Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-3110, Readiness to Begin Ascent to Full Power:Self Assessment Rept + (ML20247K324)
- IR 05000334/1989014 + (ML20247K325)
- ML20247K328 + (ML20247K328)
- 05000302/LER-1989-008, :on 890222,determination Made That Plant Being Operated Outside Design Bases.Caused by Personnel Error. Isolation Valve for Each Steam Trap Reopened.Revised Dose Analysis & Results Will Be Incorporated in Rev to FSAR + (ML20247K329)
- 05000373/LER-1989-005, :on 890207,determined That Static-O-Ring in Main Steam Line Flow Switch Exceeded Rejection Limits,Cause Not Determined.Replacement Flow Switch Installed,Calibr & Placed in Svc + (ML20247K331)
- ML20247K332 + (ML20247K332)
- B13187, Lists Amount of Property Insurance Coverage Currently in Effect at Facilities by Types of Coverage & Markets & Limits Available + (ML20247K334)
- ML20247K336 + (ML20247K336)
- IR 05000458/1988008 + (ML20247K337)
- A07040, Submits Results of long-term Analysis Per Commitment in 880324 Response to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes + (ML20247K338)
- IR 05000331/1998007 + (ML20247K339)
- ML20247K341 + (ML20247K341)
- ML20247K342 + (ML20247K342)
- ML20247K344 + (ML20247K344)
- AECM-89-0098, Forwards Quarterly Status Rept for Quarter Ending 890331 Re Degraded Core Accident Hydrogen Control Program + (ML20247K347)
- 05000374/LER-1989-009-03, :on 890619,RCIC Steam Line Hi Flow Isolation Switch Found to Have Diaphragm Leak.Probably Caused by Torn Diaphragm.Failed Switch Sent to Vendor for Detailed Insp. New Switch Installed + (ML20247K348)
- ML20247K349 + (ML20247K349)
- ML20247K350 + (ML20247K350)
- IR 05000482/1989011 + (ML20247K351)
- ML20247K352 + (ML20247K352)
- ML20247K353 + (ML20247K353)
- ML20247K355 + (ML20247K355)
- ML20247K357 + (ML20247K357)
- ML20247K359 + (ML20247K359)
- ML20247K363 + (ML20247K363)
- ML20247K366 + (ML20247K366)
- ML20247K369 + (ML20247K369)
- ML20247K371 + (ML20247K371)
- ML20247K374 + (ML20247K374)
- ST-HL-AE-3021, Forwards Annotated FSAR Pages Necessary to Describe WRB-1 Correlation Per WCAP 8762-P-A, New Westinghouse Correlation WRB-1 for Predicting Critical Heat Flux (CHF) in Rod Bundles W/Mixing Vane Grids + (ML20247K375)
- 3F0589-21, Responds to Violations Noted in Insp Rept 50-302/89-06. Corrective Actions:Surveillance Procedures That Rely on Clearances for Valve Lineups Will Be Reviewed for Possible Weaknesses & Valve EGV-35 Opened to Correct Position + (ML20247K376)
- ML20247K377 + (ML20247K377)
- ML20247K385 + (ML20247K385)
- ML20247K387 + (ML20247K387)
- ML20247K388 + (ML20247K388)
- ML20247K391 + (ML20247K391)
- IR 05000409/1989001 + (ML20247K393)
- BECO-89-136, Application for Amend to License DPR-35,revising Tech Spec Section 3/4.9 to Incorporate Reactor Protection Sys Electrical Protection Assemblies + (ML20247K394)
- ML20247K395 + (ML20247K395)
- ML20247K397 + (ML20247K397)
- ML20247K400 + (ML20247K400)
- ML20247K403 + (ML20247K403)
- ML20247K404 + (ML20247K404)
- IR 05000160/1998201 + (ML20247K407)
- ML20247K408 + (ML20247K408)
- 05000313/LER-1989-013, :on 881025,anchor Support for Core Flood Tank (CFT) T2A Vent Line Not Seismically Qualified & Operability of CFT Could Not Be Assured.Caused by Missing Anchor Support.Anchor Support Modified + (ML20247K409)
- ML20247K411 + (ML20247K411)
- ML20247K412 + (ML20247K412)
- LIC-98-0065, Requests Termination of Reactor Operator License Held by Ja Cramer.Ja Cramer Terminated Employment W/Oppd Effective 980418 + (ML20247K413)
- ML20247K414 + (ML20247K414)
- 05000277/LER-1989-013-01, :on 890603,required Test for Diesel Generator Cardox Room Smoke Detectors Was Not Performed.Caused by Lack of Effective Method for Communicating Surveillance Test Status to Shift Manager + (ML20247K415)