Forwards Insp Rept 50-263/98-04 on 980224-0414.No Violations Noted,But Concerns That Staff Did Not Aggressively Pursue Issues Until Prompted by NRC Inspectors Expressed
ML20216C521
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/08/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20216C524 List:
References
50-263-98-04, 50-263-98-4, NUDOCS 9805190300
Download: ML20216C521 (4)


See also: IR 05000263/1998004

Text

.

/parg*o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

8

n

REGION lil

!!

$

801 WARRENVILLE ROAD

LISLE, ILLINOIS 60532-4351

t3 * * * * * ,o

May 8, 1998

Mr. M. Wadley, Vice President

Nuclear Generation

Northem States Power Company

414 Nicollet Mall

Minneapolis, MN 55401

SU3 JECT:

NRC INSPECTION REPORT NO. 50-263/98004(DRP) FOR MONTICELLO

Dear Mr. Wadley:

On April 14,1998, the NRC completed an inspection at the Monticello reactor facility. The

enclosed report presents the results of that inspection. Also enclosed is a copy of the Office of

Nuclear Reactor Regulation (NRR) response, dated February 11,1997, to an NRC Region ill

Task Interface Agreement regarding acceptability of use of leak-before-break analysis for

environmental qualification of equipment in some operability evaluations at Monticelle. This

issue is discussed in Section E 8.2 of the enclosed inspection report.

l

Dudng the seven-week period covered by this inspection report, the conduct of activities at the

Monticello facility was generally characterized by safety-conscious operations and careful

radiological work controls. The preparation work performed to support the 1998 refueling outage

was effective as evidenced by the excellent coordination and execution of work to date.

However, the inspectors identified some specific weaknesses with the performance of the

engineering and maintenance staff during this inspection period. One weakness involved the

modification process in that the installation of a jumper / bypass to support replacement of a

condensate service water system relief valve was not considered in the associated

10 CFR 50.59 review for this modification. Another weakness pertained to the thoroughness of

the evaluation of a water hammer event associated with the high pressure coolant injection

system. Although the inspectors did not identify any violations of regulatory requirements in

connection with these activities, we are concemed that your staff did not aggressively pursue

these issues until prompted by NRC inspectors. We will continue to monitor the affectiveness of

your staff's assessment of these issues.

f\\

9805190300 980508

PDR

ADOCK 05000263

G

PDR

..

,

!

l

M. Wadley

-2-

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

W hr

l

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.: 50-263

License No.: DPR-22

Enclosures:

1. Inspection Report

No. 50-263/98004(DRP)

2. TaskInterface Agreement

Response dated February 11,1997

cc w/encis:

Plant Manager, Monticello

State Ucison Officer, State

of M;nnesota

l

_ _ _ _ _ _

_ _ _ _ _ - _

l

-

.

l

M. Waaley

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.: 50-263

License No.: DPR-22

Enclosures:

1.

nspection Report

No. 50-263/98004(DRP)

2.

Task Interface Agreement

Response dated February 11,1997

DOCUMENT NAME: R:\\insprpts\\pnwers\\ mon \\ mon 98004.drp

To receive a copy of this document, Indicate in the boa *C* = Copy without attachment / enclosure "E" = Copy with attachment / enclosure

  • N* = No copy

OFFICE

Rlli

&

Rlli

e

RIII

y$h

GGrant 4

NAME

Kunowski:dpqfi)

JMcB

DATE

05/9/98

N

05/9/98

05/$/98

OFFICIAL RECORD COPY

!

'

_a

,

,

.

.

M. Wadley

-3-

Distribution:

CAC (E-Mail)

Project Mgr., NRR w/encls

A. Beach w/encls

'

J. Caldwell w/encls

B. Clayton w/encls

SRI Monticello w/encls

DRP w/encls

TSS w/encls

DRS (2) w/encls

Rlli PRR w!sncis

PUBLIC IE-01 w/encls

Docket File w/encls

GREENS

,

LEO (E-Mail)

DOCDESK (E-Mail)

.

I

190033

l

l

l