Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214P442 + (ML20214P442)
- ML20214P444 + (ML20214P444)
- ML20214P449 + (ML20214P449)
- ML20214P451 + (ML20214P451)
- ML20214P452 + (ML20214P452)
- ML20214P453 + (ML20214P453)
- ML20214P454 + (ML20214P454)
- ML20214P456 + (ML20214P456)
- ML20214P457 + (ML20214P457)
- ST-HL-AE-2166, Forwards Addl Info Re Mods Being Employed for Fire Barriers in Which Seismic Gap Filler Matl (Rotofoam) Installed,Per 870330-0403 App R Fire Protection Audit + (ML20214P458)
- ML20214P459 + (ML20214P459)
- ST-HL-AE-2209, Forwards Revised FSAR Sections 9.5.5 & 9.5.6 Indicating That Ac Motor Driven Jacket Water Standby Pump Automatically Starts on Low Water Pressure & Traps Provided in Air Receiver Drains If Needed,Respectively + (ML20214P461)
- ML20214P463 + (ML20214P463)
- ML20214P464 + (ML20214P464)
- ML20214P465 + (ML20214P465)
- ML20214P468 + (ML20214P468)
- ML20214P472 + (ML20214P472)
- ML20214P473 + (ML20214P473)
- ML20214P474 + (ML20214P474)
- ML20214P475 + (ML20214P475)
- ML20214P476 + (ML20214P476)
- ML20214P477 + (ML20214P477)
- ML20214P479 + (ML20214P479)
- ML20214P482 + (ML20214P482)
- ML20214P483 + (ML20214P483)
- ML20214P484 + (ML20214P484)
- ML20214P485 + (ML20214P485)
- ML20214P488 + (ML20214P488)
- ML20214P489 + (ML20214P489)
- IR 05000456/1986050 + (ML20214P491)
- ML20214P492 + (ML20214P492)
- 05000285/LER-1987-011, :on 870428,ventilation Isolation Actuation Sys (Vias) Actuated During Clutch Power Supply Swap.Cause Under Investigation.Pressurizer Pressure Low Signal Relocked & Safety Injection Actuation Signal & Vias Reset + (ML20214P493)
- ML20214P494 + (ML20214P494)
- ST-HL-AE-2195, Forwards Annotated Pages to Plant Fhar Documenting & Justifying App R Section III.G.2.a Deviation for Separation of Fire Areas 2 & 17.Deviation Will Be Incorporated in Future Amend to Fhar + (ML20214P496)
- ML20214P501 + (ML20214P501)
- ML20214P502 + (ML20214P502)
- ML20214P503 + (ML20214P503)
- ML20214P504 + (ML20214P504)
- ST-HL-AE-2196, Forwards Revised FSAR Section 3.6.1.1(9), Design Bases..., Allowing for Use of Analytical Methods to Evaluate Capability of Impacted Piping to Withstand Whip Impact W/O Rupture + (ML20214P505)
- TXX-5034, Forwards S&W, Comanche Peak Project Procedures (Cppp), Including Project Memo,Except CPPP-7 Which Was Transmitted on 860728 + (ML20214P506)
- ML20214P507 + (ML20214P507)
- ML20214P508 + (ML20214P508)
- ML20214P510 + (ML20214P510)
- ML20214P512 + (ML20214P512)
- ML20214P514 + (ML20214P514)
- PNO-I-86-075, on 860916,operators Removed Unit 1 from Svc to Repair Steam Leak on High Pressure Turbine Steam Return Line.Leak Caused by Steam Erosion on Section of 20-inch Pipe.Affected Section of Pipe Replaced + (ML20214P515)
- ML20214P516 + (ML20214P516)
- 05000327/LER-1986-050, :on 861030,possible Violation of Surveillance Requirements Discovered.Caused by Error in Surveillance Instruction SI-156.Instruction Will Be Revised to Show Correct Position of Root Valves + (ML20214P517)
- ML20214P519 + (ML20214P519)
- ML20214P520 + (ML20214P520)
- ML20214P521 + (ML20214P521)