ML20244D818

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-416/89-07 on 890218-0317.No Violations or Deviations Noted.Implementation Schedule to Correct Nomenclature Discrepancies Between Procedures & Installed Equipment Requested within 30 Days of Ltr Date
ML20244D818
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/12/1989
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cottle W
SYSTEM ENERGY RESOURCES, INC.
Shared Package
ML20244D821 List:
References
NUDOCS 8904240129
Download: ML20244D818 (2)


See also: IR 05000416/1989007

Text

.

-

__

_ - - _ _ _ - _ _ - _ _ _ _ _ _ _

'

.,

.. - . .

.

,

1

e

APR 121989

1

)

a

V

}

- Docket No. 50-416

i

License No. NPF-29

l

System Energy Resources, Inc.

E

ATTN: .Mr. W. T. Cottle, Vice President

Nuclear Operations

P. O. Box 23054

Jackson, MS 39205

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-416/89-07

This refers to the Nuclear Regulatory Commission (NRC) inspection' conducted by

H. O. Christensen on February 18 through March 17, 1989.

The inspection

included a review of activities authorized for your Grand Gulf facility.

At

the conclusion of. the inspection, the findings were discussed 'with those

members of your staff identified in the enclosed inspection report.

Areas examined during the.~ inspection are identified in the report.

Within

- these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities'in progress.

Within-the scope of the inspection, no violations or deviations were identified.

Based on the results of system walkdowns by the resident inspector as identified

in Inspection Report No. 50-416/89-04 and the enclosed report, please review

your plans .to correct the nomenclature -discrepancies between your procedures

_ ithin 30 days of the date of this letter, please

and the installed equipment.

W

provide us your schedule to correct this problem and your justification for

operation during this interim period.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by LAReyes)

Luis A. Reyes, Director

Division of Reactor Projects

Enclosure:

(See page 2)

F L

8904240129 890412

j

PDR

ADOCK O

d6

f

G

I

ZEcl

,

g _ _ _ _ _ _

_ _

q

j

i

I

.

.

.

1

'

-

.

APR 121989

?

System Energy Resources, Inc.

2

Enclosure:

NRC Inspection Report

cc w/ encl:

T. H. Cloninger, Vice President, Nuclear

Engineering and Support

C. R. Hutchinson, GGNS General Manager

J. G. Cesare Director, Nuclear Licensing

R. T. Lally, Manager of Quality Assurance

Middle South Utilities System Services, Inc.

R. B. McGehee, Esquire

Wise, Carter, Child, Steen and Caraway

N. S. Reynolds, Esquire

Bishop, Cook, Purcell & Reynolds

R. W. Jackson, Project Engineer

State of Mississippi

bcc w/ encl:

Document Control Desk

NRC Resident Inspector

DRS Technical Assistant

L. Kintner, NRR

RII

RII

RII

y

$ d^

QL

%v

LMMenos

FCantfell

DVerrelli

04/jf/89

04//p/89

04/fl/89

i

l

'

- _ - _ _ _ _ _ _ - . __