BRAIDHOOD NUCLEAR P0HER STATION-l UNIT 1 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-456-LICENSE NO. NPF-72 l

1.

1 i

j 8710140078 870930

.4 PDR ADOCK 05000456i '

R PDR 3

. l

.(4957z)

B.

OPERATING DATA REPORT DOCKET NO.:

50-456 UNIT:

Braidwood 1 DATE:

10/09/87 i

COMPILED BY:

B. M. Peacock TELEPHONE:

(815)458-2801 i

ext. 2480 OPERATING STATUS 1.

Reporting Period: September, 1987 Gross Hours: 720.0 1

2.

Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120 3.

Power level to which restricted (If Any): None 4.

Reasons for restriction (If Any):

None THIS MONTH YR TO DATE CUMULATIVE J

5.

Report period Hours:

720.0 1944.0 1944.0 j

6.

Hours Reactor Critical:

458.0 1059.9 1059.9 4

7.

RX Reserve Shutdown Hours:

0.0 0.0 0.0 1

8.

Hours Generator on Line:

351.3 664.8 664.8 9.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 10.

Gross Thermal Energy (MWH):

409163 685873 685873 11.

Gross Elec. Energy (MWH):

109970 163119 163119 12.

Net Elec. Energy (MWH):

84216 106192 106192 13.

Reactor Service Factor:

N/A N/A N/A 14.

Reactor Availability Factor:

N/A N/A N/A 15.

Unit Service Factor:

N/A N/A N/A 16.

Unit Availability Factor:

N/A N/A N/A 17.

Unit Capacity Factor (MDC net):

N/A N/A N/A 18.

Unit Capacity Factor (DER net):

N/A N/A N/A 19.

Unit Forced Outage Rate:

N/A N/A N/A 20.

Unit Forced Outage Hours:

197.5 1084.0 1084.0 21.

Shutdowns Scheduled Over Next 6 Months:

November 13. 1987 - Lweek surveillance outage 22.

If Shutdown at End of Report Period, Estimated Date of Startup:

23.

Units in Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED Initial Criticality 05/23/87 05/29/87 Initial Electricity 07/11/87 07/12/87 Commercial Operation 12/29/87 (4957z)

C.

AVERAGE DAILY UNIT NET POWER LEVEL LOG DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE:

10/09/87.-

COMP 7. LED BY:

B. M. Peacock TELEPHONE:

(815)458-2801 ext. 2480 c

MONTH: September, 1987 I

1.

0 17.

170 2.

0 18.

0 3.

0 19 ~.

0 l

4.

0

'20.

196 5.

71 21.

216 6.

201 22.

252-7.

239 23.

233 8.

241 24.

0 9.

159 25.

0 10.

0

'26.

221 11.

0

-27, 309 12.

0 28.

457 13.

0 29.

486

)

14.

0 30.

481 15.

0 16.

O INSTRUCTIONS-l On this form list the average daily unit power. level _ in MWe-Net for each l

day in the reporting month.. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month.

1 Note that when maximum dependable capacity is.used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds.the 100% line (or the restricted power level line)..In such cases'the' average daily unit power output sheet'should be footnoted to explain the apparent anomaly.

l l

i (4957z)-

'I U

a EC f

k1 N

n o

e f

c0 E

o s

o R

i n

u 1

o8 c2 R

t k

o a

n d

a 0

U c

a i

C o

o7e88 C

u e

t i

o8P54 E

s l

l e T

t 6w/

42 R

n al N

a 5d9

.)

np w

d ne n

E r

)

4i0M5 T

gm o

i gD o

N a

2 O

p t2

- a/

1 t N

iu d

u i

i 0r0 8x E

sp t

l s

t P

e r0 5B1 B( e V

e u

f a

M r

o1 E

dF h

et t

C P

p-R A

S m

gu.

i C

eG

.TEYE P

)

e uhn c

rtRE OITBN Fe e

t l so x

oe R

NNA O

O Ah t

s e

i e

fetu UDDH T

(t o

y ddt M

H hnN T

EP m

S ea r

E sSe(

E LE N

mo e

rl g e

T

&n v

K IL O

et R

l eai v

S o yE e C

PE I

t o

met o

Y Fir l

O MT T

sn 5

r rss S

ttei D

O C

yo 3

t o

e rn tcneF C

A Si n

fev eo iuEs t

C o

svn mi br n)

E ra R

C nli rt itaeR V

ec aa oa hstcE I

ti U

c rVr fg xnaiL T

e si EIDL(

T af.

S i.

