Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214P544 + (ML20214P544)
- ML20214P545 + (ML20214P545)
- PNO-II-86-089, on 861121 & 22,plant Taken Out of Svc to Replace Letdown Sys Trains.On 861121,cooler a Determined to Be Leaking When Radiation Monitor Alarmed When Preparing for Startup.On 861122,RCS Leak Rate Exceeded Tech Spec Limits + (ML20214P546)
- ML20214P548 + (ML20214P548)
- ML20214P549 + (ML20214P549)
- ML20214P551 + (ML20214P551)
- ML20214P556 + (ML20214P556)
- ST-HL-AE-2201, Second Interim Deficiency Rept Re Failure of Reactor Vessel Temporary Full Flow Filters.Initially Reported on 870406. Detailed Insp of Reactor Coolant & Interfacing Sys for Failed Screen Matl in Progress.Next Rept Provided by 870612 + (ML20214P557)
- 05000296/LER-1986-011-03, :on 861023,plant Electrician Discovered LPCI Motor Generator (MG) 3DA Uncoupled.Caused by Inadequate Procedural Detail & Acceptance Criteria in Plant Maint Instructions.Lpci MG Set Recoupled + (ML20214P559)
- ML20214P560 + (ML20214P560)
- ML20214P562 + (ML20214P562)
- ML20214P564 + (ML20214P564)
- ML20214P567 + (ML20214P567)
- ML20214P568 + (ML20214P568)
- ML20214P569 + (ML20214P569)
- ML20214P571 + (ML20214P571)
- RBG-24817, Special Rept:On 861017,valid Failure Occurred on Div II Diesel Generator While Performing Surveillance Testing. Caused by Water in Governor Cooler Return Line.Governor Drained,Flushed & Refilled + (ML20214P572)
- ML20214P573 + (ML20214P573)
- ML20214P574 + (ML20214P574)
- ML20214P575 + (ML20214P575)
- ML20214P577 + (ML20214P577)
- ML20214P580 + (ML20214P580)
- ML20214P581 + (ML20214P581)
- ML20214P582 + (ML20214P582)
- ML20214P585 + (ML20214P585)
- ML20214P587 + (ML20214P587)
- DCL-86-334, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Problem Does Not Exist at Facilities.Eccs Composite Drawing Encl + (ML20214P589)
- 05000443/LER-1987-014, :on 870429,vital Bus E6 Tripped,Resulting in Starting & Loading of Diesel Generator 1B.Caused by Deficiency in Procedure Used to Measure Relay Response Time. Procedure Revised + (ML20214P590)
- ML20214P591 + (ML20214P591)
- ML20214P595 + (ML20214P595)
- ML20214P597 + (ML20214P597)
- ML20214P598 + (ML20214P598)
- ML20214P599 + (ML20214P599)
- ML20214P600 + (ML20214P600)
- 05000325/LER-1986-021, :on 860819,automatic Scram Occurred Due to Main Turbine Trip/Stop Valve Fast Closure from Main Turbine Master Trip Signal.Caused by Electrical Grounding of Dc Power Supply of Limit Switch + (ML20214P601)
- ML20214P602 + (ML20214P602)
- ML20214P606 + (ML20214P606)
- 05000275/LER-1986-016-01, :on 861027,fiberscope Insp Revealed That Retainer Nut That Attaches Check Valve Disc to Tail Link Loose or Missing on Two of Four Check Valves.Caused by Poor Mfg Design.Design Change Implemented + (ML20214P608)
- ML20214P609 + (ML20214P609)
- 05000244/LER-1986-006, :on 860816,boric Acid Transfer Pump Inoperable. Caused by Valve V-331 Misalignment.Valves V-331 & V-345 on Transfer Pumps a & B Locked Open.Technician Reminded to Receive Permission + (ML20214P610)
- ML20214P612 + (ML20214P612)
- B12530, Application for Amend to License DPR-21,revising Tech Specs 3.4,4.4 & Associated Bases to Comply W/Atws Rule (10CFR50.62) That Requires All BWRs to Have Standby Liquid Control Sys W/Min Flow Capacity.Fee Paid + (ML20214P614)
- IA-86-687, Forwards SER Re Licensee 860917 & 19 Ltrs Proposing one-time Change to Tech Specs,Removing Operability Requirements from Automatic Isolation Valve in 3/4 Line That Bypasses RCIC Inboard Isolation Valve.Salp Input Also Encl + (ML20214P615)
- ML20214P615 + (ML20214P615)
- ML20214P616 + (ML20214P616)
- ML20214P619 + (ML20214P619)
- ML20214P621 + (ML20214P621)
- TXX-5011, Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy.Initially Reported on 860814.Review of Calculations for Acceptability of Existing Design Gap Scheduled for Completion by 861031.Next Rept Expected by 861121 + (ML20214P622)
- ML20214P623 + (ML20214P623)
- ML20214P625 + (ML20214P625)
- ML20214P626 + (ML20214P626)