Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215B807 + (ML20215B807)
- ML20215B808 + (ML20215B808)
- 05000344/LER-1987-011, :on 870501,excessive Leakage Detected from Penetration E-107 During Check of Penetrations E-112 & E-115.Caused by Leakage Past Electrical Penetration Conductor Seals & Seal Displacement Due to Age + (ML20215B809)
- A06097, Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps + (ML20215B810)
- NRC-87-3229, Informs of Completion of Preliminary Design & Engineering of Advanced Pwr.Westinghouse Currently Working on Final Design & Engineering Efforts & Encouraged That Issuance of Preliminary Design Approval Will Be Achieved in Early 1988 + (ML20215B813)
- ML20215B814 + (ML20215B814)
- IA-86-454, Submits Update of 860408 Schedule for Remaining Work Needed on Sser 13 for Comanche Peak Program Plan.Related Info Encl + (ML20215B816)
- ML20215B816 + (ML20215B816)
- 05000278/LER-1986-024-01, :on 861108,partial Group V Primary Containment Isolation Occurred During Testing of RCIC Sys Steam Tunnel Temp Switch.Caused by Loose Wire Connection.Wire Tightened + (ML20215B818)
- ML20215B819 + (ML20215B819)
- ML20215B820 + (ML20215B820)
- ML20215B821 + (ML20215B821)
- ST-HL-AE-2206, Forwards Annotated Revs to FSAR App 3.6.A, Isolation Valve Cubicle Subcompartment Analysis. Rev Due to Calculation Results Showing That Some High Energy Line Break Effects Worse than Main Steam Line Break.Rev Will Be in FSAR Amend + (ML20215B824)
- ML20215B827 + (ML20215B827)
- ML20215B828 + (ML20215B828)
- IA-87-292, Purchase Order DR87-0759 & Printed Notices of Intention to Lease Option to Purchase ADP Equipment + (ML20215B830)
- ML20215B830 + (ML20215B830)
- ML20215B831 + (ML20215B831)
- IR 05000254/1986017 + (ML20215B833)
- 05000322/LER-1987-015, :on 870515,unplanned Initiation of Control Room Air Conditioning B Train Occurred Due to Low Reactor Bldg Differential Pressure.Caused by Failed Interlock Switch. Switch Indicating Door Position Repaired + (ML20215B834)
- ML20215B835 + (ML20215B835)
- ML20215B842 + (ML20215B842)
- 05000528/LER-1986-055, :on 861106,Surveillance Test 36ST-9SA02 Identified as Incomplete,Per Tech Spec 4.0.2.Caused by Inability to Position Control Room Intake Damper Due to Actuator Malfunction.Actuator Adjusted + (ML20215B843)
- ST-HL-AE-2257, Forwards Revised FSAR Figures 12.3.1-1 Through 12.3.1-4 Re Radiation Zones for Reactor Containment Bldg Elevations.As Result of Bechtel Reanalysis,Area 308 SW Could Become Radiation Zone 5 After Lifting of Pressurizer Relief Valve + (ML20215B844)
- ML20215B845 + (ML20215B845)
- ML20215B846 + (ML20215B846)
- ML20215B847 + (ML20215B847)
- 05000483/LER-1986-038, :on 861107,containment Purge Isolation Signal & Control Room Ventilation Isolation Occurred Due to Increased Gaseous Radioactivity Levels in Containment.Caused by Unanticipated Leakage from Pressurizer PORV Block Valve + (ML20215B850)
- ML20215B851 + (ML20215B851)
- ML20215B852 + (ML20215B852)
- ML20215B854 + (ML20215B854)
- SNRC-1281, Advises of Formation of New Ofc for Training on 860401.Ofc Will Provide Training for Operators,Mechanics,Technicians & Prof & Mgt Personnel That Staff Nuclear & Fossil Plants. Organizational Chart & Functional Responsibilities Encl + (ML20215B856)
- 05000249/LER-1986-021-06, :on 861110,w/unit in Run Mode,Reactor Scram Occurred Due to Loss of Control Air to Msivs.Caused by Mechanic Inadvertently Removing Power Lead.Mechanic Reprimanded & Tailgate Conducted + (ML20215B858)
- ML20215B859 + (ML20215B859)
- IR 05000293/1986038 + (ML20215B861)
- ST-HL-AE-2239, Requests Rev of Sser 3,Page 8-2,to Reflect Actual Program Performed to Address Raychem Splice Issue.Termination Ends Required to Perform Function of Providing Electrical Insulation,Not Environ Seal + (ML20215B863)
- ML20215B865 + (ML20215B865)
- 05000416/LER-1987-008, :on 870511,LPCI/RHR a Subsystem Quarterly Surveillance for RHR Pump a Performed at Differential Pressure Not Meeting Tech Spec Acceptance Criteria.Caused by Personnel Error.Surveillance Reperformed + (ML20215B868)
- ML20215B872 + (ML20215B872)
- IR 05000424/1986113 + (ML20215B873)
- ST-HL-AE-2248, Forwards Annotated Rev to FSAR Table 3.12-1, Reg Guide Matrix, Incorporating Editorial Corrections Re Reg Guides 1.61 & 1.62.Rev Will Be Included in FSAR Amend 61 + (ML20215B874)
- IA-86-272, Discusses 851113-14 Audit of Comanche Peak Response Team Const Evaluation Program in Area Re Piping & Pipe Supports. Three Unresolved Items Listed + (ML20215B876)
- ML20215B876 + (ML20215B876)
- ML20215B877 + (ML20215B877)
- ML20215B878 + (ML20215B878)
- ML20215B879 + (ML20215B879)
- ML20215B882 + (ML20215B882)
- W3P87-1096, Responds to Generic Ltr 87-06 Re Measures to Assure Integrity of Pressure Isolation Valves (Pivs) as Independent Barriers for Rcpb.Pivs Separating RCS from Attached Low Pressure Sys Listed in Tech Spec Table 3.4-1 + (ML20215B883)
- IR 05000266/1987009 + (ML20215B885)
- ML20215B887 + (ML20215B887)
- 05000410/LER-1986-003-01, :on 861108,partial Loss of Secondary Containment Isolation Actuation Instrumentation Occurred. Caused by Personnel Error.Training Mod Recommendation Initiated + (ML20215B888)