ML20215L865
| ML20215L865 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/06/1987 |
| From: | Johnston W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Gallagher J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20215L867 | List: |
| References | |
| NUDOCS 8705120405 | |
| Download: ML20215L865 (2) | |
See also: IR 05000277/1987011
Text
.
.
_
_
_.
.
_
_
..
m._
- .;
.-
MAY 0 6 W
Docket Nos. 50-277
License Nos. OPR-45
50-278
Philadelphia Electric Company-
,
ATTN:
Mr'. J. W. Gallagher
Vice President
Nuclear Operations
'
2301 Market-Street
Philadelphia, Pennsylvania
19101
Gentlemen:
,
Subject:
Inspection Report Nos. 50-277/87-11 and 50-278/87-11
^
This refers to the special safety inspection conducted by Messrs. A. Krasopoulos
and S. Pullani of this office on April 9,1987 at the Philadelphia Electric
Company Headquarters of activities authorized by NRC License Nos. OPR-45 and-
OPR-56 and to the discussions of our findings held by Mr. A. Krasopoulos with
Mr. W. Boyer of your staff at the conclusion of-the inspection. -The inspection
was conducted to review, and determine the status of, numerous examples of a
violation of fire protection _ requirements (10 CFR 50, Appendix R)' identified by
your staff during a confirmatory review of the Fire Protection Program. This
review was committed to in _ Confirmatory Action Letter 86-07 dated April 11,
-1986 following a previous NRC inspection of the fire protection program .
(Reference:
Inspection Nos. 50-277/86-08; 50-278/86-08).
The examples identified
by your. staff were described in your letters' dated May 22, 1986, September 17, 1986
and October 31, 1986.
During the inspection, the inspector evaluated the circumstances associated
with five of the examples.
Based on this review, the NRC has determined that
you do not currently satisfy all of the applicable requirements of'10 CFR 50
i
Appendix R.
We are considering the violation for appropriate enforcement
action and will schedule an enforcement conference with you to discuss the
examples of the violation, their causes and your corrective actions.
(
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely,
j
8705120405 870506
gDR
ADOCK 05000277
Original SisacW
'
William V. Johnston, Acting Director
'
Division of Reactor Safety
Enclosure: Combined NRC Region I Inspection Report
'
Nos. 50-277/87-11 and 50-278/87-11
l
OFFICIAL RECORD COPY
CIR PB 87-11 - 0001.0.0
,
'
04/30/87
,
.-
- - - . - -
. . -
-
.
. .
-.
-
.-.
---
- . - .
- - - ,
'
-,
Philadelphia Electric Company
2.
cc w/ enc 1:
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station
John S.-Kemper, Senior Vice President, Engineering and Production
Troy 8. Conner, Jr., Esquire
W. H. Hirst, Director, Joint Generation Projects Department,
Atlantic Electric
G. Leitch, Nuclear Generation Manager
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis,. Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
Robert J. Bores, DRSS
.
,
RI:jRS
clof
c o
n
RI:DRS
N
RI:DRS
M"I
4 'eds
Krasopoulos/ms
Anderson
Durr
Tfl f $b
Al
(
4/?o/87 W
f/$/87
M /87
0FFICIAL RECORD COPY
CIR PB 87-11 - 0002.0.0
04/30/87