ML20244D797
| ML20244D797 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/11/1989 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8904240118 | |
| Download: ML20244D797 (1) | |
See also: IR 05000413/1989002
Text
__-_
m -
. gf.j;tCIO
APR111989
, . , g
.
Docket Nos. 50-413, 50-414
_
Duke Power Company
' ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
' Charlotte, NC 28242
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS~. 50-413/89-02 AND 50-414/89-02
In Section 4 of the report details (page 9, Paragraph 3), an' exposure limit was
erroneously stated.
The exposure limit requiring areas to be locked or
~
controlled as stated in the Technical Specifications is 1,000 millirem per hour
(mrem /hr), rather than 100 mrem /hr.
We regret any inconvenience this error may have caused you.
>
Sincerely,
Stewart D. Ebneter
Regional Administrator
cc:
T. B. Owen, Station Manager
State of South Carolina
bcc: K. N. Jabbour, NRR
NRC Resident Inspector
Document Control Desk
RI
RII
RII
RI
R
l
RIIlQ
e-m
D
o
FWright
JPotter
DColli
Stohr
h
ock MErnst
4/f,/89
4/(/89
4/4 /8
46/89
4/ 7 /89
4/////89
8904240118 890411
gDR
ADOCK 05000413
i
0
l
_ _ - _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ - _ _ _ _ - _ - _ - _ _ - _ _ _ _ _ _ _ - _ - _ . _ _ _ _ _ _ _ _ . _ _ _ _ _
_ _ _ _ _ _ _
a
_