 months <br /> on the 2nd a power level. reduction, to through approximately 28 percent, began due to a condenser tube February 3 le ak. .The leaking condenser tube was plugged at 0250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> on the 3rd and a power level increase toward a nominal 100 percent began at 0745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br /> on the 3rd.
February 4- The Station was in Operational Mode I with Reactor Power through at a nominal 100 percent. Reactor Coolant System was at
~ February.7 normal operating pressure and temperature.
February 8 At 1114 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.23877e-4 months <br /> on the 8th, power level was reduced due to through a rapid drop in Reactor Coolant System temperature. The sFebruary 10 problem was attributed to boric acid ent ering - the demineralizer header through.a leaking isolation valve pH-49}. ( At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on the 8th the valve, [CH-49), was isolated and power escalation began, reaching a ' nominal 100 percent at .1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />.
Power level was reduced to approximately 28 percent at 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br /> on the 8th to perform maintenance on 'B' Feedwater Regulator Valve-[FCV-FW-488].
At 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br /> on the 10th the ' B' Feedwater Regulating Valve was. returned to se rvice. and . power . level was increased to a nominal 100 percent at 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br /> on the 10th.
February 11 The Station was in Operational Mode 1- with Reactor Power at a nominal 100 percent. Reactor Coolant System was
~
through February 14 at normal operating pressure and temperature.
February 15 Began a' power reduction at 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br /> due to a suspected problem with :a feedwater pump [ FW-P-1B] seal. At 1354-hours the scals integrity was restored, by reestablishing suction pressure in the feed pump, and power level was increased to a nominal 100 percent.
R.
fl
%, 7 , #, - :
m ,
~
}; e -
9' f,; p e:
t :ii +
February ' 1985.
~
- Summary of Monthly Operating Experience n
' February 16' The Station was in Operational Mode 1 with Reactor Power
-through . at .a nominal 100 percent. Reactor Coolant System was
- February 19
- at normal' operating pressure and temperature.
February .20 - eat. _ 0503 hours ' commenced reactor shutdown due -to condenser tube leaks. The Station was taken off line at
?
- 0551 hours0.00638 days <br />0.153 hours <br />9.11045e-4 weeks <br />2.096555e-4 months <br />,. the turbine was tripped at 0553 hours0.0064 days <br />0.154 hours <br />9.143518e-4 weeks <br />2.104165e-4 months <br /> and the Station entered Mode 3 at 0607 hours0.00703 days <br />0.169 hours <br />0.001 weeks <br />2.309635e-4 months <br />. .
. February 21 . At 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br />' the reactor was taken critical'. At 1112 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.23116e-4 months <br /> the Main Unit Generator.was synched to the ' grid.
2
~
At 1119 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.257795e-4 months <br /> a reactor trip / turbine trip occurred when-a main feed regulator valve spiked open. At 1423 hours0.0165 days <br />0.395 hours <br />0.00235 weeks <br />5.414515e-4 months <br /> the reactor was taken critical. At 1519 hours0.0176 days <br />0.422 hours <br />0.00251 weeks <br />5.779795e-4 months <br /> the Main 1 - Unit Generator'was' synched to the' grid. The Unit- then l operated at , a reduced power level due to 'C' Condenser waterbox being isolated and repairs on leaking condenser -
tubes continuing.
. February 22 The Station was operating at a' reduced power level of' _;
Lthrough - . approximately 85 percent until 'C' waterbox was returned !
' February 24 to service at 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> on the 24th. Power escalation
- then began reaching a nominal 100 percent at 1814' hours '
, - on'the ?.4th.
L February . 25 The _ Station'was in Operational Mode :1 with Reactor Power
- through; . .
at a nominal 100 percent. Reactor. Coolant System was at 1 February-26 normal operating pressure and temperature. -
' February 27- At 1415 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.384075e-4 months <br /> on the 27th commenced a power reduction to through -approximately 80 percent -due to a leaking condenser tube.
