Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216C194 + (ML20216C194)
- ML20216C195 + (ML20216C195)
- ML20216C198 + (ML20216C198)
- ML20216C199 + (ML20216C199)
- NPL-98-0222, Submits Clarification to SE Discussion Re Amends 173 & 177 for Plant,Units 1 & 2,respectively.Licensee Does Not Believe That Clarification Affects Acceptance Criteria for Analyses, Conclusions of SE or Acceptability of Analyses Performed + (ML20216C200)
- ML20216C201 + (ML20216C201)
- ML20216C202 + (ML20216C202)
- ML20216C204 + (ML20216C204)
- ML20216C206 + (ML20216C206)
- ML20216C208 + (ML20216C208)
- ML20216C209 + (ML20216C209)
- 05000302/LER-1998-003, :on 980211,loss of Power to Integrated Control Sys Occurred.Caused by Zener Diode Not Adequately Soldered to Printed Circuit Board Trace for Power Supply Monitor. FPC Replaced ICS Power Supply Monitor + (ML20216C211)
- ML20216C215 + (ML20216C215)
- ML20216C216 + (ML20216C216)
- RA98-708, Forwards Criticality Safety Program Update Fifth Status Rept 971001-980331 & Updated Gantt Chart,Per Agreement Contained in NRC + (ML20216C217)
- JPN-98-008, Forwards Rev 1 to Fitzpatick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy. Changes Continue to Meet Requirements of 10CFR50,App G & Do Not Affect Conclusion of Rept + (ML20216C218)
- B16595, Application for Amend to License DPR-65,incorporating Various Compliance Issues Identified in TS + (ML20216C219)
- ML20216C225 + (ML20216C225)
- B110073, Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy + (ML20216C227)
- ML20216C228 + (ML20216C228)
- ML20216C229 + (ML20216C229)
- ML20216C230 + (ML20216C230)
- ML20216C232 + (ML20216C232)
- B17197, Discusses Suppl Info to NRC Request Re Potential Discrimination at Millstone Nuclear Power Station,Units 1,2 & 3 + (ML20216C233)
- ML20216C236 + (ML20216C236)
- ML20216C237 + (ML20216C237)
- ML20216C238 + (ML20216C238)
- ML20216C239 + (ML20216C239)
- ML20216C240 + (ML20216C240)
- ML20216C241 + (ML20216C241)
- ML20216C243 + (ML20216C243)
- ML20216C244 + (ML20216C244)
- 05000336/LER-1997-014-01, :on 970415,insufficient RBCCW Flow to HPSI Was Noted.Cause Unknown.Rbccw Sys Supplies Pump Seal Cooler W/ Cw,Providing Heat Removal to Ultimate Heat Sink Via Sws + (ML20216C248)
- NSD-NRC-97-5294, Forwards Markup of TS 3.4.10 to Address Latest NRC Review Comment.Changes Will Be Reflected in Rev 7 of AP600 Ts,Being Submitted on 970902 + (ML20216C249)
- ML20216C251 + (ML20216C251)
- ML20216C252 + (ML20216C252)
- ML20216C253 + (ML20216C253)
- ML20216C254 + (ML20216C254)
- ML20216C257 + (ML20216C257)
- ML20216C258 + (ML20216C258)
- ML20216C259 + (ML20216C259)
- ML20216C260 + (ML20216C260)
- ML20216C261 + (ML20216C261)
- ML20216C262 + (ML20216C262)
- ML20216C264 + (ML20216C264)
- NSD-NRC-97-5298, Provides Addl Info & Westinghouse Positions Related to Smoke Control for AP600.App 9A of AP600 SSAR Revised to More Fully Explain Unique Features of AP600 Smoke Control on Fire Area/ Zone by Fire Area/Zone Basis + (ML20216C266)
- ML20216C268 + (ML20216C268)
- ML20216C271 + (ML20216C271)
- ML20216C272 + (ML20216C272)
- ML20216C275 + (ML20216C275)
- ML20216C276 + (ML20216C276)