Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214H697 + (ML20214H697)
- ML20214H702 + (ML20214H702)
- ML20214H704 + (ML20214H704)
- ML20214H705 + (ML20214H705)
- ST-HL-AE-2181, Provides Addl Info,Per ,Re 125-volt Dc Control Power for 13.8 Kv Switchgear.Stp Design Provides Two Sources of Dc Power Via Automatic Switches.Design Provides Degree of Safety & Reliability.Deviation Requested + (ML20214H711)
- ML20214H712 + (ML20214H712)
- ML20214H715 + (ML20214H715)
- ML20214H717 + (ML20214H717)
- ML20214H720 + (ML20214H720)
- ML20214H721 + (ML20214H721)
- ML20214H728 + (ML20214H728)
- ML20214H729 + (ML20214H729)
- ML20214H743 + (ML20214H743)
- B12292, Forwards Reviews for Isap Topics 1.23, Post-Accident Hydrogen Monitors & 1.63, Hydrogen Control, Per 850517 Commitment + (ML20214H746)
- 0CAN018203, Forwards Onsite & Offsite Objectives for 1987 Radiological Emergency Preparedness Exercise Scheduled for 870318. Detailed Schedule of pre-exercise Briefings & post-exercise Critiques During 870316-20 Will Be Submitted as Required + (ML20214H750)
- ML20214H752 + (ML20214H752)
- ML20214H754 + (ML20214H754)
- ML20214H755 + (ML20214H755)
- B12330, Advises That Util Considers Tests on Isolation Devices of SPDS Described in Successful.Acceptance Criteria for Max Credible Faults Testing to Observe No Measurable Effects on Isolator Input W/Digital Storage Scope + (ML20214H758)
- ML20214H766 + (ML20214H766)
- 0CAN028701, Forwards Complete Scenario for 1987 Radiological Emergency Preparedness Exercise,Per 45-day pre-exercise Requirement. Pre-exercise Briefings for Observers/Controllers & post- Exercise Critiques for 870316-20 Also Encl + (ML20214H776)
- B12313, Forwards Addl plant-specific Info Re Instrumentation Uncertainties,Operator Training & Procedures for Manual Trip of Reactor Coolant Pumps,Per 860529 Generic Ltr 86-06, Implementation of TMI Action Item II.K.3.5.. + (ML20214H782)
- PLA-2757, Requests Approval of Encl Change Y to Physical Security Plan,Per Requirements of 10CFR73.55 & 73.55(d).Change Y Withheld (Ref 10CFR73.21) + (ML20214H791)
- ML20214H794 + (ML20214H794)
- BECO-86-178, Submits 1986 Main Breakwater Surveillance Rept,Per Requirements of Breakwater Continuous Monitoring Program.No Damage or Major Stone Movement Occurred Since 1985 Rept. Supporting Photographs & One Oversize Drawing Encl + (ML20214H795)
- ML20214H796 + (ML20214H796)
- ML20214H807 + (ML20214H807)
- ML20214H812 + (ML20214H812)
- ML20214H817 + (ML20214H817)
- ML20214H819 + (ML20214H819)
- ML20214H822 + (ML20214H822)
- B12301, Forwards Addl Info Re Deviation from Rev 2 to Reg Guide 1.97 Concerning Containment Sump Water Temp Instrumentation,Per 861114 Telcon Request + (ML20214H823)
- ML20214H827 + (ML20214H827)
- ML20214H830 + (ML20214H830)
- ML20214H833 + (ML20214H833)
- ML20214H836 + (ML20214H836)
- ML20214H840 + (ML20214H840)
- ML20214H841 + (ML20214H841)
- ML20214H847 + (ML20214H847)
- ML20214H848 + (ML20214H848)
- ML20214H851 + (ML20214H851)
- IR 05000327/1986050 + (ML20214H852)
- ML20214H857 + (ML20214H857)
- ML20214H859 + (ML20214H859)
- ML20214H863 + (ML20214H863)
- ML20214H864 + (ML20214H864)
- ML20214H865 + (ML20214H865)
- ML20214H868 + (ML20214H868)
- IR 05000327/1986004 + (ML20214H869)
- ML20214H879 + (ML20214H879)
- ML20214H884 + (ML20214H884)