Text
,r ; 3
l
,h .-.
i
.
5
.
14 OCT 1987
Docket / License:
50-423/NPF-49
<% c i
Northeast Nuclear Energy Company
ATTN:
Mr. Edward J. Mroczka
12 J
[j
Senior Vice President, Nuclear
to
Engineering and Operations
~o
'"
p A
P.O. Box 270
Hartford, Connecticut
06101-0270
w
'
4
Gentlemen:
C;>
Subject: Millstone 3 Routine Inspection 50-423/87-17 (7/11/87-9/21/8-')
This refers to the routine NRC resident safety inspection by Mr. W. J. Raymond
on July 11 - September 21, 1987 at the Millstone Nuclear Power Station, Unit 3.
j
The inspection results are described in the enclosed report and were discussed
j
with Mr. C. H. Clement of your staff.
!
I
No violations were cited during this inspection and no reply to this letter
is required.
1
Detail 6 of and Appendix I to the enclosed report notes the findings of the
Regional Administrator's tour of the Millstone site on August 17-18, 1987.
Overall, that tour r.oted generally good material condition.
4
Additionally, on September 22, 1987, Mr. Raymond provided Mr. Clement an
evaluation of licensee event report (LER) quality, Appendix II to the enclosed
report, which was used as input to NRC Region I assessment of Unit 3 LERs.
The
LER evaluation was made using the basic methodology presented in NUREG-1022,
Supplement 2.
Your cooperation with us is appreciated.
Sincerely,
cricinal Sisnod BY
i
Lee H. Bettenhausen, Chief
j
Projects Branch No. 3
j
Division of Reactor Projects
Enclosure: NRC Region I Inspection Report 50-423/87-17
8710210179 871014
ADDCK 05000423
/
,
Ol
G
g
k
OFFICIAL RECORD COPY
IR MILL 3 87-17 - 0001.0.0
11/29/80
l
s
Northeast Nuclear Energy Company
2
.
cc w/ encl:
Mr. W. D. Romberg, Vice President, Nuclear Operations
Mr. S. E. Scace, Station Superintendent
Mr. R. M. Kacich, Manager, Generation Facilities Licensing-
Mr. D. O. Nordquist, Director of Quality Services
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
bcc'w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enclosures)
DRP Section Chief
B. Ferguson, LPM, NRR
Robert J. Bores, DRSS
M. Shanbaky, DRSS
A. Shropshire
R. Summers, DRP-
o*
RI:DRP
- RI:DRP
- RI:DRP
Raymond/grm
McCabe
Bettenhausen
10/8/87
i
0FFICIAL RECORD COPY
IR MILL 3 87-17 - 0002.0.0
11/29/80
coSEE PREVIOUS CONCURRENCE
_ - _ _ _ _ _ _ _ - .
.
v
..
t
t
Northeast Nuclear Energy Company
2
14 0CT SW
cc w/ enc 1:
Mr. W. D. Romberg, Vice President, Nuclear Operations
Mr. S. E. Scace, Station Superintendent
Mr. E. R. Foster, Director, Generation Construction
Mr. R. M. Kacich, Manager, Generation Facilities Licensing
Mr. D. O. Nordquist, Director of Quality Services
Mr. V. Papadopoli, Supervisor, Engineering Assurance
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enclosures)
DRP Section Chief
B. Ferguson, LPM, NRR
Robert J. Bores, DRSS
M. Shanbaky, DRSS
A. Shropshire
R. Summers, DRP
<
RI:DRP 6,h
RI RP
NP
Raymond/grm
McCpbe
BetAenhausen
10/{/87
lol9
/Off
0FFICIAL RECORD COPY
IR MILL 3 87-17 - 0002.a.0
q
11/29/80
_ - - - - _ _ _ _ _ - - .
1