Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248H732 + (ML20248H732)
- ML20248H733 + (ML20248H733)
- 05000346/LER-1989-003, On 890118,reactor Trip from 100% Power Occurred Due to Spurious CRD Trip Confirm Signal.Cause of Signal Narrowed to at Least One of Three Logic Boards in CRD Sys Logic Cabinet 1.Boards to Be Returned + (ML20248H734)
- ML20248H735 + (ML20248H735)
- ML20248H736 + (ML20248H736)
- ML20248H738 + (ML20248H738)
- ML20248H739 + (ML20248H739)
- ML20248H740 + (ML20248H740)
- ML20248H741 + (ML20248H741)
- ML20248H747 + (ML20248H747)
- ML20248H749 + (ML20248H749)
- ML20248H751 + (ML20248H751)
- ML20248H752 + (ML20248H752)
- ML20248H753 + (ML20248H753)
- IR 05000313/1989033 + (ML20248H756)
- ML20248H760 + (ML20248H760)
- ML20248H761 + (ML20248H761)
- ML20248H763 + (ML20248H763)
- ML20248H767 + (ML20248H767)
- ML20248H768 + (ML20248H768)
- 05000369/LER-1989-023, :on 890831,ESF Actuation Occurred When Nuclear Svc Water to Auxiliary Feedwater Isolation Valve Repositioned to Open.Caused by Improperly Following Correct Procedure.Signal to Valve 1CA-86 Cleared + (ML20248H772)
- ML20248H773 + (ML20248H773)
- B13203, Part 21 Rept Re Defects in Circuit Breakers Used in New Switch Gear Bldg.Initially Reported on 890403.Various Corrective Actions Completed to Restore 480-volt Load Ctr to Suitable Design Condition + (ML20248H774)
- ML20248H775 + (ML20248H775)
- ML20248H779 + (ML20248H779)
- IR 05000267/1989019 + (ML20248H780)
- ML20248H781 + (ML20248H781)
- ML20248H782 + (ML20248H782)
- ML20248H786 + (ML20248H786)
- ML20248H787 + (ML20248H787)
- ML20248H788 + (ML20248H788)
- ML20248H791 + (ML20248H791)
- ML20248H792 + (ML20248H792)
- ML20248H793 + (ML20248H793)
- ML20248H794 + (ML20248H794)
- ML20248H799 + (ML20248H799)
- 3F0698-17, Submits Results of Evaluation to NRC Re GL 87-02, Verification of Seismic Adequacy of Mechanical of Condenser & Electrical Equipment in Operating Reactors (USI A-46) for Evaluation of Condenser Hotwell Suction Isolation Valve + (ML20248H803)
- ML20248H804 + (ML20248H804)
- ML20248H806 + (ML20248H806)
- ML20248H810 + (ML20248H810)
- ML20248H811 + (ML20248H811)
- ML20248H812 + (ML20248H812)
- ML20248H818 + (ML20248H818)
- ML20248H820 + (ML20248H820)
- ML20248H823 + (ML20248H823)
- ML20248H824 + (ML20248H824)
- ML20248H825 + (ML20248H825)
- IR 05000353/1989007 + (ML20248H826)
- ML20248H829 + (ML20248H829)
- ML20248H833 + (ML20248H833)
- ML20248H835 + (ML20248H835)