October 31, t997 Mr. Wilfred C.' LaRochelle, Manager, Quahty Assurance Hartford Steam Boiler inspection and Insurance Company One State Street P.O. Box 5024 Hartford CT 06103 3102
SUBJECT:
REPLY TO NOTICE OF NONCONFORMANCE
Dear Mr. LaRochelle:
Thaftk you fnr your letter dated September 29,1997, in response to the Notice of Nonconformance that was issued by the Nuclear Regulatory Commission (NRC) on August 29, 1997, as a result of an NRC inspection of the Hartfora Steam Boiler inspection and Insurance Company (Inspection Report 99900601/97-01).
We have reviewed your reply and found it responsive to the concerns raised in the Notice of Nonconformance. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC's Public Document Room.
Sincerely, Original signed by: Suzanne C. Black Suzanne C. Black, Chief Quality Assurance, Vendor inspection and Maintenance Branch Divisloa of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation Docket No:. 99900601 Distribution:
HQMB R/F 01
- Central Files -
PDR White Book
- SEE PREVIOUS CONCURRENCE DOCUMENT NAME: G:\ draft \cwalina\hsb.clo T* receive a copy of this document,irdcate in the box: "C* = Copy without enclosures *E" = Copy with enclosures *N* = No copy 0FFICE HOMB:DRCH C HOMB:DRCH \ HOMB:0RCH C HOMB:DRCH h)
NAME GCCwalina RPMcIntyre RAGram \'Z(a SCBlack 4/5 -
DATE 10/17/97* 10/17/97* 1040/97 10/4/97 GFFICIAL RECORD COPY .
9711050131 971031
. -4 g1 ,1, J3, m kv JM( ,. r PDR GA999 ELOHARTF 99900601 PDR d b- O [
- "4 1 0 ll!IliIll.lll. l.ll-l ll y,J ptr -e % ; _m ,u - : w ,,, em ; e ,
lL 0 A4t y ;,
m -October 31, 1997 Mr. Wilfred C. LaRochelle, Manager, Quality Assurance L Hartford Steam Boiler inspection and Insurance Company One State Street P.O. Box 5024 Hartford CT 06103-3102
SUBJECT:
REPLY TO NOTICE OF NONCONFORMANCE
Dear Mr. LaRochelle:
8 Thank you for your letter dated September 29,1997, in response to the Notice of Nonconformance that was issued by the Nuclear Regulatory Commission (NRC) on August 29, 1997, as o result of an NRC inspection of the Hartford Steam Boiler Inspection and Insurance Comp.sny (Inspection Report 99900601/97-01).
k 3 We have reviewed your reply and found it responsive to the concems raised in the Notice of 7
Nonconformance. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained, in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC's Public Document Room.
Sincerely, Original signed by: Suzanne C. Black Suzanne C. Black, Chief Quality Assurance, Vendor Inspection and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation Docket No:. 99900601 Distribution:
HQMB R/F Central Files PDR White Book
- SEE PREVIOUS CONCURRENCE DOCUMENT NAME: G:\ draft \cwalina\hsb.clo To receive a copy of this document, indcote in the boa: "C" = Copy without en Josures *E* = Copy with enclosures *N' = No copy 0FFICE HOMB:DRCH C HOMB:0RCH HOMB:DRCH C HOMB:DRCH td NAME GCCwalina RPMcIntyre RAGram (L6 SCBlack %
DATE 10/17/97* 10/17/97* 10/bO/97 10/33/97 0FFICIAL RECORD COPY
_ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _