Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-2701, Monthly Operating Rept for Jul 1986 + (ML20215C571)
- ML20215C573 + (ML20215C573)
- ML20215C576 + (ML20215C576)
- ML20215C577 + (ML20215C577)
- ML20215C579 + (ML20215C579)
- ML20215C582 + (ML20215C582)
- ML20215C583 + (ML20215C583)
- ML20215C584 + (ML20215C584)
- ML20215C586 + (ML20215C586)
- ML20215C588 + (ML20215C588)
- TXX-6146, Interim Deficiency Rept CP-86-53 Re Seismic Design of Conduit.Initially Reported on 861021.Testing Program Schedule Delayed.Next Rept Expected by 870220 + (ML20215C589)
- ML20215C590 + (ML20215C590)
- IR 05000250/1986037 + (ML20215C591)
- ML20215C592 + (ML20215C592)
- PNO-III-86-143, on 861209,plant Shut Down Due to Discovery That 200 AMP Electrical Splices Supplied by GE May Not Meet Environ Qualification Requirements.Special Region III Insp Will Review Splice Problem & Licensee Corrective Action + (ML20215C593)
- ML20215C596 + (ML20215C596)
- ML20215C597 + (ML20215C597)
- ML20215C601 + (ML20215C601)
- ML20215C605 + (ML20215C605)
- ML20215C606 + (ML20215C606)
- ML20215C607 + (ML20215C607)
- ML20215C608 + (ML20215C608)
- ML20215C611 + (ML20215C611)
- ML20215C612 + (ML20215C612)
- ML20215C613 + (ML20215C613)
- ML20215C614 + (ML20215C614)
- ML20215C615 + (ML20215C615)
- ML20215C616 + (ML20215C616)
- ML20215C620 + (ML20215C620)
- ML20215C621 + (ML20215C621)
- ML20215C623 + (ML20215C623)
- ML20215C624 + (ML20215C624)
- IA-86-367, Partially Withheld Affirmative Adjudicatory Issue Re CBS 850324 Broadcast of 60 Minutes on Const of Shoreham + (ML20215C626)
- ML20215C626 + (ML20215C626)
- ML20215C627 + (ML20215C627)
- ML20215C628 + (ML20215C628)
- ML20215C629 + (ML20215C629)
- ML20215C630 + (ML20215C630)
- TXX-5036, Interim Deficiency Rept CP-86-11 Re Component Cooling Water Pump Impeller Linear Indications.Initially Reported on 860623.Requisition for Offsite Repair of Replacement Spare Impeller Being Processed.Next Rept Anticipated by 861205 + (ML20215C633)
- ST-HL-AE-1840, Responds to Questions Re Review of Component Cooling Water Pump Logic Diagrams.Operator Action Based on Existing Alarms Has Been Determined to Be Adequate for Both Equipment Protection & Plant Safety.One Oversize Drawing Encl + (ML20215C634)
- ML20215C635 + (ML20215C635)
- ML20215C638 + (ML20215C638)
- ML20215C639 + (ML20215C639)
- ML20215C640 + (ML20215C640)
- ML20215C641 + (ML20215C641)
- ML20215C642 + (ML20215C642)
- ML20215C644 + (ML20215C644)
- ML20215C645 + (ML20215C645)
- ML20215C646 + (ML20215C646)
- 05000344/LER-1987-010, :on 870511,power to 230-kV Bus V-82 Lost Due to Inadvertent Actuation of Bus Differential Relays.Caused by Failure of Meter & Relaying Technicians to Bypass Bus Differential Relays.Power Restored + (ML20215C647)
- ML20215C650 + (ML20215C650)