M October 3,^1989!
EN 89-95
.~
OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Portland General Electric Company'
' (EA89-162)
(Trojan)
~t Docket No. 50-344 4
Subjecti
-. PROPOSED IMPOSITION OF CIVIL PENALTY - $280,000 This is to inform the Comission that a Notice of. Violation and Proposed Impos_ition of. Civil Penalty in the amount of $280,000 will be issued on or aboutOctober6,.1989toPortlandGeneralElectric(Trojan)..Thisaction
-is based on a number of significant safety violations that.have been aggregated J
into a single Severity Level II _ problem for an inoperable containn,ent recir-culation sump function. The. violations included the failure to perform adequate inspections of the recirculation sump for debris, and the failure to-inspect.
pump suction screens for damage; deficiencies which actually existed and were subsequently-identified by the Resident Inspectors after licensee closecut
' inspections.< The licensee also failed to take adequate corrective action to
- control the,. introduction of debris into the sumps, despite a number of previous
. problems, and. failed to adequately implement corrective action that they committed to'in' response:to two previous Notice of Violations and Proposed Imposition of Civil Penalties _ issued in 1986, which should have identified missing sump 3mmponents required by design specifications..The civil penalty
/ was escalated by'50% because'the NRC identified most aspects of the violations, 50% for[ poor past performance -100% for the prior notice of similar events, and
.another/100% because'some of the deficient conditions may have existed since initia1'startup. The civil penalty was mitigated 50% because of the corrective 0
actions which. included extensive management changes.
i.
T
> lit should.be,noted' that the' licensee has not been specifically informed of the
- enforcement. action. The schedule.of fssuance and notification is
Mailing of Notice-.
October 6, 1989 Telephone Notification of License.e October 6, 1989 The State of Oregon will be notified.
The licensee has thirty days from the date of the Notice in which to respond.
Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.
Contact:
W. Troskoski, OE, 23281 J. Lieberman, OE, 20741 Distribution OWFN /a:E -
OWFN /Bt3O MNBB /d.3 6 g
Chairnian Carr EDO
- RM 4
Conn. Roberts DEDR AE0D f
Comm. Rogers DEDS Comm. Curtiss OE SECY NMSS ACRS NRR CA 01
)'
GPA SP
. 0GC Regional Offices MAIL g910120078 sN oos gigg;30 RIV /a:30 ADM: Doc. Mgt. Br.
El 8 5
FDC RII go RV a:3o PDR OIG RIII RES PRELIMINARY INFORMATION - f:0T FOR PUBLIC DISCIDSURE UNTIL PUBLICLY ANNOUNCED rj h
-