Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212A467 + (ML20212A467)
- ML20212A469 + (ML20212A469)
- ML20212A470 + (ML20212A470)
- ML20212A472 + (ML20212A472)
- PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages + (ML20212A473)
- ML20212A475 + (ML20212A475)
- ML20212A476 + (ML20212A476)
- ML20212A477 + (ML20212A477)
- ML20212A478 + (ML20212A478)
- ML20212A481 + (ML20212A481)
- IR 05000133/1986003 + (ML20212A484)
- ML20212A485 + (ML20212A485)
- ML20212A486 + (ML20212A486)
- ML20212A488 + (ML20212A488)
- IR 05000424/1986051 + (ML20212A489)
- ML20212A490 + (ML20212A490)
- ML20212A491 + (ML20212A491)
- ML20212A492 + (ML20212A492)
- ML20212A493 + (ML20212A493)
- ML20212A494 + (ML20212A494)
- ML20212A495 + (ML20212A495)
- ML20212A497 + (ML20212A497)
- A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With + (ML20212A498)
- ML20212A499 + (ML20212A499)
- PNO-III-86-071, on 860719,lightning Struck Main Transmission Line Immediately Adjacent to Plant,Resulting in Loss of All Offsite Power.Both Diesel Generators Automatically Started, Picking Up All Vital Loads as Designed.Power Restored + (ML20212A500)
- ML20212A502 + (ML20212A502)
- IR 05000483/1999008 + (ML20212A503)
- ML20212A505 + (ML20212A505)
- ML20212A506 + (ML20212A506)
- ML20212A507 + (ML20212A507)
- ML20212A508 + (ML20212A508)
- 1CAN028704, Advises That Response to 870107 Request for Addl Info Re NUREG-0737,Item II.D.1 on Performance Testing of Relief Valves Will Be Submitted by 870407 + (ML20212A509)
- ML20212A512 + (ML20212A512)
- ML20212A513 + (ML20212A513)
- ML20212A515 + (ML20212A515)
- IR 05000424/1986053 + (ML20212A517)
- ML20212A519 + (ML20212A519)
- ML20212A520 + (ML20212A520)
- ML20212A521 + (ML20212A521)
- LR-N970675, Forwards Monthly Operating Rept for Hope Creek Generating Station for Sept 1997.Also Includes Summary of Changes,Tests & Experiments Implemented During Aug 1997.Refueling Info Also Provided + (ML20212A524)
- ML20212A525 + (ML20212A525)
- ML20212A527 + (ML20212A527)
- AECM-86-0217, Responds to Violations Noted in Insp Rept 50-416/86-14. Corrective Actions:Health Physics Personnel Given Supplemental Training on Tech Spec Requirements for Maintaining Very High Radiation Doors Locked + (ML20212A528)
- ML20212A530 + (ML20212A530)
- U-600568, Responds to NRC Re Violations Noted in Insp Rept 50-461/85-60.Corrective Actions:Hole Repaired & Local Leak Rate Test Completed.Further Insp of Containment Liner Being Conducted + (ML20212A531)
- ML20212A534 + (ML20212A534)
- ML20212A536 + (ML20212A536)
- PNO-I-86-099, on 861217,four Spent Mo-99/Tc99m Generators Reported Stolen from Carrier Van While Parked at Driver Residence in Philadelphia,Pa.On 861217,three Generators Found.As of 861218,one Generator Still Missing + (ML20212A537)
- L-97-043, Responds to NRC Re Violations Noted in Insp Repts 50-334/97-05 & 50-412/97-05 on 970818.Corrective Actions: Management Expectations Re Use of Current Programs for Troubleshooting Energized Equipment Have Been Reinforced + (ML20212A538)
- ML20212A542 + (ML20212A542)
- ML20212A544 + (ML20212A544)