Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20213D820 + (ML20213D820)
- ML20213D822 + (ML20213D822)
- ML20213D824 + (ML20213D824)
- ML20213D825 + (ML20213D825)
- ML20213D826 + (ML20213D826)
- ML20213D827 + (ML20213D827)
- ML20213D828 + (ML20213D828)
- ML20213D829 + (ML20213D829)
- ML20213D830 + (ML20213D830)
- FVY-86-104, Forwards Responses to Remaining 11 Questions Re NRC Review of RELAP5YA Computer Program for LWR Sys Thermal Hydraulic Analysis + (ML20213D831)
- ML20213D833 + (ML20213D833)
- ML20213D835 + (ML20213D835)
- ML20213D836 + (ML20213D836)
- ML20213D837 + (ML20213D837)
- ML20213D838 + (ML20213D838)
- ML20213D840 + (ML20213D840)
- 05000389/LER-1986-014-01, :on 861008,discovered Surveillance Interval for Hot Shutdown Control Panel Instrumentation Exceeded.Caused by Personnel Error.Departmental Surveillance/Testing Schedule Procedure Implemented + (ML20213D843)
- ML20213D845 + (ML20213D845)
- IR 05000219/1986029 + (ML20213D847)
- ML20213D850 + (ML20213D850)
- ML20213D853 + (ML20213D853)
- ML20213D856 + (ML20213D856)
- ML20213D858 + (ML20213D858)
- ML20213D859 + (ML20213D859)
- ML20213D860 + (ML20213D860)
- ML20213D863 + (ML20213D863)
- ML20213D865 + (ML20213D865)
- IR 05000302/1986032 + (ML20213D866)
- ML20213D867 + (ML20213D867)
- ML20213D870 + (ML20213D870)
- 05000482/LER-1986-056, :on 861010,discovered That Improper Method Used for Verifying Boron Dilution Alarm Setpoint of Source Range Nuclear Instrumentation.Caused by Error in Vendor Manual. Proper Voltage Settings Incorporated in Manual + (ML20213D872)
- ML20213D873 + (ML20213D873)
- 05000341/LER-1986-035, :on 861005,manual Reactor Trip Occurred Due to Malfunctioning Gland Sealing Steam Pressure Regulator. Pressure Regulator Controls Recalib & Torque Switches Reset + (ML20213D874)
- ML20213D877 + (ML20213D877)
- 05000301/LER-1986-006, :on 861002,04 & 08,reactor Trip Signals Generated.Caused by Blown Fuse,Erroneous Voltage on Signal Cable & Voltage Fluctuation on Instrument Bus,Respectively. Procedures for Instrument Tests Revised + (ML20213D879)
- ML20213D881 + (ML20213D881)
- ML20213D882 + (ML20213D882)
- ML20213D884 + (ML20213D884)
- ML20213D886 + (ML20213D886)
- ML20213D889 + (ML20213D889)
- IR 05000458/1986036 + (ML20213D891)
- ML20213D892 + (ML20213D892)
- ML20213D893 + (ML20213D893)
- ML20213D895 + (ML20213D895)
- ML20213D897 + (ML20213D897)
- ML20213D899 + (ML20213D899)
- ML20213D900 + (ML20213D900)
- ML20213D903 + (ML20213D903)
- 05000324/LER-1986-023-01, :on 861009,primary Containment Group 4 Isolation of HPCI Sys Occurred.Caused by Loss of Electrical Continuity at Terminal Connections of Thermocouple Leads. Thermocouple Lead Terminations Improved + (ML20213D905)
- ML20213D906 + (ML20213D906)
- SNRC-1294, Discusses IE Compliance Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Design Deficiency Does Not Exist at Plant + (ML20213D907)