Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235U325 + (ML20235U325)
- ML20235U327 + (ML20235U327)
- ML20235U328 + (ML20235U328)
- ML20235U330 + (ML20235U330)
- ML20235U331 + (ML20235U331)
- ML20235U333 + (ML20235U333)
- ML20235U335 + (ML20235U335)
- ML20235U336 + (ML20235U336)
- ML20235U337 + (ML20235U337)
- ML20235U339 + (ML20235U339)
- ML20235U341 + (ML20235U341)
- ML20235U342 + (ML20235U342)
- ML20235U343 + (ML20235U343)
- RBG-29587, Forwards Objectives to Be Fulfilled During Facility Emergency Planning Exercise.Scenario Package Will Be Provided 45 Days Prior to Exercise Date + (ML20235U344)
- ML20235U345 + (ML20235U345)
- ML20235U349 + (ML20235U349)
- ML20235U352 + (ML20235U352)
- ML20235U353 + (ML20235U353)
- ML20235U358 + (ML20235U358)
- ML20235U361 + (ML20235U361)
- 05000482/LER-1987-020, :on 870506,control Room Ventilation Isolation Signal Occurred Due to High Chlorine Level in Outside Air Makeup.Caused by Breaking of Paper Tape Used as Chlorine Detector.Paper Tape Replaced + (ML20235U362)
- ML20235U367 + (ML20235U367)
- W3P85-1237, Updates 840913 Response to Violations Noted in Insp Rept 50-382/84-25.Corrective Actions:Ongoing Program to Verify Adequate Documentation of Decisions Re Preventive Maint Implemented at Plant + (ML20235U371)
- ML20235U372 + (ML20235U372)
- ML20235U374 + (ML20235U374)
- ML20235U376 + (ML20235U376)
- ML20235U379 + (ML20235U379)
- ML20235U381 + (ML20235U381)
- TXX-6579, Interim Deficiency Rept CP-87-22 Re Impact Testing of Matls Attached to Containment Liner.Initially Reported on 870617. Engineering Evaluation of Matls & Weld Configurations in Process.Next Rept Expected by 870831 + (ML20235U382)
- ML20235U384 + (ML20235U384)
- ML20235U387 + (ML20235U387)
- IR 05000302/1987018 + (ML20235U389)
- ML20235U390 + (ML20235U390)
- PNO-III-87-129, on 871002,facility Shut Down to Repair Packing Leaks on Both Pressurizer Spray Valves.Cause of Packing Leaks Not Stated.Valve Repairs Now Completed & Repair of Position Indicator on One Valve Underway + (ML20235U391)
- ML20235U392 + (ML20235U392)
- ML20235U393 + (ML20235U393)
- 05000313/LER-1988-015, :on 880928,increased Support Loads Identified on Two Hydraulic Snubbers HS-101 & HS-102 Attached to RCS Pressurizer Surge Line.Caused by Failure of NSSS Vendor to Include Appropriate Mass of RCS Fluid + (ML20235U394)
- ML20235U395 + (ML20235U395)
- ML20235U397 + (ML20235U397)
- ML20235U401 + (ML20235U401)
- IR 05000458/1987011 + (ML20235U403)
- RBG-30184, Forwards Supplemental Response to Notice of Violation from Insp Rept 50-458/88-09.Current Status on Util Corrective Action Taken on Item 8809-01, Assessment Aids Provided. Response Withheld (Ref 10CFR73.21) + (ML20235U404)
- ML20235U407 + (ML20235U407)
- ML20235U408 + (ML20235U408)
- ML20235U409 + (ML20235U409)
- ML20235U411 + (ML20235U411)
- ML20235U412 + (ML20235U412)
- ML20235U414 + (ML20235U414)
- AECM-87-0187, Comments on Draft NUREG-1150, Reactor Risk Ref Document. Review of Document Indicates That Ability of Facility to Cope W/Severe Accidents Underestimated Due to Conservative Assumptions + (ML20235U416)
- ML20235U417 + (ML20235U417)
- ML20235U420 + (ML20235U420)