JUN 151987
Docket No. 50-309
l
Maine Yankee Atomic Power Company
ATTN:
Mr. J. B. Randazza
Vice President
Nuclear Operations
83 Edison Drive
Augusta, Maine 04336
Gentlemen:
Subject:
EQUIPMENT QUALIFICATION INSPECTION OF MAINE YANKEE NUCLEAR
POWER STATION (INSPECTION NO. 50-309/87-16)
This letter confirms the dates of July 20 - 24, 1987 for the NRC equipment
qualification (EQ) inspection for Maine Yankee Nuclear Power Station.
These
dates were established during a previous telephone conversation with
Mr. Douglas Whittier on June 9, 1987 by Mr. Leonard Cheung of this office.
The
inspection will take place at the plant site.
A management entrance meeting is scheduled for 1:00 p.m. on July 20, 1987 with
a management exit meeting tentatively scheduled for 9:00 a.m. on June 24, 1987
at the plant site. A plant walkdown inspection of specific EQ equipment is
planned for Wednesday, July 22, 1987.
The inspection will include the following:
1.
Review of your implementation of 10 CFR 50.49 EQ program, including
preservation of qualified status of equipment.
2.
Review of your implementation of Technical Evaluation Reprt/ Safety
Evaluation Report EQ corrective action commitments.
3.
Review of EQ documentation files.
4.
Physical inspection of equipment from the Master List.
At least one week prior to the inspection we will require one copy of each
document identified in attachment 1 with a plus (+) mark.
A duplicate copy is to be sent to:
Uldis Potapovs, Chief
Equipment Qualification Inspectior. Section
EW/S 312A
U.S. Nuclear Regulatory Commission
20555
8706220198 870615
ADOCK 05000309
i{
G
.
_.
.
Maine Yankee Atomic Power Company
2
-
Your cooperation with us during this inspection will be appreciated.
Should
you have any questions regarding this inspection, please contact either
Mr. Leondard Cheung (215-337-5296) or Mr. C. Anderson at (215)337-5376 of
this office.
Sincerely,
Drigiant signed By:
JacqueP,Durr
William V. Johnston
Acting Director
Division of Reactor Safe
Attachment: As Stated
cc w/ encl:
C. E. Monty, President
C. D. Frizzle, Assistant Vice President / Manager of Operations
J. H. Garrity, Plant Manager
.P. L. Anderson, Project Manager
G. D. Whittier, Licensing Section Head
J. A. Ritsher, Attorney (Ropes and Gray)
Phillip Ahrens, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
,
NRC Resident Inspector
i
State of Maine
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
M. McBride, RI, Pilgrim
H. Eichenholz, SRI, Yankee
P. Sears, LPM, NRR
Robert J. Bores, DRSS
C G
h
RI:DRS
RI:D S
RI:DRS
Cheung/cgl
Anderson
D rr
W
//
(o n SY
Gl<//'27
I
b/I/51
l
OFFICIAL RECORD COPY
CHEUNG6/11/87 - 0002.0.0
06/11/87
i
L
h
-
t
O'
ATTACHMENT 1
REFERENCES
3.
+ Licensee's overall EQ Program
2.
+NRC Safety Evaluation Reports concerning environmental qualification
of safety-related electrical equipment, including the SER that
forwarded the TER to each licensee.
3.
+ Licensee's commitments for corrective action including May 1983 SER/TER
response,1984 minutes of meeting with NRC, and subsequent changes.
4.
+a. Licensee's list of equipment requiring environmental qualification
(Master List, submitted in May 1983).
+b. Master List, version in effect at time of inspection.
5.
+a.
Generic Letter 84-24, D.G. Eisenhut to Licensee's and Applications,
dated December 27, 1984, Subject:
Certification of Compliance to 10 CFR 50.49.
+b.
Licensee's response to Generic Letter 84-24.
6.
+ Licensee's current System Component Evaluation Worksheets (SCEW sheets)
or equivalent (earlier SCEW sheets may have been included in previous
licensee submittals).
7.
+ Licensee's procedures applicable to equipment qualification (EQ
program, procurement of qualified equipment, maintenance of qualified
equipment, modifications to EQ equipment, EQ personnel training (site
and corporate personnel), QA/EQ interface including corporate QA, Site
QA/QC audits, EQ spare parts procurement and licensee program for EQ
related NRC Information Notices / Bulletins.
8.
- Licensee's qualification documentation and/or files.
- These documents must be available for the inspectors use throughout
the inspection.
+These documents are requested for review before the inspection.