Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247M988 + (ML20247M988)
- ML20247M989 + (ML20247M989)
- ML20247M993 + (ML20247M993)
- ML20247M995 + (ML20247M995)
- ML20247M996 + (ML20247M996)
- ML20247M997 + (ML20247M997)
- 05000425/LER-1989-019, :on 890502,overspeed Trip Device Malfunctioned During Weekly Turbine Trip Device Operability Test.When Button Pushed Turbine Tripped,Resulting in Reactor Trip. Caused by Defective Weld Joint.Weld Repaired + (ML20247M999)
- NOC-AE-00015, Responds to Violations Noted in Insp Repts 50-498/98-04 & 50-499/98-04 Re Implementation of Plant Change W/O Obtaining Prior NRC Review & Approval.Util Believes That No Violation Occurred Due to Reasons Provided + (ML20247N000)
- ML20247N001 + (ML20247N001)
- ML20247N004 + (ML20247N004)
- ML20247N006 + (ML20247N006)
- ML20247N007 + (ML20247N007)
- IR 05000382/1989007 + (ML20247N008)
- U-603002, Provides Response to 980327 RAI Re Thermo-Lag Related Ampacity Derating Issues for GL 92-08, Thermo-Lag 330-1 Fire Barriers. Commitments Made by Util,Listed + (ML20247N010)
- ML20247N012 + (ML20247N012)
- ML20247N014 + (ML20247N014)
- ML20247N015 + (ML20247N015)
- ML20247N016 + (ML20247N016)
- ML20247N017 + (ML20247N017)
- IR 05000309/1989002 + (ML20247N019)
- ML20247N020 + (ML20247N020)
- ML20247N022 + (ML20247N022)
- ML20247N023 + (ML20247N023)
- ML20247N025 + (ML20247N025)
- ML20247N027 + (ML20247N027)
- ML20247N028 + (ML20247N028)
- 05000424/LER-1988-025, :on 880731,lightning Struck Containment Bldg, Resulting in Reactor Trip.Caused by Electrical Surge from Lightning Strike Shutting Down Computers.Circuit Board in Security Sys Backup Computer Replaced + (ML20247N031)
- ML20247N032 + (ML20247N032)
- 05000461/LER-1998-019, :on 980417,noted Failure to Satisfy TS for Ensuring That Electrical Loads Properly Sequence Onto safety-related Buses.Caused by Inadequate Surveillance Procedures.Will Revise Procedures 9080.21 & 9080.22 + (ML20247N034)
- ML20247N035 + (ML20247N035)
- ML20247N036 + (ML20247N036)
- ML20247N039 + (ML20247N039)
- ML20247N040 + (ML20247N040)
- ML20247N041 + (ML20247N041)
- ML20247N042 + (ML20247N042)
- ML20247N043 + (ML20247N043)
- ML20247N045 + (ML20247N045)
- 05000412/LER-1989-016, :on 890427,radwaste in Transit Not Properly Posted.Caused by Failure of Prework Briefing to Discuss Disposition of Mop Heads & Failure of Technician to Tag Bag. Checklist Will Be Developed + (ML20247N046)
- ML20247N047 + (ML20247N047)
- ML20247N048 + (ML20247N048)
- ST-HL-AE-3176, Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Long-term Erosion/Corrosion Procedures Will Be Completed by 901231.Until Procedures Finalized,Nde of Erosion/Corrosion Susceptible Sys Will Be Done by Vendor + (ML20247N049)
- ML20247N052 + (ML20247N052)
- ML20247N053 + (ML20247N053)
- ML20247N055 + (ML20247N055)
- ML20247N056 + (ML20247N056)
- ML20247N061 + (ML20247N061)
- ML20247N062 + (ML20247N062)
- 05000412/LER-1989-013, :on 890427,svc Water Flow Through Recirculation Spray Sys HXs Discovered Below Tech Spec Requirements.Caused by Buildup of Asiatic Clams.Hx Tubes Cleaned,Limit Switches Adjusted & Task Force Developed + (ML20247N063)
- 0CAN058907, Responds to NRC Re Weaknesses Noted in Insp Repts 50-313/89-12 & 50-368/89-12 on 1989 Radiological Emergency Preparedness Exercise.Corrective Action:Staffing Levels of Certain Key Emergency Response Positions Will Be Evaluated + (ML20247N066)
- ML20247N068 + (ML20247N068)
- ML20247N069 + (ML20247N069)