Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248A576 + (ML20248A576)
- IR 05000483/1989017 + (ML20248A577)
- NRC-89-0167, Addresses Status of Actions Arising from as-built Drawing Issue.All Category a & B Items Completed & Majority of Category C Deviations Resolved + (ML20248A579)
- 05000445/LER-1998-004, :on 980427,failure to Perform Response Time Testing of Shunt Trip Feature of Reactor Trip Breaker.Caused by Failure to Recognize Difference in Functional Designs. Breaker Was Declared Inoperable & Test Was Performed + (ML20248A581)
- ML20248A583 + (ML20248A583)
- IR 05000445/1989066 + (ML20248A586)
- ML20248A589 + (ML20248A589)
- IR 05000373/1998009 + (ML20248A591)
- ML20248A592 + (ML20248A592)
- ML20248A593 + (ML20248A593)
- IR 05000333/1989013 + (ML20248A595)
- ML20248A596 + (ML20248A596)
- ML20248A597 + (ML20248A597)
- ML20248A598 + (ML20248A598)
- ML20248A599 + (ML20248A599)
- ML20248A602 + (ML20248A602)
- ML20248A603 + (ML20248A603)
- ML20248A610 + (ML20248A610)
- IR 05000317/1989080 + (ML20248A611)
- ML20248A612 + (ML20248A612)
- ML20248A613 + (ML20248A613)
- ML20248A616 + (ML20248A616)
- ML20248A618 + (ML20248A618)
- ML20248A619 + (ML20248A619)
- ML20248A620 + (ML20248A620)
- ML20248A623 + (ML20248A623)
- ML20248A626 + (ML20248A626)
- ML20248A628 + (ML20248A628)
- ML20248A631 + (ML20248A631)
- ML20248A633 + (ML20248A633)
- BECO-89-144, Requests Interim Approval for Relief from Testing of RHR Sys Valves 63 & 64 Until Refueling Outage 8 Scheduled for 910315 + (ML20248A634)
- NUREG-1272, Forwards List of 1988 Lers,List of Abnormal Occurrences as Defined by NRC & Contained in 1988 AEOD Annual Rept,App B & Raw Data on Radioactive Matls Released Into Environ from Commercial Nuclear Power Plants in 1988.W/o Ref Encl + (ML20248A635)
- ML20248A637 + (ML20248A637)
- ML20248A639 + (ML20248A639)
- 05000267/LER-1989-011, :on 890623,discovered That Reheat Steam Attemperation Flow Not Accounted for in Secondary Heat Balance Calculation of Reactor Power.Caused by Inadequate Procedures.Procedure Changes Implemented + (ML20248A641)
- 05000295/LER-1989-013-02, :on 890823,testing of Main Steam Safety Valves Revealed Majority of Valves Had Setpoints Low Outside +/- 1% Tolerance.Caused by Elevated Temps at Work Site.Plant Shut Down on 890826 & Instrumentation Evaluated + (ML20248A642)
- ML20248A643 + (ML20248A643)
- 05000278/LER-1989-002-03, :on 890829,reactor Vessel lo-lo-lo Level Signal Generated Resulting in Unit 2 RHR Pump Trip Signal.Caused by Combination of Personnel Error & Degraded Equipment.Trip Alarms Cleared & Isolation Valve Replaced + (ML20248A644)
- ML20248A646 + (ML20248A646)
- ML20248A647 + (ML20248A647)
- ML20248A648 + (ML20248A648)
- ML20248A650 + (ML20248A650)
- ML20248A652 + (ML20248A652)
- ML20248A654 + (ML20248A654)
- ML20248A655 + (ML20248A655)
- ML20248A657 + (ML20248A657)
- ML20248A659 + (ML20248A659)
- ML20248A661 + (ML20248A661)
- ML20248A662 + (ML20248A662)
- ML20248A663 + (ML20248A663)
- IR 05000423/1989011 + (ML20248A664)