Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20245C639 + (ML20245C639)
- ML20245C641 + (ML20245C641)
- ML20245C642 + (ML20245C642)
- ML20245C643 + (ML20245C643)
- IR 05000338/1989007 + (ML20245C645)
- 05000482/LER-1987-043, :on 870929,discovered That Testing of Power Range Neutron Flux Low Setpoint & Reactor Trip Sys Interlocks P-8,P-9 & P-10 Not Performed,Per Tech Spec Requirements.Caused by Procedural Deficiencies + (ML20245C646)
- ML20245C647 + (ML20245C647)
- ML20245C649 + (ML20245C649)
- IA-87-596, Discusses Actions Planned Re Rept of Comanche Peak Rept Review Group.Review Will Be Used to Establish Actions Which Will Improve Region IV Operations + (ML20245C650)
- ML20245C650 + (ML20245C650)
- ML20245C651 + (ML20245C651)
- ML20245C652 + (ML20245C652)
- ML20245C653 + (ML20245C653)
- ML20245C654 + (ML20245C654)
- ML20245C655 + (ML20245C655)
- ML20245C657 + (ML20245C657)
- 05000369/LER-1989-005-02, :on 890309,charging Pump Recirculation Valves Not Being Tested,Per Inservice Test Requirement.Caused by Inappropriate Action.Performance Personnel Submitted Rev to Inservice Test Submittal + (ML20245C658)
- ML20245C659 + (ML20245C659)
- IA-87-649, Partial Response to FOIA Request for Documents Re Plant Fire Protection.Forwards App B Documents.Apps a & B Documents Also Available in PDR & Lpdr in Plymouth,Ma + (ML20245C660)
- ML20245C660 + (ML20245C660)
- ML20245C664 + (ML20245C664)
- ML20245C665 + (ML20245C665)
- ML20245C666 + (ML20245C666)
- ML20245C667 + (ML20245C667)
- ML20245C669 + (ML20245C669)
- ML20245C670 + (ML20245C670)
- ML20245C671 + (ML20245C671)
- ML20245C673 + (ML20245C673)
- ML20245C676 + (ML20245C676)
- ML20245C677 + (ML20245C677)
- ML20245C678 + (ML20245C678)
- 05000483/LER-1989-005-01, :on 890518,ESF Safety Injection Actuation on Train a Received Due to Low Steamline Pressure Signal.Caused by Personnel Error Due to Operator Depressing Incorrect Main Control Board Button.Personnel Counseled + (ML20245C679)
- ML20245C680 + (ML20245C680)
- 05000318/LER-1989-005-01, :on 890323,discovered That Snubber Functional Test Procedure to Satisfy Tech Specs 4.7.8.1.c & D Not Adequate.Caused by Lack of Adequate Control for Procedures. Rev Proposed to Facility Instruction CCI-104 + (ML20245C681)
- ML20245C682 + (ML20245C682)
- 05000395/LER-1989-005, :on 890322,diesel Generator B auto-started During Surveillance Test of Fire Switch.Caused by Incorrect Test Procedure Due to Personnel Error.Test Group Developed to Review & Coordinate Surveillance Testing + (ML20245C683)
- ML20245C684 + (ML20245C684)
- ML20245C686 + (ML20245C686)
- ML20245C687 + (ML20245C687)
- 05000498/LER-1989-009, :on 890227,discovered That RCS Primary Sampling Sys Outside Containment Isolation Valve Not Tested for Proper Stroke Time Following Repair of Leak.Caused by Inadequate Instructions.Procedure Revised + (ML20245C688)
- ML20245C689 + (ML20245C689)
- ML20245C690 + (ML20245C690)
- ML20245C691 + (ML20245C691)
- ML20245C692 + (ML20245C692)
- ML20245C694 + (ML20245C694)
- ML20245C697 + (ML20245C697)
- ML20245C698 + (ML20245C698)
- ML20245C699 + (ML20245C699)
- ML20245C702 + (ML20245C702)
- A07884, Responds to NRC Re Violations Noted in Insp Rept 50-213/89-01.Corrective Actions:Procedure ACP 1.0-57 Revised to Require Dept Removing Equipment Labels for Maint to Return Labels to Operations Dept + (ML20245C703)
- IR 05000369/1989008 + (ML20245C704)