Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000133/1989002 + (ML20248D375)
- ML20248D377 + (ML20248D377)
- ML20248D378 + (ML20248D378)
- RA89-003, Forwards Review of Technical Content of 890417 Reactor & Senior Reactor Operator Exams Given at Facility,Including Comments & Recommended Actions for Each Question Under Review + (ML20248D380)
- SVP-98-198, Forwards Response to Request for Addl Info Re USI A-46, Seismic Qualification of Equipment in Operating Plants + (ML20248D381)
- ML20248D382 + (ML20248D382)
- ML20248D384 + (ML20248D384)
- ML20248D385 + (ML20248D385)
- ML20248D386 + (ML20248D386)
- 05000311/LER-1989-011, :on 890522,determined That Tech Spec 4.3.2.1.1 Had Not Been Fully Complied With.Caused by Inadequate Design Review.Design Change Modifying Circuitry to Allow Continuity Testing Will Be Completed Next Outage + (ML20248D387)
- 1CAN098903, Application for Amend to License DPR-51,authorizing Operation Up to Max steady-state Reactor Core Power Level of 2,054 Mwt (100% Power) + (ML20248D388)
- ML20248D391 + (ML20248D391)
- ML20248D392 + (ML20248D392)
- ML20248D397 + (ML20248D397)
- ML20248D398 + (ML20248D398)
- ML20248D399 + (ML20248D399)
- ML20248D404 + (ML20248D404)
- ML20248D407 + (ML20248D407)
- ML20248D410 + (ML20248D410)
- ML20248D414 + (ML20248D414)
- 05000259/LER-1989-014, :on 890606,diesel Generators 1B & 1D auto-started During Performance of Surveillance Procedure O-SI-4.9.A.3.a,resulting in Actuation of Esf.Caused by Personnel Error.Procedure Revised + (ML20248D415)
- ML20248D416 + (ML20248D416)
- ML20248D421 + (ML20248D421)
- ML20248D422 + (ML20248D422)
- ML20248D424 + (ML20248D424)
- ML20248D427 + (ML20248D427)
- ML20248D429 + (ML20248D429)
- IR 05000369/1989014 + (ML20248D432)
- ML20248D434 + (ML20248D434)
- ML20248D435 + (ML20248D435)
- 05000293/LER-1989-014, :on 890412,inadvertent Overpressurization of RCIC Suction Piping Occurred During Surveillance Testing. Caused by Personnel Error.Personnel Trained Re Procedural Changes + (ML20248D436)
- ML20248D440 + (ML20248D440)
- ML20248D441 + (ML20248D441)
- ML20248D446 + (ML20248D446)
- ML20248D448 + (ML20248D448)
- ML20248D449 + (ML20248D449)
- 05000321/LER-1989-003-01, :on 890302,determined That Monthly Functional Test Required by Tech Specs Tables 4.1-1 & 4.2-9 Not Performed Since 881210.Caused by Software Deficiency.Test Performed & Surveillance Task Reactivated + (ML20248D450)
- ML20248D452 + (ML20248D452)
- ML20248D454 + (ML20248D454)
- ML20248D459 + (ML20248D459)
- ML20248D461 + (ML20248D461)
- ML20248D463 + (ML20248D463)
- ML20248D464 + (ML20248D464)
- ML20248D465 + (ML20248D465)
- ML20248D466 + (ML20248D466)
- B13330, Responds to NRC Bulletin 88-003, Inadequate Latch Engagement in HFA-Type Latching Relays Mfg by Ge. Insp of 46 Relays Considered Class 1E Completed.Five Deficient Relays Replaced + (ML20248D469)
- ML20248D470 + (ML20248D470)
- ML20248D472 + (ML20248D472)
- ML20248D480 + (ML20248D480)
- ML20248D482 + (ML20248D482)
- ML20248D486 + (ML20248D486)