C win w

l g y.d nt E

ddo B

un n

as R

eoi ai r) u re R

eMt t

rR at tv O

F a

s d -

i nl n

e y0 C

.t l ea ri y

n t

H itn e

m d

rse d

xrg wr a

a amm p

oe uei oe rm o

E i eu u

rc Avs pd cadL S

ll r t

ta d

n Sre U

ibt r

cl tap nu cud A

xos a

ep ini i

D ll Sne C

urn t

l e nir as O

aa i cr A pi S

ER U(t Mi H

uuotue T

nnt ndh T

E aauoet N

M MMACRO E

N R

O A

U A

M P

/

C

/

F 1 23459 M

P N

H N

X O

C M

n E

o T

i S

A B

J P

L t

Y B

A J

K E

a S

n im R

a E

x B

0 2

E M

5 5

U A

A A

0 0

e N

/

/

/

s N

N N

7 7

n' R

8 8

e E

c L

ni oL i

D t&

O N

c H

O e

i g 7

T 4

2 5

3 3

S r

rn 8

E A

u ti 9

M E

l snn 1

R it eio as Rai N

Fe rt S

r O

T yT a r N

e S

t gr ro O

b A

H B

A G

H nrnortr I

m E

eoitosr T

e R

m l atiE C

t ptel an r

U p

5 inuurire D

e S

7 2

3 6

0 uif g e m eh E

S R

q a e e pd pt R

U 6

1 9

8 9

EMRROAOO

/

O 0

7 3

1 1

S H

1 1

ABCDEFGH N

D W

O A

  • A O

I E

A A

D R

P A YA T

E Y

F S

F F

H A

A U

P T

A RA H

A A

S T

1 9

8 3

4 A AA d

R E

0 0

1 2

2 A

A e

T O

T 9

9 9

9 9

A MA l

I P

A 0

0 0

0 0

A A

E du N

E D

7 7

7 7

7 A MA P

ed

)

U R

8 8

8 8

8 A

A Y

ce z

A UA T

rh 7

A A

oc 5

o A SA FS 9

N A

A 4

D 3

4 5

6 7

A

  • A FS

(

l i

I l

NO IT TN PE IV RE CSF EO D

NO I

T TI ND AN LO PC HCDO s

EN n

PO o

o YI t

TT i

t A

s a

&U e

S r

T g

T e

OC n

N p

NA a

E o

h M

c E

e R

v d

I l

e U

a t

O v

D a

E E

r R

f ST e

e EA n

G i

VU e

e N

l LT n

g I

e AC o

T R

VA N

e R

/

e O

y s

P t

n E

e e

e R

f c

n a

i o

E S

E L

N U

T O

A I

D N

U 1

2 E

1 j

F.

LICENSEE EVENT REPORTS The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, September 1 through September 30, 1987. This information is provided pursuant to the J

reportable occurrence reporting requirements as set forth in 10 CFR 50.73.

l l

Licensee Event

_ red 0rt s

Reoort Number Dati Title of Occurrence 87-041-00 09/03/87 Technical Specification i

Surveillance not performed when i

Unit 1 computer was inoperable.

87-042-00 09/03/87 Control Room ventilation engineered safety feature actuation signal due to spurious electrical noise from condensation in detector chambers.

87-043-00 09/07/87 Missed reactor coolant specific activity sample due to miscommunications.

87-044-00 09/04/87 Closure of RH discharge isolation valve due to inadequate operating procedure review by the shift foreman.

(49572)

i

'{

C:mmonw:alth Edison BraidwoodNuclear Power St tion Route #1, Box 84 Brdcoville, Illinois 60407 Telephono 815/458-2801 EEF/87-1484 1

4 October 9, 1987 Director, Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C.

20555 ATTN: Document Control Desk l

I Gentlemen:

Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Power Station for the period September 1 through September 30, 1987.

j Very truly yours, "l9/97 E. E. Fit atrick Station Manager j

Braidwood Nuclear Power Station-l EEF/RCB/mjv

')

(49572)

Attachments cc:

A. B. Davis, NRC, Region III i

NRC Resident Inspector Braidwood l

Gary Wright, Ill. Dept. of Nuclear Safety T. J. Maiman K. L. Graesser L. D. Butterfield Nuclear Fuel Services, PHR Plant Support

.L. Anastasia, Station Nuclear Engineering INP0 Records Center l

Performance Monitoring Group,. Tech Staff.Braidwood Station Nuclear Group, Tech Staff Braidwood Station S. Sands - USNRC J

P. L. Barnes

o

[.

I.

Monthly Report for Braidwood Unit 1 A.

Summary of Operatina'Exoerience i

1 The unit entered.the month of September-in a shutdown mode while modifications to the. Auxiliary Feedwater System were.

completed.

The turbine was synchronized to the grid on

. September 5 and power was increased to approximately 200_

1 MHe. On September 9, the unit was shutdown from outside the Control Room in accordance with startup test BwSU RC-35. The turbine was again synchronized to the grid on September 16, however,.due to an Electro-Hydraulic Control System fluid leak,.on September 18 the turbine was taken I

l off line. The unit was re-synchronized'to the grid on September 19. An unplanned reactor trip took place on September 23 due to an inadvertent unit transformer deluge signal. An over excitation of the main power transformer caused a reactor trip on September 24 prior to re-synchronization. On September'26, the unit was synchronized to the grid and power was increased to 40%.

Power was increased to 49% on September 27 and remained at that level through the end of the month.