Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247R209 + (ML20247R209)
- ML20247R210 + (ML20247R210)
- ML20247R211 + (ML20247R211)
- ML20247R212 + (ML20247R212)
- ML20247R213 + (ML20247R213)
- ML20247R216 + (ML20247R216)
- ML20247R217 + (ML20247R217)
- ML20247R219 + (ML20247R219)
- 05000306/LER-1998-002, :on 980201,defect in Primary Sys Pressure Boundary Was Observed on Motor Tube Base of Part Length CRDM Housing.Caused by Flaw on G9 Part Length Crdm.Unit 2 Part Length CRDMs Have Been Removed & Replaced + (ML20247R221)
- ML20247R223 + (ML20247R223)
- PNO-III-89-049, on 890731,reactor Operators Manually Scrammed Reactor from 25% Power as Water Level in Reactor Approached High Level Reactor Trip Point.Caused by Rupture in Bellows on Feedwater Header.Outage Expected to Last Approx 4 Days + (ML20247R225)
- ML20247R226 + (ML20247R226)
- ML20247R227 + (ML20247R227)
- ML20247R228 + (ML20247R228)
- ML20247R229 + (ML20247R229)
- ML20247R232 + (ML20247R232)
- ML20247R233 + (ML20247R233)
- ML20247R234 + (ML20247R234)
- ML20247R238 + (ML20247R238)
- B13146, Responds to NRC Questions Re Vacuum Breakers from Torus to Reactor Bldg + (ML20247R239)
- ML20247R241 + (ML20247R241)
- ML20247R245 + (ML20247R245)
- AECM-89-0010, Rept of 10CFR50.59 Safety Evaluations for June-Dec 1988 + (ML20247R249)
- ML20247R250 + (ML20247R250)
- ML20247R253 + (ML20247R253)
- IR 05000458/1989012 + (ML20247R255)
- ML20247R260 + (ML20247R260)
- 05000416/LER-1998-002-01, :on 980421,failure to Maintain Standby DG Seismically Qualified as Required by TS Was Noted.Caused by Failure to Comply W/Sys Operating Instruction 04-1-01-P75-1. Door Was Closed Immediately + (ML20247R261)
- NRC-89-3448, Forwards Westinghouse SP/90 Position on Selected Severe Accident Issues to Be Discussed During 890714 Meeting W/Nrc in Rockville,Md.Issue Topics Include Fire Protection, Intersys Loca,Midloop Operation & ATWS + (ML20247R262)
- ML20247R263 + (ML20247R263)
- ML20247R264 + (ML20247R264)
- ML20247R266 + (ML20247R266)
- ML20247R267 + (ML20247R267)
- ML20247R270 + (ML20247R270)
- ML20247R271 + (ML20247R271)
- ML20247R273 + (ML20247R273)
- ML20247R274 + (ML20247R274)
- ML20247R275 + (ML20247R275)
- PNO-II-89-041A, Updating PNO-II-89-041 Re Apparent Pyrophoric Reaction in Depleted U Waste Shipment Received at Barnwell Low Level Waste Disposal Facility.Cause of Reaction Undetermined.Ban on Waste Shipments to Facility Placed + (ML20247R277)
- ML20247R278 + (ML20247R278)
- ML20247R280 + (ML20247R280)
- ML20247R281 + (ML20247R281)
- ML20247R282 + (ML20247R282)
- ML20247R283 + (ML20247R283)
- ML20247R285 + (ML20247R285)
- 05000282/LER-1998-005-01, Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl + (ML20247R287)
- ML20247R288 + (ML20247R288)
- ML20247R291 + (ML20247R291)
- ML20247R292 + (ML20247R292)
- ML20247R293 + (ML20247R293)
- ML20247R294 + (ML20247R294)