~ February;28 2
. 46'v v e f e<e 'tmt---rt*=-hv -**t-*'T-- -wr'7~eav v g- +rw--r-,g-+--g* -
- v+w,r ,py-,-vryv,-, -g,pr-ye-*-"-'*rw"-M*-r**et"w www'--++m-7**' '*w' t+*
-,,,, . ,. . . . . , . . .. - -. v. - -,.n. .- . . - . - . . - . . _ ~ . . .- . - . . . . . . . . - . . - - .
.c w: 4 . . .
r-F' , i.t ,
Fabruary.1985.
Summary of M:nthly- Operating Experienca'-
+.
9 p: -
t i p . . .
,4 MAJOR MAINTENANCE - FEBRUARY:1985 No major maintenance was. performed. during February. . .
t
~!-
- 4. .
. 4
- f. ..A
+ ,
t i
e
~
+
p i
a 3
L r i . b *- {
-r J
h 1 .
+.
I t ~
r i 4 r
. , C i , ,
^
h i-k4
- . 3 f
- 1. - .
h >.
. .+
4 i-iv . , . -,...-. . ) J . .. r. . . . 2 ..,.....,,.......,.._.,,m., _ _ . _ , , _ _ , , . . _ _ . _ , . . . . _ _ _ _ _ _ _ , , . _ . , _ _ _ ..,_._,,_.___,_.;
~ '
OP2RATISG DATA REPORT DOCKET NO. 50-334 DATE 3/7/85 [
COMPLETED BY P. A. Smith, 825
, TELEPl!ONE. 41 ?-44'a- 1
- OPERATING STATUS
- 1. Unit Name: Beaver Valley Power Sta tion. Unit #1 Notes
- 2. Reporting Period: ## d' /908
- 3. Licensed Thermal Power (MWt): WO '
4.' Nameplate Rating (Gross MWe): 923
- S. Design Electical Racing (Net MWe): 835
- 6. Maximum Dependable Capacity (Gross MWe): .. 860
. 7. Maximum Dependable Capacity (Net MWe): .
810
' 8. If Change'. Occurin Capacity Ratings (Items Number 3 Through 7) Since Last Report.,Give Reasons:
O 9. Power Lev'el To ich Restricted. If Any (Net MWe): None -
- 10. Reasons For Restri:tions.If Any; N/A -
. This Month .. . Yr to-Date " Cumulative II. Hours In Reporting Period 677 1416 ~~ 77,424 .
' 12. Number Of Hours Reactor Was Critical ' 647.o 1327.0 38,682.7
- 13. Reactor Reserve Shutdown Hours 0 *O 4,482.8 *
- 14. Hours Generator On.Line 638.7 ,
1255.6 37,338.5 IS. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1.495.791.6 2.726.457.6 86.124.971.6
- 17. Gross Electrical Energy Generated (MWH) 484.000 R80.000 27.374.400
- 18. Net Electrical Energy Generated (MWH) 452.100 815.146 ,25.439.983
- 19. Unit Service Factor 95.O RR.7 50.5
- 20. Unit Availability Factor _ 9s.0 88.7 50,5
- 21. Unit Capacity Factor (Using MDC Net) 83.1 71.1 44.0
- 22. Unit Capacity Factor (Using DER Net) 80.6 68.9 42.7 l 23. Unit Forced Outage Rate 5.0 5.3 26.5
- 24. Shutdowns Scheiluled Over Next 6 Months iType. Date.and Duration of Eacht:
N/A 2S. If Shut Down At End Of Report Period.Estimat-d Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): - Forecast Achieved INITIAL CRITICALITY N/A N/A
' ~
INTIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A (9/77)
L_. -
9 .
- Ak 'ERAGE DAILi UNIT FOWER LEVEL DOCKET NO. 50-334 UNIT 3Y?S Unit #1 DATE 3/7/85 COMPLETED BY P. A. Smith TELEPHONE (412) 643-1825 MOhW FEBRUARY i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY FOWER LEVEL -
, (MWe-Net) ~ ( g w ,.g er 1' 784 g7 783 3 331 784
..- IS 3 39 ' 825 783 131 4 20 826 89 5 3 6
, 705
~
825 -
663 7 23 742 -
704 g 24 123 -783
- 9. ,
10 -
26 825 -
825 703 1I 27 784 -705
- l g2 23 13 824 -
826 ~~~~
l
. 14 30 g, 783 y 16 822 ----
l INSTRUCTIONS On this formst.!ist the aver:ge d:aly unit power lese! in MWe Net for e:ch day in the reputting month. Compute 1o the ne: rest whole mepws:t.
