Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214G273 + (ML20214G273)
- ML20214G275 + (ML20214G275)
- ML20214G278 + (ML20214G278)
- ML20214G280 + (ML20214G280)
- ML20214G284 + (ML20214G284)
- ML20214G294 + (ML20214G294)
- ML20214G295 + (ML20214G295)
- ML20214G301 + (ML20214G301)
- ML20214G304 + (ML20214G304)
- ML20214G305 + (ML20214G305)
- ML20214G310 + (ML20214G310)
- ML20214G313 + (ML20214G313)
- ML20214G314 + (ML20214G314)
- ML20214G315 + (ML20214G315)
- ML20214G317 + (ML20214G317)
- 05000454/LER-1987-010-05, :on 870419,Tech Spec 3.0.3 Entered Due to Two Trains of Main Control Room Ventilation Being Inoperable. Caused by Drift of High Differential Pressure Switch. Differential Pressure Switch Recalibr + (ML20214G320)
- ML20214G321 + (ML20214G321)
- PNO-I-87-043, on 870514,during Reactor Trip Breaker Response Time Testing,Reactor Trip Occurred.Steam Generator Feedwater Isolation Pressure Transient Resulted in Failure of Two Lines to Thermal Relief Valves.Cause Under Investigation + (ML20214G324)
- ST-HL-AE-2174, Forwards One Oversize Drawing Containing safety-related balance-of-plant Setpoints.Setpoints Determined Using Westinghouse Setpoint Methodology Submitted in Util + (ML20214G326)
- ML20214G327 + (ML20214G327)
- ML20214G331 + (ML20214G331)
- ML20214G335 + (ML20214G335)
- ML20214G337 + (ML20214G337)
- ML20214G338 + (ML20214G338)
- ML20214G340 + (ML20214G340)
- ML20214G342 + (ML20214G342)
- ML20214G346 + (ML20214G346)
- ML20214G348 + (ML20214G348)
- ML20214G351 + (ML20214G351)
- ML20214G357 + (ML20214G357)
- 05000321/LER-1987-007-01, :on 870418,isolations on Valve Groups 3 & 4 Occurred.Caused by Surveillance Procedure Not Containing Complete List of Links to Open & Jumpers to Be Installed to Prevent Actuations.Procedure Revised + (ML20214G362)
- ML20214G363 + (ML20214G363)
- ML20214G364 + (ML20214G364)
- ML20214G365 + (ML20214G365)
- ML20214G366 + (ML20214G366)
- TXX-6447, Responds to NRC 870408 Request for Addl Info Re Violations & Deviations Noted in Insp Repts 50-445/86-15 & 50-446/86-12. Failure of Overview Insp to Note Inconsistency Was Oversight.Overview Inspector Received Addl Training + (ML20214G368)
- ML20214G370 + (ML20214G370)
- ML20214G384 + (ML20214G384)
- ML20214G387 + (ML20214G387)
- ML20214G390 + (ML20214G390)
- IA-86-760, Forwards Electrical,Instrumentation & Control Sys Branch Site Rept on 860128-30 Audit.Cable Separation Concerns Resolved.List of Attendees Encl + (ML20214G393)
- ML20214G393 + (ML20214G393)
- ML20214G395 + (ML20214G395)
- ML20214G397 + (ML20214G397)
- ML20214G401 + (ML20214G401)
- ML20214G403 + (ML20214G403)
- ML20214G404 + (ML20214G404)
- ML20214G405 + (ML20214G405)
- ML20214G406 + (ML20214G406)
- ML20214G408 + (ML20214G408)
- ML20214G412 + (ML20214G412)