Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20244D780 + (ML20244D780)
- ML20244D781 + (ML20244D781)
- ML20244D783 + (ML20244D783)
- ML20244D784 + (ML20244D784)
- ML20244D789 + (ML20244D789)
- ML20244D792 + (ML20244D792)
- 05000322/LER-1989-004, :on 890314,inadvertent Reactor Bldg Closed Loop Cooling Water Isolation/Split Occurred After Tech Specs Surveillance Test on Emergency Bus 101.Caused by Inadequate Procedural Guidance.Procedure Revised + (ML20244D794)
- 05000313/LER-1989-019, :on 880517,discrepancies Identified in Piping Supports for HPI Sys Which Have Impacted Seismic Qualification.Caused by Deficiencies Resulting from 1979 Sys Mod Which Were Not Detected During Review + (ML20244D795)
- IR 05000395/1986006 + (ML20244D796)
- ML20244D797 + (ML20244D797)
- ML20244D799 + (ML20244D799)
- 05000313/LER-1988-026, :on 880706,certain Discrepancies Identified in Design Analyses & Assumptions Re Dhr/Low Pressure Injection & Core Flood Sys.Caused by Oversights by Various Design Groups Involved in Sys Design + (ML20244D800)
- ML20244D802 + (ML20244D802)
- ML20244D803 + (ML20244D803)
- ML20244D804 + (ML20244D804)
- ML20244D805 + (ML20244D805)
- ML20244D807 + (ML20244D807)
- ML20244D808 + (ML20244D808)
- ML20244D810 + (ML20244D810)
- ML20244D811 + (ML20244D811)
- ML20244D812 + (ML20244D812)
- ML20244D813 + (ML20244D813)
- ML20244D814 + (ML20244D814)
- ML20244D815 + (ML20244D815)
- ML20244D816 + (ML20244D816)
- ML20244D818 + (ML20244D818)
- ML20244D819 + (ML20244D819)
- ML20244D820 + (ML20244D820)
- ML20244D822 + (ML20244D822)
- ML20244D823 + (ML20244D823)
- ML20244D824 + (ML20244D824)
- NLS8600148, Nebraska Public Power District,1985 Annual Rept + (ML20244D826)
- ML20244D827 + (ML20244D827)
- ML20244D830 + (ML20244D830)
- ML20244D831 + (ML20244D831)
- 05000346/LER-1988-026, :on 881124,actuation of Channel 1 Steam & Feedwater Rupture Control Sys Trip Initiated Due to High Steam Generator 2 Level.Caused by Procedural Inadequacy. Plant Startup Procedure Changed + (ML20244D832)
- ML20244D833 + (ML20244D833)
- ML20244D835 + (ML20244D835)
- ML20244D836 + (ML20244D836)
- IR 05000416/1989007 + (ML20244D837)
- ML20244D839 + (ML20244D839)
- ML20244D840 + (ML20244D840)
- ML20244D842 + (ML20244D842)
- ML20244D843 + (ML20244D843)
- ML20244D845 + (ML20244D845)
- ML20244D848 + (ML20244D848)
- NUREG-0452, Amends 118 & 121 to Licenses DPR-24 & DPR-27,respectively, Changing Tech Specs by Modifying Certain Fire Protection Sections to Include Recently Installed Sys Per STS (NUREG-0452) + (ML20244D850)
- ML20244D853 + (ML20244D853)
- ML20244D854 + (ML20244D854)
- ML20244D855 + (ML20244D855)
- PNO-I-89-045, on 890613,criticality Delayed for 7 Days Due to Problems W/Mods Made to Steam Supply Valves to Emergency Feedwater Pump Turbine.State of Nh & Commonwealth of Ma Notified + (ML20244D856)