(9/77) !
. 1
- l
- . UNIT SifuTDOWNS AND POWER REGUCTidNS DOCKET NO. 50-334 .
UNIT NAnf E BVPS Unit #1
, DATE 3/7/85 REPORT MONTit February 1985 COMPLETED BY P.-A.'Emith TELEPflONE (412) 643-1825_
i m
be an w so o u 0 " 'd e 05o Licensee. ,, E* Cause, & Corrective
- 4. No. Date . 8 'E U 2 Event !o S$
-- %. 8 g ,g; p g; & 'O Action to E
a 50 e u .c Report p = o Q. O ao Prevent Recurrence H u ywg gu 8 8
7 850202 F 0 A 5 N/A IIC llTEXCII 1 A nower reduction occurred at 0542 hrs. on the 2nd due to a condenser tube leak. The leaking tube was plugged and the condenser was returned to service at 0745 hrs. on the 3rd and power was n,ubsequently increased.
8 -850208 F 0 A 5 N/A PC VATNEX A power reduction occurred at 1114
, hrs. on the 8th due to horic acid entering the demineralizer header
- 1 through a leaking isolation valve
[Cil-49] .
1 The~ valve [Cil-49] was isolated at 1300 hrs and pownr was subs'equently l increased.
1 2 T: F.used 3 4 Reason: Hethod:
S: Schedu!cil I:mlubis G . Insions tions
, A Equipment Failure (Explain) 1-Manual lin Picpasali.m of Data H. Maintenance ci Test 2-Manual Scram i I:nli) Sheels for 1.icemcc C RefuelinE 3-Automatic Scram Freni Reptui 11 l'RI I de (NilRI G D Regulatos) Restsictism 4-Continued From Previous Month Ulet) i Upciaine Tsainmg A 1.icense I:xamination l Administrative 5.n. suction 9 0ther 5 G OperJIiemal I seen (l'aplaint .
ITlubit 1 Same Smese P8/77) i11 Olhes (lisplain t i.
UNITSilHTDOWNS AND F0WER REDUCTIONS DOCKET NO. . 50-334 .
UNIT NAME BVPS Unit Il DATE 3/7/85 REPORT MON'Ill February 1985 COMPLETED ay P. A.- Smith _
TELErilONE (412) 643-1825 -
ea tw 60 0 M
.S
- c t Licensee 4 @* Cause, & Corrective No. Date d e -% 5 0 3 Ia' E Event !e 5E Action to j; j5 j gj} aeport #
{g 8 Prevent Recurrence S
- 9 850208 F 0 B 5 N/A C11 VALVEX At 2100 hrs. on the 8th power level was reduced for maintenance of 'B' Feedwater Regulating Valve. The valve was repaired'at 0845 hrs. on ,
the 10th and power level was stibsc-quently increased.
10 850215 F 0 A 5 N/A lill VALVEX A power reduction occurred at 1350 hrs on the 15th then a condensate Pump Recirculation Valve failed open.
The valve was isolated at 1354 hrs.
on the 15th and power was subsequently increased.
i 1 2 F: F.uted 3 4 Reasem:
S: Sthedu!ed Hechod: l'xhibit G - Insteuttiims A Equipment FailutetExplain) 1-Manual l'on Pseparati.ni el Data B Maintenance of Test - 2-Hanual Scram I.ntry Sheets for 1.icemcc C Refuelint 3-Automatic Scram INent Repois 81 l'Hil ite (NilRI G D. Regulatory Restriction .
4-Continued From Previous Month 0161) 1 Opciator Tealning A 1.icense l'xaminallim 5-Reduction I Administrative 9-Other 5 G Operatismal I e nos ll'aplain t .
l'F/77) IThshit 1 Sanir Soinse II Olliesilh plaint l'
DOCKET NO. 50-334~ .
