ML20216C495

From kanterella
Jump to navigation Jump to search

Discusses Which Provided Basemat Monitoring Program Rept Nubmer 7 & Requested Discontinuation of 18 Month Repts.Licensee Still Required to Implement & Maintain Basemat Monitoring Program
ML20216C495
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/11/1998
From: Chandu Patel
NRC (Affiliation Not Assigned)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
TAC-M97675, NUDOCS 9803160033
Download: ML20216C495 (3)


Text

  • -

p* ' *

  • March 11, 1998 l

!' Mr. Charles M. Dugger Vice President Operations Entergy Operations, Inc.

P. O. Box B l_

Killona, LA 70066 l

SUBJECT:

REQUEST FOR PROGRAMMATIC REPORTING CHANGE REGARDING BASEMAT MONITORING PROGRAM REPORT (TAC NO. M97675)

Dear Mr. Dugger.

By letter dated December 20,1996, Waterford 3 Steam Electric Station provided Basemat Monitoring Program Report Number 7 and requested a discontinuation of the 18 month reports.

The letter stated that you would however, continue to collect and analyze data as currently being performed and that an interim Special Report would be generated if a violation of the acceptance criteria were to occur.

As required by Waterford 3 License Condition 17, any significant change to the basemat monitoring program is required to be reviewed and approved by the staff. This letter constitutes the staffs approval of your request to discontinue the 18 month reports. However, as stated in Technical Specification 6.8.4.e, you are still required to implement and maintain a basemat monitoring program.

If you have any questions regarding our response, please contact me at (301) 415-3025.

Sincerely, ORIGINAL SIGNED BY:

Chandu P. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-382 cc: See next page

  • PUBLIC PD4-1 r/f C. Patel J.Hannon C.Hawes T. Gwynn, RIV E. Adensam (EGA1) ACRS

}

M. Gamberoni

(

Document Name: WAT97675.LTR M d dr OFC PM/PD4-1, PM/PD4-1_ LA/PD4-1 hbB DiPDIV-1[ '

h NAME MGamb roni CPateh CHawkW kahl JHannon DATE 2 /24 /98 2./?J/98 1/M/98 k/ 6 3 k/98 COPY YES/NO YES/NO YES/NO YES/NO YESh "

OFFICIAL RECORD COPY 9803160033 980311 PDR ADOCK 05000302 P PDR .

IIIH llllIllljlIlli NRC Fil.E CENIER COPY

i e 4 M10 g $ UNITED STATES

. g ,j 2

NUCLEAR RE3ULATORY COMMISSION WASHINGTON, D.C. 20066-0001 o

% o 4*****s March 11, 1998 i

Mr. Charles M. Dugger Vice President Operations Entergy Operations, Inc.

P. O. Box B Killona, LA 70066

SUBJECT:

REQUEST FOR PROGRAMMATIC REPORTING CHANGE REGARDING BASEMAT MONITORING PROGRAM REPORT (TAC NO. M97675)

, Dear Mr. Dugger-By letter dated December 20,1996, Waterford 3 Steam Electric Station provided Basemat ,

Monitoring Program Report Number 7 and requested a discontinuation of the 18 month reports. l The letter stated that you would however, continue to collect and analyze data as currently being ;

performed and that an Interim Special Report would be generated if a violation of the acceptance criteria were to occur.

As required by Waterford 3 Ucense Condition 17, any significant change to the basemat monitoring program is required to be reviewed and approved by the staff. This letter constitutes the staff's approval of your request to discontinue the 14 month reports. However, as stated in Technical Specification 6.8.4.e, you are still required to implement and maintain a basemat l

monitoring program.

If you have any questions regarding our response, please contact me at (301) 415-3025.

Sincerely, l

$ fh Chandu P. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects lil/IV l Office of Nuclear Reactor Regulation Docket No. 50 382 1

cc: See next page l

l 1

i l

l i

Mr. Charles M. Dugger Entergy Operations, Inc. Waterford 3 oc:

Administrator Regional Administrator, Region IV Louisier,a Radiation Protection Division U.S. Nuclear Regulatory Commission Post Office Box 82135 611 Ryan Plaza Drive, Suite 1000 Baton Rouge, LA 70884 2135 Artington,TX 76011 Vice President, Operations Resident inspector /Waterford NPS ,

Support Post Office Box 822 l Entergy Operations, Inc. Killona, LA 70066 P. O. Box 31935 Jackson, MS 39286 Parish President Council St. Charies Parish Director P. O. Box 302 Nuclear Safety & Regulatory Affairs Hahnville, LA 70057 Entergy Operations, Inc.

P. O. Box B Executive Vice President Killona, LA 70066 and Chief Operating Officer Entergy Operations, In:.

Wise, Carter, Child & Caraway P. O. Box 31995 P. O. Box 651 Jackron, MS 39286-1995 Jackson, MS 39205 Chairman General Manager Plant Operations Louisiana Public Service Commission Entergy Operations, Inc. One American Place, Suite 1630 P. O. Box B Baton Rouge, LA 70825 1697 Killona, LA 70066 Licensing Manager Entergy Operations, Inc.

P. O. Jox B Killona, LA 70066 Winston & StrawTt  !

1400 L Street, N.W.  !

Washington, DC 20005-3502 l

l l