Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215E974 + (ML20215E974)
- ML20215E976 + (ML20215E976)
- ML20215E977 + (ML20215E977)
- ML20215E978 + (ML20215E978)
- ML20215E979 + (ML20215E979)
- PNO-V-86-070, on 861004,discovered Two Snubbers on Charging Sys Mistakenly Removed.Charging Sys Required by Tech Specs for Refueling Boration Flow Path.Snubbers Reinstalled within Hour of Discovery + (ML20215E980)
- TXX-6007, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 860917.Const of New Ceiling Scheduled for Completion by 861101.Next Rept Anticipated by 861114 + (ML20215E982)
- ML20215E984 + (ML20215E984)
- ML20215E986 + (ML20215E986)
- ML20215E988 + (ML20215E988)
- ML20215E989 + (ML20215E989)
- ML20215E991 + (ML20215E991)
- IR 05000424/1986109 + (ML20215E992)
- ML20215E993 + (ML20215E993)
- ML20215E994 + (ML20215E994)
- 05000352/LER-1986-042, :on 860814,Surveillance Test ST-6-095-450-1 Contained Two Errors,Indicating Availability of Power Throughout Period.Caused by Personnel Error.Test Revised & Administrative Controls Reviewed + (ML20215E995)
- ML20215E998 + (ML20215E998)
- ML20215E999 + (ML20215E999)
- ML20215F002 + (ML20215F002)
- ML20215F003 + (ML20215F003)
- ML20215F004 + (ML20215F004)
- ML20215F005 + (ML20215F005)
- ML20215F006 + (ML20215F006)
- ML20215F007 + (ML20215F007)
- ML20215F009 + (ML20215F009)
- ML20215F010 + (ML20215F010)
- ML20215F011 + (ML20215F011)
- ML20215F013 + (ML20215F013)
- ML20215F014 + (ML20215F014)
- ML20215F015 + (ML20215F015)
- ML20215F016 + (ML20215F016)
- ML20215F017 + (ML20215F017)
- ML20215F020 + (ML20215F020)
- ML20215F021 + (ML20215F021)
- ML20215F025 + (ML20215F025)
- ML20215F027 + (ML20215F027)
- ML20215F029 + (ML20215F029)
- ML20215F030 + (ML20215F030)
- 05000338/LER-1986-017-01, :on 860910,single Train ECCS Actuation from lo- Lo Pressurizer Pressure Signal Occurred.Caused by Personnel Error During Performance of Solid State Protection Sys Test. Evaluation Continuing + (ML20215F031)
- 05000295/LER-1986-033-01, :on 860910 & 11,pressurizer Steam Temp of More than 320 F Greater than Pressurizer Spray Temp Discovered. Caused by Inadequate Operating Procedure.Pressurizer Cooled. Procedures & Operator Training Changed + (ML20215F033)
- AECM-87-0120, Forwards Evidence That Util Can Generate Cash Flow Which Would Be Available for Payment of 90% of Deferred Premium Obligation for Facility.Util Also Encl Evidence That South Mississippi Electric Power Assoc Can Pay Remaining 10% + (ML20215F035)
- ML20215F036 + (ML20215F036)
- ML20215F037 + (ML20215F037)
- ML20215F039 + (ML20215F039)
- ML20215F041 + (ML20215F041)
- ML20215F042 + (ML20215F042)
- ML20215F043 + (ML20215F043)
- ML20215F044 + (ML20215F044)
- ML20215F047 + (ML20215F047)
- ML20215F048 + (ML20215F048)
- 3F0687-10, Notifies of Permanent Reassignment of Sf Harmon from Position for Which Util Certified Need for Licensed Operator or Senior Operator to Position Not Requiring Continued Maint of License,Effective 870316 + (ML20215F051)