Forwards Insp Rept 99900404/86-01 on 860106-10.No Noncompliance Noted
ML20244D831
Person / Time
Issue date: 05/08/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Gallagher J
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20197B242 List:
References
REF-QA-99900404 NUDOCS 8605120482
Download: ML20244D831 (3)


Text

.

  • # ae.

3

[ o g

o UNITED STATES NUCLEAR REGULATORY COMMISSION b e wAsmNGTON, D. C. 20655 S.,

          • .e Pay 8, 1986 Decket No. 99900404/86-01 Westinghouse Electric Corporation Nuclear Technology Division ATTN: Mr. J. L. Gallagher, General Manager Post Office. Box 355 Pittsburgh, Pennsylvania 51230 Gentlemen:

'This refers to the inspection conducted by Messrs. P. D. Milano, R. Pettis, and P. Prescott of this office on January 6-10, 1986, of your facility at Monroeville, Pennsylvania and to the discussions of our findings with Mr. P. McManus and members of your staff at the conclusion of the inspection The purpose of this inspection was to review implementation of changes to the Westinghouse 10 CFR Part 21 reporting system and review the technical basis for a sample of items being evaluated by the safety review committee. Areas examined during the inspection and our findings are discussed in the enclosed report. The inspection consisted of an examination of procedures and represen-tative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, we found no instance where you failed to meet NRC requirements. However, it was found that Westinghouse was in the process of completing an evaluation of a problem identified in March 1985 with an Engineered Safeguard Actuation System (ESAS) feature to allow on-line testing of the reactor trip interlock (P-4). This could constitute an unreviewed safety question as defined in 10 CFR 50.59 if the margins nf safety as defined in the basis for any technical specification is reduced. Therefore, this evaluation will be reviewed during a future inspection. Also, in the review of other Potential Item (PI) files, it was noted that several issues of potential safety significance have remained open for long periods of time without either a final engineering evaluation being performed or a decision made whether to refer the issues to the Safety Review Committee.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Poom.

860512C4G 160508 4 PDR GAP' FMVWEST l 99900404 PDR

~ Westinghouse Electric Corporation -

2- May 8, 1986 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, f

- -W s

._ .w ~ '%

Gary GdZech, Chief

- Vendor Program Branch

! Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement i

Enclosures:

1. Appendix A-Inspection Report No. 99900404/86-01

! 2. Appendix B-Inspection Data Sheets (13 pages) l

! t i

4 f

i l

i t

y- -v. . - . , - , ...-,...-,--.---,-._-..-.,r_.,- . . . ~ - - , . - - - - - - . . , - . - ---.-f.,, . - - - . , , - . , - - - , - , - - - - - - . - - - - - - - . ,

r-5 Westinghouse Electric Corporation May 8, 1986 Should you have any questions concerning this inspection, we will be pleased to discuss them with you, i Sincerely, onginst W M Gary S.Z'Ch Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training) Center Programs Office of Inspection and Enforcement

Enclosures:

-1. Appendix A-Inspection Report No. 99900404/86-01

2. Appendix B-Inspection Data Sheets (13 pages)

DISTRIBUTION

  1. W

.VPB' Reading DQAVT Reading RVollmer HMiller JStone LParker JCraig PMilano(2)

RPettis PPrescott HThompson, NRR

  • See previous page for concurrences.

VPB:DQAVT SC/VPB:DQAVT BC/VPB:DQAVT PMilano: sam

  • JCraig* GGZech*

04/29/86 04/30/86 05/05/86

$ 601