Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214J166 + (ML20214J166)
- NRC-87-0049, Forwards History of Instrument & Miscellaneous Connection Problems Pertaining to Main Steam Instrument Line Repairs, Per NRC Request Made at 870428 & 29 Meetings + (ML20214J168)
- ML20214J169 + (ML20214J169)
- ML20214J174 + (ML20214J174)
- ML20214J177 + (ML20214J177)
- ML20214J179 + (ML20214J179)
- ML20214J180 + (ML20214J180)
- ML20214J181 + (ML20214J181)
- TXX-6108, Interim Deficiency Rept CP-86-12 Re Commodity Installations at Secondary Wall Design Gaps.Initially Reported on 860227. Relative Movement Criteria Will Be Included in Insp Procedure to Ensure Min Separation.Next Rept by 870123 + (ML20214J183)
- ML20214J184 + (ML20214J184)
- ML20214J185 + (ML20214J185)
- ML20214J189 + (ML20214J189)
- 05000269/LER-1986-012, Notifies That LER 86-012 Re Inoperability of Standby Shutdown Facility Due to Be Submitted by 861114 Will Be Provided by 870120 + (ML20214J197)
- ML20214J199 + (ML20214J199)
- ML20214J201 + (ML20214J201)
- TXX-6105, Interim Deficiency Rept CP-86-32 Re Through Wall Embedded Conduit Sleeves.Initially Reported on 860421.Field Verification Procedure Issued to Obtain as-built Data. Next Response Anticipated by 870424 + (ML20214J204)
- ML20214J206 + (ML20214J206)
- ML20214J212 + (ML20214J212)
- ML20214J215 + (ML20214J215)
- ML20214J220 + (ML20214J220)
- ML20214J223 + (ML20214J223)
- ML20214J224 + (ML20214J224)
- ML20214J228 + (ML20214J228)
- ML20214J231 + (ML20214J231)
- ML20214J233 + (ML20214J233)
- ML20214J235 + (ML20214J235)
- ML20214J239 + (ML20214J239)
- TXX-6456, Interim Deficiency Rept CP-87-08 Re Accuracy Tolerance of Calibr for Dead Weight Tester Used as Std in Calibr Pressure Instrumentation.Initially Reported on 870420.Next Rept Will Be Submitted by 870721 + (ML20214J240)
- ML20214J242 + (ML20214J242)
- ML20214J243 + (ML20214J243)
- ML20214J245 + (ML20214J245)
- ML20214J248 + (ML20214J248)
- 05000354/LER-1986-081, :on 861023,during Manual Hot Quick Start Initiation of Hpci,Response Time Exceeded Acceptance Criteria of 27 S.Caused by Hydraulic Sys Being Out of Balance & Excessive Ramp Time + (ML20214J249)
- ML20214J251 + (ML20214J251)
- ML20214J253 + (ML20214J253)
- DCL-86-339, Forwards Rev 15 to Physical Security Plan,Per 10CFR73.55 & 50.54(p).Implementation of Changes Expected by 870131. Encls Withheld (Ref 10CFR73.21) + (ML20214J256)
- ML20214J257 + (ML20214J257)
- ML20214J258 + (ML20214J258)
- ML20214J261 + (ML20214J261)
- ML20214J263 + (ML20214J263)
- ML20214J265 + (ML20214J265)
- IR 05000213/1987011 + (ML20214J269)
- ML20214J272 + (ML20214J272)
- ML20214J273 + (ML20214J273)
- A06508, Remits Fee Re 870401 Submittal of Updated Bimonthly Progress Rept & Design Info for New Switchgear Bldg,Per 870422 Request.Fee Required Since NRC Review Requested + (ML20214J276)
- ML20214J279 + (ML20214J279)
- ML20214J280 + (ML20214J280)
- AECM-86-0368, Forwards Emergency Preparedness Transition Plan in Support of 860902 Application to Amend License NPF-29 & CPPR-119,for Energy Resources,Inc to Assume Responsibility for Operation & Const of Plant + (ML20214J283)
- ML20214J285 + (ML20214J285)
- 05000454/LER-1986-030-03, :on 861023,sampling Period for Inoperable Radiation Monitor Delayed for 12 H.Caused by Personnel Error,Memo Issued Reemphasizing Notification Procedures.W/ + (ML20214J286)
- ML20214J287 + (ML20214J287)