Text
.
-
__
_ - - _ _ _ - _ _ - _ _ _ _ _ _ _
'
.,
.. - . .
.
,
1
e
APR 121989
1
)
a
V
}
- Docket No. 50-416
i
License No. NPF-29
l
System Energy Resources, Inc.
E
ATTN: .Mr. W. T. Cottle, Vice President
Nuclear Operations
P. O. Box 23054
Jackson, MS 39205
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-416/89-07
This refers to the Nuclear Regulatory Commission (NRC) inspection' conducted by
H. O. Christensen on February 18 through March 17, 1989.
The inspection
included a review of activities authorized for your Grand Gulf facility.
At
the conclusion of. the inspection, the findings were discussed 'with those
members of your staff identified in the enclosed inspection report.
Areas examined during the.~ inspection are identified in the report.
Within
- these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities'in progress.
Within-the scope of the inspection, no violations or deviations were identified.
Based on the results of system walkdowns by the resident inspector as identified
in Inspection Report No. 50-416/89-04 and the enclosed report, please review
your plans .to correct the nomenclature -discrepancies between your procedures
_ ithin 30 days of the date of this letter, please
and the installed equipment.
W
provide us your schedule to correct this problem and your justification for
operation during this interim period.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by LAReyes)
Luis A. Reyes, Director
Division of Reactor Projects
Enclosure:
(See page 2)
F L
8904240129 890412
j
ADOCK O
d6
f
G
I
ZEcl
,
g _ _ _ _ _ _
_ _
q
j
i
I
.
.
.
1
'
-
.
APR 121989
?
System Energy Resources, Inc.
2
Enclosure:
NRC Inspection Report
cc w/ encl:
T. H. Cloninger, Vice President, Nuclear
Engineering and Support
C. R. Hutchinson, GGNS General Manager
J. G. Cesare Director, Nuclear Licensing
R. T. Lally, Manager of Quality Assurance
Middle South Utilities System Services, Inc.
R. B. McGehee, Esquire
Wise, Carter, Child, Steen and Caraway
N. S. Reynolds, Esquire
Bishop, Cook, Purcell & Reynolds
R. W. Jackson, Project Engineer
State of Mississippi
bcc w/ encl:
Document Control Desk
NRC Resident Inspector
DRS Technical Assistant
L. Kintner, NRR
RII
RII
RII
y
$ d^
QL
%v
LMMenos
FCantfell
DVerrelli
04/jf/89
04//p/89
04/fl/89
i
l
'
- _ - _ _ _ _ _ _ - . __