ML20235U331
| ML20235U331 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/24/1989 |
| From: | Ernst M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| References | |
| NUDOCS 8903090150 | |
| Download: ML20235U331 (1) | |
Text
_ _-_ _ _ _ _ _ _ _
W fl FEB 2 4 su Docket No. 50-302 License No. DPR-72 Florida Power Corporation Mr. W. S. Wilgus Vice President. Nuclear Operations ATTN: Manager, Nuclear Licensing L
P. O. Box 219 Crystal River, FL 32629 Gentlemen:
SUBJECT:
DISCRETIONARY ENFORCEMENT TO ALLOW CONTINUED OPERATION WITH REACTOR COOLANT PUMP POWER MONITOR CHANNELS TECHNICAL SPECIFICATION SURVEILLANCE NOT PERFORMED This letter acknowledges your letter dated February 14, 1989, requesting discretionary enforcement associated with the performance of the surveillance required by Technical Specification 4.3.1.1.1, Reactor Coolant Pump Power Monitor Surveillance.
This request is limited to the time period orior to the next plant shutdown, presently scheduled to begin no later than February 28, 1989.
g We have reviewed your request which included discussions with your staff during the week of February 13, 1989, and the request was subsequently granted in a telephone conversation with Region II staff on February 16, 1989.
Should you have any questions concerning this letter, please contact us.
Sincerely.
Original signed by J. Philip Stohr (for) h30oj50s90pp4 P
DOCK 05000302 Malcolm L. Ernst PNU Acting Regional Administrator cc:
P. F. McKee, Director, Nuclear Plant Operations E. C. Simpson, Director, Nuclear Site Support State of Florida bec: NRC Resident Inspector DRS Technical Assistant Document Control Desk l
1
/
R RII
/
AM/b NM RLrlen ak son k2L[
7 ;4 gj JL 97 g o Sro/