Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
- - - - . _ - - -.. - . -._ - - . _. .. .. - - . ..... - - - - - . . - . - . . -
9 k
YVg
- T4tF
- M T.,+pnon stn an,w E$$.l""
tamn9wtPAim wd April 8, 1991 3
Beaver Valley Power Statico Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. l@F-73 Monthly Ooeratirn Report l
U. S. Nuclear Regulatory Ctanission Document Cbntrol Desk Washirgton, D.C. 20555 Gentlement In accordance with Apperdix A, Technical Spocifications, the Mor.thly Operathy Report is subnitted for Unit 1 and Unit 2 for the month of M1rch, 1991.
Very truly yours, I'
. D. Sieber Vice President Nuclear Group WM/ mig Enclosures cc: NRC Regional Office Kirg of Prussia, PA 1 T.i n 1 A 9104160344 910331 -
PDR ADOCK 05000334 I i
R PDR 't
\(
_.m._ . . - . - . . . - _ _ _ . _ . . _ . - . . - _ . . . _ _ _ . . - _ . _ _ . . _ . . . _ _ _ _ _ , _ . _ . _ _ . . _ - . _ _ _ . _ . _ ,
L i
+
i -
AVERME MILY LEIT ICWER 11 VEL 1
[ Docket No. 50-334 i Unit BVPS Unit 1 Data Acril 7, 1991 Completed by M. A. Wirner j h iephone f412)393-7621 i
MJtml MARut 1991. i CAY AVERME MILY POWER LEVEL . MY - AVERAGE MILY POWER LEVEL
()Me-Net) _.
(Mk-Net) [
1 803 17- 808 j 2 804 18 803 3 812 19 813-l l
4 812 20 804 !
4 o 817 21 _. 808 6 808 22 796
-7 821 23- 804 8 808 24 808 ~
9 813 25 804 10 817 , 26 800 11 800 27 750 12 725 28. 771
-13 -800 29 788 ?
l-.- 14 .,_ 654 30 646 15 . 808 31 742 16 808-INSIRUCTIONS -.
i on this format, list the average daily unit' power level:in )Me-Net for each day.
in the reporting month.~ Cangute to the nearest _whole'. megawatt.'
i
. . _ ~ . _ . , . . , ~ . . - _ , _ . . . . .......__.,_..._.,m. . . . _ - _ . . . _ . . . . . _ , , , _ . . . , . , . , , . . . . , ~ . , . . . . . . . , . . . , _ . . . _ , . . . . _ ...w,,-..__._ ,, ,,..
NARRATIVE SlM4ARY OF IOlmILY OPIPATING DCPERID4CE LNIT I MARG 1991 March 1 he unit operated at a ncaninal value of 100% output.
thrcugh lurch 10 March 11 At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit's output was reduced to 80% to load follw.
March 12 At 1114 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.23877e-4 months <br /> the Unit's output was escalated to a nominal-value of 100%. '
March 13 At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit's output was reduced to 80% to load follow.
March 14 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit's output was escalated to a ncuninal value of 100%.
}hrch 15 S e Unit operated at a ncminal value of 100% output, through March 25 March 26 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit's output was reduced to 80% to load follow.
March 27 At 0450 hours0.00521 days <br />0.125 hours <br />7.440476e-4 weeks <br />1.71225e-4 months <br /> the Unit's output was escalated to a nominal value of 100%. At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit's output was' reduced to 80% to load follow.
l I
turch 28 At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> the Unit's output was escalated to a ncaninal value of 100%.
March 29 At 2100' hours the Unit's output was reduced to 80% to load follow.
March 30 S e Unit operated at 80% output to load follow.
l March 31 At 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> the Unit's output was escalated to a nominal value of 100%.
UNIT SHUTDOWNS AND POWER REDUCTIONS Docket No. 50-334 Unit Name BVPS Unit #1 Date Aprit 7. 1991.
Completed By M.A. vinger REPORT MONTN MARCH 1991 Telephone (412) 393-76i'1 Method of Licensee Cause k Corrective Duration Shutting Event System Component Action to Co. Date Typel (Nours) ReasonZ Down Reactor 3 Report 8 tode4 Codes Prevent Recurrence
+ - -
6 910311 $ 0 N 5 N/A ZZ ZZZZZZ Reduced out put from 100% to 80%
to load follow.
7 910313 $ 0 N 5 N/A ZZ ZZZZZZ Reduced out put from 100% tv ',0 %
to toad follow.
8 910326 S 0 N 5 N/A ZZ 2Z2222 Reduced output from 100% to 80%
to load follow.
9 910327 S 0 N 5 N/A 7Z ZZZZZZ Reduced out put from 100% to e0% .
to toad fottow.
10 910329 S O N 5 N/A ZZ ZZZZZZ Redoced output from 100% to 801 to lead fattow.
F-Forced Reason: Method: Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Esptain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manuel Scram for Licensee Event Report (LER) File C-Refueting 3-Automatic Scram (NUREGOf61).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reductier. 5 F-Administrative 9-Other Exhibit I-Same Source.
