Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000336/LER-1997-027-02, :on 970802,unplanned Automatic Start of a EDG Occurred While Troubleshooting.Caused by Inadequate Detailed Instructions for Preparation,Review & Approval of Troubleshooting Plant.Established Adequate Measures + (ML20216C459)
- ML20216C461 + (ML20216C461)
- ML20216C463 + (ML20216C463)
- ML20216C464 + (ML20216C464)
- ML20216C466 + (ML20216C466)
- ML20216C468 + (ML20216C468)
- ML20216C470 + (ML20216C470)
- ML20216C471 + (ML20216C471)
- ML20216C472 + (ML20216C472)
- ML20216C473 + (ML20216C473)
- ML20216C476 + (ML20216C476)
- NSD-NRC-98-5663, Forwards Proprietary Rev 4 to WCAP-14776, Wcobra/Trac Osu Long-Term Cooling Final Validation Rept. Submittal Closes FSER Open Item 440.762F (Oits 6353).Proprietary Rept Withheld,Per 10CFR2.790 + (ML20216C477)
- ML20216C480 + (ML20216C480)
- TXX-6486, Provides Addl Info Re Consideration of Station Blackout. Significant Progress Made Re Resolution of USI A-44, Station Blackout, Through Efforts of NRC & Industry Initiatives.Safety Concerns of Blackout Will Be Addressed + (ML20216C481)
- ML20216C482 + (ML20216C482)
- ML20216C484 + (ML20216C484)
- ML20216C486 + (ML20216C486)
- ML20216C488 + (ML20216C488)
- ML20216C489 + (ML20216C489)
- ML20216C490 + (ML20216C490)
- IR 05000295/1997016 + (ML20216C494)
- ML20216C495 + (ML20216C495)
- IR 05000337/1987010 + (ML20216C496)
- ML20216C497 + (ML20216C497)
- ML20216C498 + (ML20216C498)
- ML20216C499 + (ML20216C499)
- ML20216C502 + (ML20216C502)
- ML20216C504 + (ML20216C504)
- ML20216C505 + (ML20216C505)
- ML20216C506 + (ML20216C506)
- ML20216C507 + (ML20216C507)
- ML20216C508 + (ML20216C508)
- IR 05000327/1997003 + (ML20216C509)
- ML20216C511 + (ML20216C511)
- ML20216C513 + (ML20216C513)
- ML20216C514 + (ML20216C514)
- IR 05000254/1997028 + (ML20216C516)
- L-98-033, Documents Commitment to Convert Bvps,Units 1 & 2 TS to Improved Std TS of NUREG-1431,as Discussed in 980212 Telcon. Conversion Process Expected to Begin in Third Quarter of 1999 + (ML20216C518)
- 05000255/LER-1998-006, :on 980305,personnel Determined That Operating Procedures Lacked Specific Guidance.Caused by Inadequate Procedures.Alarm Response Procedure 7 Was Revised + (ML20216C519)
- ML20216C521 + (ML20216C521)
- ML20216C522 + (ML20216C522)
- IR 05000412/1987035 + (ML20216C528)
- ML20216C529 + (ML20216C529)
- ML20216C530 + (ML20216C530)
- ML20216C531 + (ML20216C531)
- NSD-NRC-97-5295, Forwards Westinghouse Response to RAI 440.647 Re beyond- design-basis SG Tube Rupture Scenarios.Rai Provided by Ltr Resulted from NRC Review of Adverse Sys Interactions rept,WCAP-14477,Rev 1 + (ML20216C532)
- ML20216C533 + (ML20216C533)
- ML20216C534 + (ML20216C534)
- IR 05000263/1998004 + (ML20216C535)
- ML20216C537 + (ML20216C537)
- ML20216C538 + (ML20216C538)