Text
_
- l 4.. ' '
'I 1
@ M g* fey Power Steron L=t
,7
[.:
Shippingport, PA 150776 U.5Mko.., c,oop wmsmas Se'ptember 22, 1989 U. S. Nuclear Regulatory Commission
. Attn:
Document Control Desk
-Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 170 Gentlemen:
Enclosed.are:
1.
' Application for Amendment to the above operating license to remove containment isolation valve SI-91 from Table 3.6-1 to allow removal of this valve and piping in accordance with DCP-1249.
This. change was reviewed by the OSC and ORC and determined to be safe and does not involve an unreviewed safety question.
2.
Documents designated Attachments A, B and C which set forth.
the change to the Technical Specifications, the safety analysis and the no significant hazards evaluation.
The proposed design modification.
involves a
technical specification change and in accordance with 10 CFR 50.59, prior NRC approval is required.
Therefore, it is requested that the amendment issue date be determined based on our discussions with the NRC Project Manager.
Very truly yours,
,4.
D. Sieber l/Vice President Nuclear Group
-cc:
Mr. J.
Beall, Sr. Resident Inspector Mr. W.
T. Russell, NRC Region I Administrator Mr.
P. Tam, Sr. Project Manager Mr..T. M. Gerusky, Director BRP/ DER Mr.~R. Janati, BRP/ DER f
VEPCO gDI s91oo20263 e9o922 l
PDR ADOCK 05000334 P