Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235J817 + (ML20235J817)
- ML20235J819 + (ML20235J819)
- ML20235J821 + (ML20235J821)
- ML20235J822 + (ML20235J822)
- ML20235J824 + (ML20235J824)
- ML20235J825 + (ML20235J825)
- ML20235J828 + (ML20235J828)
- ST-HL-AE-2369, Second Interim Deficiency & Part 21 Rept Re Cooling of Unit 1 High Voltage Cubicle Panels for Standby Diesel Generators.Initially Reported on 870729.Util Completed Design Mod to Provide Addl Cooling.Next Rept by 871130 + (ML20235J830)
- ML20235J834 + (ML20235J834)
- ML20235J835 + (ML20235J835)
- ML20235J836 + (ML20235J836)
- 3F0987-19, Responds to Violations Noted in Insp Rept 50-302/87-19. Corrective Actions:Calibr of Reactor Protection Sys Revised to Incorporate Setpoints of 50 & 60 Psig for Main Turbine Control & Main Feedwater Control Oil Pressure,Respectively + (ML20235J837)
- ML20235J838 + (ML20235J838)
- ML20235J842 + (ML20235J842)
- ML20235J844 + (ML20235J844)
- ML20235J845 + (ML20235J845)
- ML20235J847 + (ML20235J847)
- ML20235J848 + (ML20235J848)
- ML20235J849 + (ML20235J849)
- ML20235J850 + (ML20235J850)
- ML20235J852 + (ML20235J852)
- ML20235J853 + (ML20235J853)
- ML20235J854 + (ML20235J854)
- ML20235J859 + (ML20235J859)
- ML20235J862 + (ML20235J862)
- ML20235J863 + (ML20235J863)
- ML20235J864 + (ML20235J864)
- ML20235J865 + (ML20235J865)
- 05000458/LER-1987-018, :on 870901,discovered That Two Chemical Properties of Diesel Fuel Oil Shipment to Plant Did Not Meet Acceptable Criteria,Per Tech Specs.Fuel Oil Analysis Entered Into Surveillance Test Procedure Program + (ML20235J866)
- 3F0787-04, Submits List of All Pressure Isolation Valves & Description of Periodic Tests or Other Measures Performed to Detect Leakage,Acceptance Criteria for Leakage,Operational Limits & Test Frequency,Per Generic Ltr 87-06 + (ML20235J868)
- ML20235J870 + (ML20235J870)
- PNO-V-87-062, on 870928,unit Shut Down to Repair Boron Injection Tank Leaking Pressure Relief Valve Psv 8852. Leaking Relief Valve Removed & Blank Flange Put Over Line. Plant Remains in Shutdown Status + (ML20235J872)
- ML20235J875 + (ML20235J875)
- ML20235J876 + (ML20235J876)
- ML20235J879 + (ML20235J879)
- ML20235J880 + (ML20235J880)
- ML20235J881 + (ML20235J881)
- ML20235J883 + (ML20235J883)
- ML20235J886 + (ML20235J886)
- ML20235J887 + (ML20235J887)
- ML20235J889 + (ML20235J889)
- ML20235J891 + (ML20235J891)
- ML20235J892 + (ML20235J892)
- ML20235J896 + (ML20235J896)
- ML20235J897 + (ML20235J897)
- AECM-87-0128, Application for Amend to License NPF-29,raising Standby Liquid Control Sys Pump Relief Valve Setpoint,Adding 3.0.4 Exceptions & Removing Isolation Instrumentation Operational Conditions.Fee Paid + (ML20235J902)
- ML20235J903 + (ML20235J903)
- ML20235J906 + (ML20235J906)
- ML20235J910 + (ML20235J910)
- 05000455/LER-1987-015-07, :on 870829,feedwater Isolation Actuation on Steam Generator Level high-2 Occurred.Caused by Personnel Error.Personnel counseled.Color-coding of Instruments to Prevent Error Under Investigation + (ML20235J911)
- ML20235J914 + (ML20235J914)