Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215L837 + (ML20215L837)
- ML20215L839 + (ML20215L839)
- IR 05000213/1987012 + (ML20215L840)
- ML20215L841 + (ML20215L841)
- ML20215L842 + (ML20215L842)
- ML20215L844 + (ML20215L844)
- ML20215L846 + (ML20215L846)
- 05000219/LER-1987-020, :on 870402,daily 5% MSIV Closure Test Not Performed within Time Frame Per Tech Specs.Caused by Personnel Error During Shift Turnover.Test Completed & Shift Supervisor Counseled.Further Training Planned + (ML20215L849)
- ML20215L851 + (ML20215L851)
- ML20215L852 + (ML20215L852)
- ML20215L853 + (ML20215L853)
- ML20215L854 + (ML20215L854)
- ML20215L857 + (ML20215L857)
- ML20215L858 + (ML20215L858)
- ML20215L860 + (ML20215L860)
- ML20215L861 + (ML20215L861)
- ML20215L863 + (ML20215L863)
- ML20215L865 + (ML20215L865)
- ML20215L866 + (ML20215L866)
- ML20215L869 + (ML20215L869)
- ML20215L870 + (ML20215L870)
- ML20215L871 + (ML20215L871)
- ML20215L872 + (ML20215L872)
- ML20215L874 + (ML20215L874)
- ML20215L876 + (ML20215L876)
- ML20215L877 + (ML20215L877)
- ML20215L878 + (ML20215L878)
- ML20215L881 + (ML20215L881)
- ML20215L882 + (ML20215L882)
- ML20215L885 + (ML20215L885)
- 05000285/LER-1987-010, :on 870408,discovered Surveillance Tests Not Containing Steps to Verify Stroke Test Requirements of ASME Section Xi,Subsection IWV-3522.b for Valves FW-173 & FW-174. Revs Made to Operating Instructions + (ML20215L886)
- ML20215L887 + (ML20215L887)
- ML20215L888 + (ML20215L888)
- 05000454/LER-1987-012-02, :on 870408,contract Maint Crew Stroked RHR HX Component Cooling Water Outlet Isolation Valve,Causing Surge Tank to Reach Low Level CC Pump Trip.Caused by Communication Breakdown Between Maint Crew & Shift Personnel + (ML20215L889)
- ML20215L890 + (ML20215L890)
- ML20215L891 + (ML20215L891)
- ML20215L892 + (ML20215L892)
- 05000267/LER-1987-010, :on 870402 & 03,reactor Scram Circuitry Actuated Three Times on Wide Range Channels III & V Neutron Flux Rate of Change High.Caused by Susceptibility of Channels to Electrical Noise + (ML20215L894)
- ML20215L896 + (ML20215L896)
- ML20215L897 + (ML20215L897)
- ML20215L898 + (ML20215L898)
- 05000341/LER-1987-012, :on 870410,HPCI & RCIC Declared Inoperable Due to Blown Fuse.Caused by Failed Fixed Capacitor C-25 in Isolation Instrumentation.Hpci & RCIC Restored + (ML20215L903)
- ML20215L904 + (ML20215L904)
- IR 05000400/1987017 + (ML20215L905)
- ML20215L907 + (ML20215L907)
- ML20215L908 + (ML20215L908)
- ML20215L910 + (ML20215L910)
- ML20215L913 + (ML20215L913)
- ML20215L914 + (ML20215L914)
- ML20215L915 + (ML20215L915)
- ML20215L918 + (ML20215L918)