Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- U-601068, Forwards Description of Changes to Programs in Chapter 14 to FSAR + (ML20235Z498)
- ML20235Z499 + (ML20235Z499)
- ML20235Z502 + (ML20235Z502)
- ML20235Z504 + (ML20235Z504)
- ML20235Z507 + (ML20235Z507)
- ML20235Z508 + (ML20235Z508)
- ML20235Z509 + (ML20235Z509)
- ML20235Z510 + (ML20235Z510)
- ML20235Z511 + (ML20235Z511)
- ML20235Z514 + (ML20235Z514)
- ML20235Z515 + (ML20235Z515)
- ML20235Z517 + (ML20235Z517)
- ML20235Z520 + (ML20235Z520)
- 05000382/LER-1989-004, :on 890303,personnel Noted That Essential Chiller a Experiencing Problems Maintaining Chilled Water Temp.Caused by Small Crack in Low Pressure Valve Ball Float. Unit Shut Down for Maint.Chiller a Replaced + (ML20235Z521)
- IR 05000271/1987018 + (ML20235Z522)
- ML20235Z524 + (ML20235Z524)
- 05000293/LER-1986-020, :on 860820,identified That South Wall of Switchgear Room Not Listed in Procedure 8.B.16.13.Caused by Failure to Identify Barrier Required to Meet 10CFR50,App R, in Site Surveillance Procedures.Actions Taken + (ML20235Z526)
- IR 05000423/1987017 + (ML20235Z527)
- ML20235Z529 + (ML20235Z529)
- ML20235Z531 + (ML20235Z531)
- ML20235Z532 + (ML20235Z532)
- ML20235Z535 + (ML20235Z535)
- ML20235Z539 + (ML20235Z539)
- PNO-III-87-132, on 871007,contract Worker Fainted During Work on Steam Generator B.Slight Contamination to Socks,Face & Hair Noted After Removal of Protective Clothing at Plant Prior to Transport to Hosp.Worker Decontaminated & Examined + (ML20235Z540)
- ML20235Z542 + (ML20235Z542)
- ML20235Z543 + (ML20235Z543)
- ML20235Z547 + (ML20235Z547)
- W3P89-0054, Forwards Summary of Personnel Monitoring Ending 881231 & Tech Spec 6.9.1.5 End of Yr Rept,1988 + (ML20235Z548)
- ML20235Z549 + (ML20235Z549)
- ML20235Z552 + (ML20235Z552)
- ML20235Z553 + (ML20235Z553)
- ML20235Z555 + (ML20235Z555)
- ML20235Z557 + (ML20235Z557)
- ML20235Z558 + (ML20235Z558)
- PNO-I-87-096, on 871016,plant Scrammed on High Neutron Flux from 89% Power During Testing Causing Main Steam Pressure Oscillations Triggering APRM High Flux Scram.Crd Stub Tube Leakage Identified.Hydrostatic Tests Performed + (ML20235Z560)
- 0CAN038905, Responds to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Specific Actions Requested to Be Taken Listed + (ML20235Z561)
- 0CAN038906, Responds to 890223 Request for Addl Info Re Util 881221 Submittal of Results of Latest Fire Barrier Penetration Seal Testing.Response to Request Will Be Submitted by 890424. Delay Due to Workload of Fire Protection Group + (ML20235Z563)
- 05000499/LER-1989-004-01, :on 890206,radiation Monitor on Fuel Handling Bldg (Fhb) Exhaust Air Duct Went Into High Alarm & Actuated Fhb HVAC to Filtered Exhaust Mode.Cause Unknown.Actuated & Redundant Monitor Confirmed to Be in Calibr + (ML20235Z564)
- ML20235Z565 + (ML20235Z565)
- ML20235Z566 + (ML20235Z566)
- ML20235Z571 + (ML20235Z571)
- ML20235Z574 + (ML20235Z574)
- ML20235Z578 + (ML20235Z578)
- ML20235Z581 + (ML20235Z581)
- ML20235Z583 + (ML20235Z583)
- ML20235Z584 + (ML20235Z584)
- ML20235Z585 + (ML20235Z585)
- IR 05000057/1987002 + (ML20235Z586)
- ML20235Z587 + (ML20235Z587)
- ML20235Z589 + (ML20235Z589)
- ML20235Z592 + (ML20235Z592)