Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212F794 + (ML20212F794)
- ML20212F798 + (ML20212F798)
- ML20212F799 + (ML20212F799)
- ML20212F800 + (ML20212F800)
- ML20212F802 + (ML20212F802)
- RBG-25094, Forwards Rev 5 to Security Training & Qualification Plan & Explanation of Changes.Encls Withheld (Ref 10CFR73.21) + (ML20212F803)
- 05000354/LER-1999-009, :on 990820,license Condition Violation Re Min FW Temp Limits Were Noted.Caused by Lightning Strike. Recovered & Restored Plant Sys Affected by Electrical Transient + (ML20212F804)
- ML20212F805 + (ML20212F805)
- ML20212F808 + (ML20212F808)
- ML20212F809 + (ML20212F809)
- ML20212F810 + (ML20212F810)
- ML20212F812 + (ML20212F812)
- ML20212F814 + (ML20212F814)
- ML20212F817 + (ML20212F817)
- NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl + (ML20212F818)
- ML20212F819 + (ML20212F819)
- ML20212F820 + (ML20212F820)
- ML20212F822 + (ML20212F822)
- ML20212F823 + (ML20212F823)
- ML20212F825 + (ML20212F825)
- RBG-25418, Unit 1 Semiannual Radioactive Effluent Release Rept Addendum,Jul-Dec 1986 + (ML20212F826)
- ML20212F827 + (ML20212F827)
- NSD-NRC-97-5399, Forwards non-proprietary Rev 1 to WCAP-14408, Wgothic Application to AP600 + (ML20212F829)
- ML20212F834 + (ML20212F834)
- ML20212F835 + (ML20212F835)
- ML20212F836 + (ML20212F836)
- RBG-44283, Provides Notification of Completion of Plant Core Shroud Insp,In Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs + (ML20212F837)
- ST-HL-AE-1951, Forwards Annotated Revs to FSAR Section 9.4.7.1 & Table 9.4-2.7 Re Miscellaneous Bldgs HVAC Sys.Revs Delete Ref of Cement Unloading Bldg Since Bldg No Longer Utilized for That Purpose.Revs Will Be Incorporated Into FSAR Amend 59 + (ML20212F840)
- ML20212F842 + (ML20212F842)
- IR 05000412/1986043 + (ML20212F844)
- ML20212F846 + (ML20212F846)
- ML20212F847 + (ML20212F847)
- ML20212F849 + (ML20212F849)
- ML20212F850 + (ML20212F850)
- ML20212F854 + (ML20212F854)
- ML20212F855 + (ML20212F855)
- ML20212F857 + (ML20212F857)
- PNO-III-86-154, on 861222,reactor Tripped from 15% Power During Testing of Integrated Control Sys.Caused by Decrease in Steam Generator Water Level Due to Feedwater Sys Control Valve Closure.Licensee Investigating Cause of Valve Closure + (ML20212F858)
- ML20212F860 + (ML20212F860)
- IR 05000333/1999007 + (ML20212F861)
- ML20212F863 + (ML20212F863)
- ML20212F864 + (ML20212F864)
- ML20212F865 + (ML20212F865)
- IR 05000250/1986036 + (ML20212F866)
- ML20212F867 + (ML20212F867)
- W3P87-0501, Advises That Rev 4 to Safeguards Contingency Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable + (ML20212F869)
- ML20212F871 + (ML20212F871)
- ML20212F872 + (ML20212F872)
- ML20212F875 + (ML20212F875)
- ML20212F877 + (ML20212F877)
- ML20212F878 + (ML20212F878)