Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211H229 + (ML20211H229)
- ML20211H230 + (ML20211H230)
- ML20211H232 + (ML20211H232)
- ML20211H235 + (ML20211H235)
- ML20211H236 + (ML20211H236)
- ML20211H238 + (ML20211H238)
- ST-HL-AE-1705, Submits Revised Response to IE Bulletin 77-07, Containment Electrical Penetration Assemblies at Nuclear Power Plants Under Const. Util Electrical Penetration Suppliers Are Westinghouse & Conax Buffalo Corp + (ML20211H244)
- ML20211H246 + (ML20211H246)
- A06347, Forwards Fee for 861124 Request for Deferrment of Completion of Switchgear Room Halon Sys Mods to 1987 Refueling Outage or First Outage of Last 8 Wk Duration Commencing After 870101 + (ML20211H247)
- ML20211H248 + (ML20211H248)
- ML20211H249 + (ML20211H249)
- ML20211H251 + (ML20211H251)
- ML20211H252 + (ML20211H252)
- 05000263/LER-1986-014, :on 860515,reactor Protection Sys Trip Occurred.Caused by Noise Spike on Intermediate power- Range Monitor 14 Tripping Channel a of Reactor Protection Sys.Channel a Trip Reset + (ML20211H253)
- ML20211H257 + (ML20211H257)
- ML20211H258 + (ML20211H258)
- ML20211H264 + (ML20211H264)
- ML20211H266 + (ML20211H266)
- ML20211H267 + (ML20211H267)
- ML20211H268 + (ML20211H268)
- ST-HL-AE-1858, Forwards Vols 1-3 of Electrical Separation Verification Test Rept... Used by Wyle Labs to Demonstrate That Sys Test Procedure in Compliance W/Requirements of Reg Guide 1.75,per SER Open Item 9 + (ML20211H272)
- ML20211H273 + (ML20211H273)
- ML20211H274 + (ML20211H274)
- B12284, Application for Amend to License DPR-65,providing Limiting Conditions & Surveillance Requirements in Accordance W/ NUREG-0737 & Generic Ltr 83-37.Fee Paid + (ML20211H279)
- 05000312/LER-1987-010, :on 870119,electrical Configuration for RCS High Point Valves Found in Noncompliance w/10CFR50,App R. Caused by Inadequate Assessment of Hot Short Effects.Design of Valves Will Be Modified,Per 10CFR50,App R + (ML20211H280)
- ML20211H282 + (ML20211H282)
- ST-HL-AE-1919, Forwards Revised FSAR Table 3.11-1, Environ Conditions, Incorporating Revs to Bechtel Design Criteria & Results of Calculation Verification.Revised Table Will Be Incorporated as Part of Amend 58 to FSAR + (ML20211H283)
- ML20211H284 + (ML20211H284)
- ML20211H286 + (ML20211H286)
- ML20211H287 + (ML20211H287)
- ML20211H288 + (ML20211H288)
- ML20211H290 + (ML20211H290)
- ML20211H291 + (ML20211H291)
- ML20211H294 + (ML20211H294)
- ML20211H298 + (ML20211H298)
- ML20211H299 + (ML20211H299)
- ML20211H302 + (ML20211H302)
- 05000220/LER-1986-013, :on 860518,reactor Bldg Emergency Ventilation Sys Initiated Due to Blown Fuse.Caused by Damaged Timer Relay.Timer Repaired,Fuse Replaced & Sys Returned to Svc.W/ + (ML20211H305)
- 05000250/LER-1987-005, :on 870119,w/unit in Mode 2,control Room Ventilation Isolated & Switched to Recirculation Mode & Containment Vent Isolated.Caused by Process Radiation Monitor Spike.Equipment Being Evaluated + (ML20211H306)
- ML20211H308 + (ML20211H308)
- L-86-491, Forwards Comments on Exam Administered on 861117.Attachment Suppls & Replaces Comments Provided at 861120 Exam Exit Meeting & Contained in Util + (ML20211H309)
- 05000338/LER-1986-008-02, :on 860520,reactor Trip Occurred Due to Closure of All Three Main Feedwater Regulating Valves.Caused by Spurious Actuation of Feedwater Isolation Relay for Feedwater Regulating Valves + (ML20211H310)
- 05000458/LER-1986-057, :on 860923,during Surveillance Test Procedure STP-207-4210,RCWU Sys Isolated.Caused by Inadvertent Grounding of Electrical Jumper Resulting in Blown Fuse.Fuse Replaced.Rcwu Isolation Reset + (ML20211H311)
- ML20211H312 + (ML20211H312)
- ML20211H315 + (ML20211H315)
- TXX-6291, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.Resolution of Open QC Insp Items Continuing & Scheduled for Completion by 870630.Next Rept Will Be Submitted by 870721 + (ML20211H316)
- ML20211H321 + (ML20211H321)
- ML20211H322 + (ML20211H322)
- HBL-86-032, Forwards PG&E Responses to Public Comments on Des for Decommissioning Humboldt Bay Unit 3. Ack Receipt of Matl on Encl Ltr Requested + (ML20211H323)
- IR 05000528/1986017 + (ML20211H324)
- TXX-6282, Final Deficiency Rept CP-86-66 Re Noncontact Lap Splices in Auxiliary Bldg.Initially Reported on 860926.Engineering Calculations & Review of Applicable Quality Documents Completed.Issue Not Reportable Per 10CFR50.55(e) + (ML20211H330)