UNITSHilTDOWNS AND POWER HEDUCTIONS UNIT NAbf E BVPS Unit Il DATE 3/7/85 REPORT MONill February 1985 COMPLETED RY P. A. Smith TELEPHONE (412) 643-1825' gn iH 60 0
% u 0 " 0 "a .5 " Licensee 4 E* Cause .'&. Corrective No. Date %A. %5 l 33 E
C3 3"E
.c :3 gg Event !e u9 5$
' O. O Action to -
g gv g Report # gg g.o Prevent Recurrence ug{
2: m o o
11 850220 F 29.4 A 1 N/A HC llTEXCll ' At 0551 hrs. on the 20th commenced plant shutdown due to condenser tube leaks.
'C' Condenser Waterbox was isolated and the Station was Lack on-line, at a reduced power level, at.1112 hrs, on the 21st.
12 850221 F 4.0 A 3 85-06 Cll VALVEX At 1119 hrs on the 21st a reactor trip / turbine trip occurred when a Main Feedwater Regulating Valve spiked open. The valve was manually closed and the Station returned to service at 1519 hrs. on the 21st.
I 2 F: F.nted 3 4 Reason: Hechod: Inhibit C. Instristthins -
S S(hedu!cd A Equipment FailueetExplain) 1-Manual l'os Pseparati.m ol Data B-Maintenance ei Test :2-Manual Scram 1:nt ) Sheets for Ikensee C RefuelinE 3-Automatic Scram E*ent Repoit tI l'It I de INi RI'G D Regtdator) nesiikiron 4_continoea ero. ece,toua nonth oioni I Opesalos leaintog A ikense luminwiiusi $-Heduction l' Administsalive 9-Other 5
' G Operatiimal I seus ll'mplain) 1%hibit 1 Sanw.S.imu-l'P/77) II Othes flisplaint t-
~ ~ . - ..
_ _. E-: . _
DOCKET NO. 50-334 UNIT SHUTDOWNS AND POWER REDUCTIONS -
UNIT NAME BVPS U"It #1 ,
' DAIE- 3/7/85 REPORT MONiil February 1985 COMPLETEP BY P. A. Smith ~
TELEPlf0NE (412) 643-1825 m
k ca sw 00 0 M 0 "
c 0 ." t Licensee 4 5* Cause & Corrective No. be t e' ".D.
N5 k ;c 0
to i UE
,C :3 Of.
Event 0o WO 5$
O. o etien to g gw g gg Report # g 'g gu Prevent Recurrence ,
x 5 O
m u O
.?
i j 13 850221 F 0 A 5 N/A HC HTEXCH Power was held at a reduced level as testing for leaking condenser tubes continued. No additional leaks
' were found and the condenser was returned to full service at 1250 hrs.
on the 24th.
1
- 14 850227 F 0 A 5 N/A IIC HTEXCH At 1415 hrs. on the 27th a power reduction occurred due to a con-denser tube leak. Testing to locate
- the leak continued through the end
- of the month.
i l
l.
1 2 3 4 l: F.uted -
Reason: Hethod: Eshabit G Instiusilons
, S Sihedn'eil A.Figuipment FailureII.xplain) 1-Manual fin Pseparati.m of Data H-Maintenance ci Test 2-Manual Scram 5.ntry Sheets f or 1.icemcc l
C.RcIncling 3-Automatic Scram lhent Repmt il I RII sie INI8Hl'G D Regulatoit Resitiction 4-Continued From Previous Month 0101I I Opesaio Tsaining & 1.itense l'.xamination 5-Rei'uc tion 0- AdministaatIve 9-Other 5 ,
G Ol veatismal I seus ll'aplain t IThabit 1 SJme Smasc 07/77) II Othe ilhplaint E
b '
'Af Telephone (412) 393-6000 Nuclear Group
~ P.O. Box 4 Shippingport, PA 15077-0004 March 7, 1985 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of February, 1985.
Very rul yours, J. Carey Vice President Nuclear Group rw Enclosures cc: NRC Regional Office King of Prussia, PA