G-Operational Error (Explain)
H-Other (Explain)
OPERATING DATA REPORT DOCKET 110.: 50 334 REPORT DATE: 04/07/91 COMPLETED BY: M.A.VINGER TELEPil0NE : (412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: MARCH 1991
- 3. LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Gross MVo): 923
- 5. DESIGN ELECTRICAL RATING (Net MVe): 835
- 6. MAX. DEPENDABLE CAPACITY (Cross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. PJWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744.0 2160.0 130752.0
- 12. NO. OF MRS REACTOR WAS CRITICAL: 744.0 1819.5 82113.9
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE: 744.0 1785.8 80330.8
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0,0
- 16. CROSS THERMAL ENERGY GEN. (MVH): 1920600.0 4581594.0 190870041,f
- 17. GROSS ELECT, ENERGY GEN. (MWH): 619720.0 1481110,0 61313839.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH): 586950.0 1400860.0 57265060,0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 82.7 63.6
( 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 82,7 63,6
- 21. UNIT CAPACITY FACTOR (MDC): PCT 97.4 80,1 57.0
- 22. UNIT CAPACITY FACTOR (DER): PCT 94.5 77.7 55.3
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 17.3 16.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
THE UNIT IS SCHEDULED TO SHUTDOWN FOR THE UNIT'S 8TH REFUELING OUTAGE ON APRIL 12.1991. THE UNIT IS SCHEDULED TO BE SHUTDOWN FOR 10 WEEKS.
- 25. IF SHUT DOVN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A ~ N/A COMMERCIAL OPERATION N/A N/A
. _ . _ . _ _ . . ~ . _ . . _ _ _ _ . _ . _ - _ . - . . _ . _ . . . _ . _ . . . . _ . - _ _ . _ . _ . _ _ _ _ . . . _ _ - . _ . _ ._.
l .
i NARRATIVE SLM ERY OF EffIHLY OPERATING EXPIRIENCE LNIT II MAROI 1991
- March 1 The Unit operated at a ncminal value of 100% cutptt. '
March 2 At 0018 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> the Unit's wtptt was reduced to 75% to load follow.
March 3 At 0815 hours0.00943 days <br />0.226 hours <br />0.00135 weeks <br />3.101075e-4 months <br /> the Unit's outp2t w s macalated to 100%.
March 4 The Unit operated at a naminal value of 100% output.
thrmgh March 8 March 9 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the Unit's output was r d M to 75% to load follow.
March 10 At 0808 hours0.00935 days <br />0.224 hours <br />0.00134 weeks <br />3.07444e-4 months <br /> the Unit's outmt was escalated to a nominal value of 100%.
i-March 11 The Unit operated at a naminal value of 100% output.
through
- March 31 1
4 AVDMGE MILY LNIT POWER IEVLL Docket llo. 50-412 Unit BVPS Unit 2 Date Anril 7. 1991 Canpleted by M. A. Wimer
'Iblephono f 4121 393-7621
!Cml 1%Rd 1991 DAY AVERAGE DAILY POWER 11 VEL DAY AVERAGE DAILY POWER LEVEL
(!Se-liet) (!He-flot) 1 811 17 811 2 598 18 811 3 725 19 811 ..
4 815 20 811 5 815 21 807 6 807 22 807 7 815 23 803 8 815 24 811 9 619 25 815 _
10 729 26 807 11 819 27 803 12 811 28 -
811 13 815 29 811 14 811 30 Bil 15 811 31 815 16 811 INSTRUCTIONS On this format, list the average daily unit pcrer level in !No-Net for cach day in the reportirq manth. Oxpute to tra nearest khote megawatt.
UNIT SMUTDOuMS AND POuER REDUCT10e5 Docket 50. 50-412 '
Unit Name gvPS Unit #2 Date Aprit 7. 1991 Completed 8y N.A. uineer REPORT NOETM MARCN 199T telephone f412) 393-T621 Method of Licensee Cause & Corrective Duration shutting Event System. Component. Action to Co. Date Typet' ' (sours) Reason 2 Down Reactor 3 Report s Code 4 Code 5 Prevent R ecurrenc e
- t. 910302 S 0 N 5 N/A ZZ ZZZZZZ Reduced output free 100% to 75% to toad feltou.
2 910309 S 0 m 5 N/A 2Z ZZZZZZ Reduced output free 100% to 75% to lead follow.
1 -2 3 4 F-Forced Reason: Method: - Exhibit G-Instructions for S-Scheduled- A-Equipment Failure (Emplain)- 1-Manual Preparation of Sata Entry Sheets B-Naintenance or Test 2-Manual Scree for Licensee Event Report (LER) File C-Refueling . .
3-Automatic Scree (mueEG0161).
D-Regulatory Restriction 4-Cont'd. free Previous Nonth ..
E-Operator Training & License Exas S-Reduction 5 F-Administrative .
,9-Other' Exhibit t-Same Source.
6-Operational Error (Emptain)
N-Other (Emplain)
. _ >s - . m._ -v. e.<.m__.m-_. m__, ..s,---,- - - - o-------- s.-_----..x. - < - - - - - - - - . - - - - - - - --m. , . . - - = - - -m..- --u_- --.---m----+_--. - - . , - - - - - -
-m~ m
OPERATING DATA REPORT DOCKET NO.. 50 412 REPORT DATE: 04/07/91 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes 1
- 2. REPORTING PERIOD: MARCH 1991
- 3. LICENSED THERMAL POWER (MWt): 2652 i
- 4. NAME2 LATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870
- 7. MAX, DEPENDABLE CAPACITY (Net MWe): 820
- 8. IP CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Het MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744,0 2160.0 29535.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 744,0 2160.0 24507.3
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE: 744,0 2160.0 24321.8
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 10 GROSS THERMAL ENERGY GEN. (MWH): 1920061.0 5658549.0 58786165.4
- 17. GROSS ELECT. ENERGY GEN. (MWH): 621600.0 1830600.0 18867400.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH): 589614,0 1737998.0 17781322.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 82.3
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 82.3
- 21. UNIT CAPACITY FACTOR (MDC): PCT 96.6 98.1 72.5
- 22. UNIT CAPACITY FACTOR (b PCT 94.8 96,2 72.0
- 23. UNIT FORCED OUTAGE RATE: s ERCENT) 0.0 0.0 4.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l