ML20247K355
| ML20247K355 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/28/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dewease J LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20247K361 | List: |
| References | |
| NUDOCS 8904050232 | |
| Download: ML20247K355 (3) | |
See also: IR 05000382/1989006
Text
, _ _ _ _ _ _
.-
. - _
l
1
g
e . .
.
MR 281989
l
1
In Reply Refer To:
Docket: 50-382/89-06
)
l
Louisiana Power & Light Company
l
ATTN:
J. G. Dewease, Senior Vice President
)
Nuclear Operations
317 Baronne Street
i
P.O. Box 60340
New Orleans, Louisiana 70160
Gentlemen:
This refers to the inspection conducted by liessrs. W. F. Smith and T. R. Staker
of this office during the period February 1-28, 1989, of activities authorized
by NRC Operating License NPF-38 for Waterford Steam Electric Station, Unit 3,
and to the discussion of our findings with fir. R. P. Barkhurst and other
'
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included plant status, monthly maintenance
observation, operational safety verification, onsite followup of events,
monthly surveillance observation, and engineered safety feature walkdown.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspectors. The inspection findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
l
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
We are particularly concerned about your failure to comply with the Technical
Specification action statements associated with the inoperability of an
,
emergency diesel generator (EDG) when the supporting component cooling water
J
system for the EDG is taken out of service for maintenance. This apparent
failure to comply with your Technical Specifications will be the subject of a
meeting between you and NRC Region IV at the Region IV office. The schedule
for this meeting will be established in a separate letter,
i
Additionally, we are concerned about the incident on February 15, 1989, where
j
i
I
two of your employees operated a danger tagged valve contrary to the governing
i
procedure. This is the second instance in one month where this has occurred.
The first was identified during the maintenance team inspection conducted late
January and early February 1989.
It does not appear that you have adecuately
trained all site personnel to comply with all the provisions of the equipment
MQ
he
RIV:fRI
Ide
C:?SA
D:DR @
RIV:RI
TStaker
WSmith
DCha-herlain
LJCallan
'3 yf/85
$/4f/89
3/2f/89
$ @ /89
j
/
!
8904050232 090328
ADOCK0500g2
FDR
l
--
- _ -
_
1
>
,, .
, ,. ,.
. .
' Louisiana Power & Light Company
-2-
' tagging procedure.
Because of the serious implications associated
,
with the control of safety-related equipment, quick and effective corrective
j
action is required to prevent thie 'com recurring. Your response to the
J
I
-enclosed Notice of Violation shou *
eflect these actions for our review and
followup.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 8 of the enclosed report.
The response directed by this letter and the accompanying Notice is not :,ubject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
,
discuss them with you.
"$$$nal' Signed By:
E J. CALLAN
L. J. Callan, Director
Division of Reactor Projects
!
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-382/89-06
cc w/ enclosures:
Louisiana Power & Light Company
ATTN:
R. P. Barkhurst, Vice President
Nuclear Operations
P.O. Box B
i
Killona, Louisiana
70066
Louisiana Power & Light Company
ATTN:
N. S. Carns, Plant Manager
P.O. Box B
Killona, Louisiana
70066
i
Louisiana Power & Light Company
ATTN:
R. F. Burski, Manager
Nuclear Safety & Regulatory. Affairs
,
317 Baronne Street
i
'
P.O. Box 60340
New Orleans, Louisiana
70160
,
l
- _ - . _ _ _ _ _ - _
. .
, .
-y
,
_
..
,e
.
Louisiana Power & Light. Company
' 3-
-
Louisiana Power & Light Company:
' ATTN:
L. W. Laughlin, Site
Licensing Support Supervisor
P.O. Box B
Killona, Louisiana-
70066
Louisiana Power & Light Company
ATTN:
G. M. Davis, Manager .
..
'
Events Analysis Reporting and Response
P.O. Box B
Killona, Louisiana-
70066
Middle South Services.
ATTN: Mr. R. T. Lally
.P.O. Box 61000
New Orleans, Louisiana
70161
Louisiana Radiation Control Program Director
bcctoDMB(IE01)
bec distrib. by RIV:
,
- RR1
- R. D. Martin, RA
i
- Section Chief, DRP/A
- DRP
- RPB-DRSS
- MIS System
- Project Engineer, DRP/A
- RSTS Operator.
- RIV File
- DRS (2)
~
- D. Wigginton, NRR Project Manager (MS:
13-D-18)
Lisa Shea, RM/ALF
- w/766
l
-